Tender Value
₹93.8 L
EMD Value
₹6.7 L
Closing Date
25 Sept 2026, 12:00 pm3d left
SE, Unnao Circle, Unnao
SE, Unnao Circle, Unnao
Construction of Box Culvert 5x4 mtrs height400mtr BUA Marg to Makhdum nagar via Gopalpur Sharda nahar
2026_CEUCZ_1187725_6
3900MT/1MT/E-Tender/UC/2026 date 09-09-2026
Open Tender
Civil Works - Bridges
Fixed-rate
90 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹6.7 L
Yes
19 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures,like culverts,bridges,retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. | 292 | cum | 485 | ₹1,41,620 |
| 2 | Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. | 460 | cum | 62 | ₹28,520 |
| 3 | Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.(In Bridge Work)( Including Labour Cess And Excluding G.S.T.) | 3.68 | cum | 6,700 | ₹24,656 |
| 4 | Plane/Reinforced Cement concrete in open foundation complete as per drawing and Technical Specifications. M15 (In Bridge Work).( Including Labour Cess And Excluding G.S.T.) | 34 | cum | 7,400 | ₹2,51,600 |
| 5 | Sand Filling Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 .( Encluding Labour Cess And Excluding G.S.T.) | 56 | cum | 910 | ₹50,960 |
| 6 | Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations (In Bridge Work).( Encluding Labour Cess And Excluding G.S.T.) | 77 | cum | 8,590 | ₹6,61,430 |
| 7 | Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification.(In Bridge Work).( Encluding Labour Cess And Excluding G.S.T.) | 56 | sqm | 85 | ₹4,760 |
| 8 | Providing weep holes in brick massonry abutment wing walls/ return wall with 100mm dia AC pipe, extented to the full widthof the structure with slope 1V:20H.( Encluding Labour Cess And Excluding G.S.T.) | 34 | Rm | 105 | ₹3,570 |
| 9 | Furnishing and placing reintforced cement concrete in super structure as per drawing and Technical Specifications. M30 (Including Labour Cess And Excluding G.S.T.) | 316 | cum | 10,100 | ₹31,91,600 |
| 10 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses..( Including Labour Cess And Excluding G.S.T.) | 28 | mt | 88,150 | ₹24,68,200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tendernotice_2.pdf
PDF • 1.31 MB
BOQ_2236824.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .