| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical | Rejected-Technical Section 2- 4.7(i) |
| 2 | Rejected-Technical 121004 | Rejected-Technical Section 2- 4.2(g), 4.4B(b)(i),4.4B(b)(ii), |
Tender Value
₹14.1 Cr
EMD Value
₹14.1 L
Closing Date
4 May 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER, JSRRDA
JSRRDA, 3RD FLOOR, FFP BUILDING, DHURWA, RANCHI, JHARKHAND
Construction and Maintenance of Roads
2022_CEJHR_117614_3
e-Tender No.- 05 /2022-23
Open Tender
Civil Works - Roads
Item Rate
300 days
GIRIDIH
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹14.1 L
Yes
26 May 2022
27 Apr 2022
5 May 2022
27 Apr 2022
4 May 2022
27 Apr 2022
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road-(1)-Kamlasingha-Pandeydih Road-5.150 Km
Setting out etc all complete job as per specification and directioni of E/I | 5.15 | Per km | 2,513.55 | ₹12,944.8 |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification Clause 201. | 35,168 | Per Sqm | 4.19 | ₹1,47,494.59 |
| 3 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. | 15 | per M | 144.46 | ₹2,166.9 |
| 4 | Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 3,263.75 | Per Cum. | 104.34 | ₹3,40,539.68 |
| 5 | Construction of Embankment with Material Obtained from Roadway Cutting.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification | 1,613.73 | Per Cum. | 57.47 | ₹92,741.06 |
| 6 | Compacting original ground supporting subgrade: Loosening, of the ground upto level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of of Tables 300.1 and 300.2 for subgrade construction as per Technical Spe | 6,286.3 | Per Cum. | 22.38 | ₹1,40,687.39 |
| 7 | Construction of embankment with approved material obtained from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 FREE LEAD | 5,331.61 | Per Cum. | 123.85 | ₹6,60,319.9 |
| 8 | Construction of embankment with approved material obtained from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 LEAD UPTO 250M | 5,331.61 | Per Cum. | 163.25 | ₹8,70,385.33 |
| 9 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. | 15,994.83 | Per Cum. | 202.64 | ₹32,41,192.35 |
| 10 | Gravel/Soil-Aggregate Surface Course (Table 400.3) - Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 MOORUM SOR NO 4.11(I) | 1,012.95 | Per Cum. | 610.12 | ₹6,18,021.05 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_189094.xls
BOQ Document • 0.42 MB
97066308.pdf
Tender Document • 2.72 MB
JH-LWE-GIR-04_21-22.pdf
Tender Document • 1.73 MB
97066310.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .