| 1 | 1₹9.6 LAccepted-AOC DHAMARAIPAKKAM BUILDING AT PUES IN DHAMARAIPAKKAM PANCHAYAT | ₹9.6 L | 1 | Accepted-AOC lowest amount quotted |
| 2 | 2₹9.6 LRejected-AOC | ₹9.6 L | 2 | Rejected-AOC highest amount quotted |
| Sl No | Description | Qty | Unit | SSKT ENTERPRISES L1 | KBJ CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Construction of Kariyamedai in Kutiyam Panchayat | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 22.63 | Cum | 263 ₹5,952 | 265 ₹5,997 |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 8.01 | Cum | 5,393 ₹43,198 | 5,395 ₹43,214 |
| 1.03 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 12.66 | Cum | 6,488.5 ₹82,144 | 6,488.5 ₹82,144 |
| 1.04 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 17.1 | Cum | 9,302 ₹1.6 L | 9,302 ₹1.6 L |
| 1.05 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 29.57 | Sqm | 547.5 ₹16,190 | 547.5 ₹16,190 |
| 1.06 | Column above grade beam | 21.49 | Sqm | 1,095 ₹23,532 | 1,095 ₹23,532 |
| 1.07 | Roof slab | 103.59 | Sqm | 1,095 ₹1.1 L | 1,095 ₹1.1 L |
| 1.08 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | 1.4 | MT | 91,951 ₹1.3 L | 91,951 ₹1.3 L |
| 1.09 | Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked lime over the RCC Roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete with the wooden batters etc as per standard specifications . | 2.88 | Cum | 4,271.5 ₹12,302 | 4,290 ₹12,355 |
Tender Value
Refer Docs
EMD Value
₹9,660
Closing Date
4 Feb 2026, 3:00 pmClosed
president
Panchayat office kuttiyam
Construction of Kariyamedai in Kutiyam Panchayat
2026_RDTN_650161_1
B1/01/2025
Open Tender
Civil Works - Buildings
180 days
Panchayat office kuttiyam
Construction of Kariyamedai in Kutiyam Panchayat
2 documents required · 2 mandatory
₹0
₹9,660
Panchayat office kuttiyam
17 Feb 2026
2 Feb 2026
4 Feb 2026
2 Feb 2026
4 Feb 2026
2 Feb 2026
2 Feb 2026
Construction of Kariyamedai in Kutiyam Panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.
Column above grade beam
Roof slab
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked lime over the RCC Roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete with the wooden batters etc as per standard specifications .
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
Plastering with cement mortar 1:3, 10mm thick including cost and conveyance and all labour charges etc.
Paving the floor with Vertified tiles including all cost and conveyance and etc complete
Paving the floor with scratch proof ceramic tiles including all cost and conveyance and etc complete
Painting two coat with approved quality of distemper with colour over one coat of white cement for primier coat for the base including preparing surface and all materials cost labour etc
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc complete.
Provision for Electrical arrangements
Provision for Water Supply arrangements
Provision for Name Board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
ceremonytdoc.pdf
Tender Documents • 0.44 MB
BOQ_779507.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid