Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.3 LAccepted-Finance | 1 | Accepted-Finance Price Bid is evaluated | |
| 2 | 2₹19.3 L+₹5.0 L (35.1%)Accepted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | 2 | Accepted-Finance Price Bid is evaluated | |
| 3 | Rejected-Technical NO 1 3RD FLOOR HAMEEDIA COMPLEX 108 TRIPLICANE HIGH ROAD TRIPLICANE CHENNAI 600 005 | CHENNAI | CHENNAI | TAMIL NADU | 600005 | - | Rejected-Technical BQR-3 not satisfied | |
| 4 | Rejected-Technical 11 7 PARMAL COLONY LAKKARPUR RAILWAY CROSSING LAKKARPUR FARIDABAD FARIDABAD HARYANA 121003 UDYAM DL 09 0001967 06AABCI9677H1Z6 R M MSME STATUS AS VERIFIED | FARIDABAD | HARYANA | 121003 | - | Rejected-Technical BQR-3 not satisfied | |
| 5 | Rejected-Technical | - | Rejected-Technical BQR conditions are not satisfied |
Tender Value
Refer Docs
EMD Value
₹15,800
Closing Date
13 Mar 2021, 2:00 pmClosed
SE / M-II / TTPS
Superintending Engineer, Mechanical-II, Tuticorin Thermal Power Station, Tuticorin 628004.
TTPS Mech II TM I Unit I Capital overhaul 2020 21Removal of Insulation over the HP IP casing and middle part of LP casing and re insulation over the same after completion of overhaul including supply of insulating material
2021_EB_198658_1
SE / M-II / TTPS / Spec.No.364/2020-21
Open Tender
Miscellaneous Works
Item Rate
5 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹15,800
Yes
24 Mar 2021
25 Feb 2021
15 Mar 2021
25 Feb 2021
13 Mar 2021
25 Feb 2021
HP/IP Top casing and Control valve: Removal of existing ceramic blanket insulation and re-insulation with 225mm thickness ceramic blanket over the HP and IP casing, Control Valves including supply of the insulating material
HP/IP Bottom casing: Removal of existing ceramic blanket insulation and re-insulation with 250mm thickness ceramic blanket over the HP and IP casing, Control Valves, including supply of the insulating material
Removal of Double layer lagging and cladding in LP turbine middle part
Re-insulation of Double layer lagging and cladding in LP turbine middle part, including supply of the insulating material
Charges for disposal, cleaning and transportation of waste insulation material from work spot to ear marked area to dump.
Replastering with puffing fluff / cement mixture on the insulated area of high temperature steam pipe lines, valves, turbine casings and Strainer, including supply of the insulating material. (HP/IP casings and control valves)
Painting in HPT/IPT Casing and control valves areas with two coat of enamel paint including cost of paint.
R RAMACHANDRAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .