Constrution of New Road work Summerpur Distt Pali
2026_CEPWD_570314_14
NIT No 05 of 2026-27 ACE PWD Zone I Jodhpur
Open Tender
Civil Works - Roads
210 days
Pali
As per Tender documents
7 documents required · 7 mandatory
₹5,000
As per Tender documents
₹9.7 L
Yes
25 Jun 2026
25 Jun 2026
17 Jul 2026
25 Jun 2026
16 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (i) Construction of New Connectivity roads from Parakhiya to Biroliya Road km 0/00 to 4/500 :- Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MORTH specification clause 201By mechanical Means .A. In area of non thorny jungle | 2.1 | Hect. | 10,374 | ₹21,785.4 |
| 2 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 3,780 | Cum | 45 | ₹1,70,100 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 10,125 | Cum | 44 | ₹4,45,500 |
| 4 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means.For Grading-II Material | 2,220.15 | Cum | 751 | ₹16,67,332.65 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. grading III | 2,769.75 | Cum | 407 | ₹11,27,288.25 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km. | 2,047.5 | Cum | 1,044 | ₹21,37,590 |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate By Mechanical Means | 216.45 | Cum | 1,002 | ₹2,16,882.9 |
| 8 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 13,125 | Sqm | 28 | ₹3,67,500 |
| 9 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 13,125 | Sqm | 10 | ₹1,31,250 |
| 10 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500-7 premixed with bituminous binder, transported to site with all leads laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per MoRTH Specification Clause 504. Bitumen (VG-30) | 656.25 | Cum | 6,100 | ₹40,03,125 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.23 MB
Tendernotice_2.pdf
PDF • 3.77 MB
Tendernotice_3.pdf
PDF • 8.63 MB
2Agreement01Jan2023_Pali_21.pdf
Tender Documents • 8.64 MB
Technical_Bali_21.pdf
Tender Documents • 0.24 MB
BOQ_1016087.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid