Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance | ₹11.6 L | L1 | Accepted-Finance Being the lowest bidder L1 |
| 2 | L2₹11.8 L+₹18,105.02 (1.55%)Accepted-Finance | ₹11.8 L+₹18,105.02 (1.55%) | L2 | Accepted-Finance being L2 |
| 3 | L3₹13.4 L+₹1.8 L (15.2%)Accepted-Finance | ₹13.4 L+₹1.8 L (15.2%) | L3 | Accepted-Finance Being L3 |
Tender Value
Refer Docs
EMD Value
₹54,000
Closing Date
8 Jun 2026, 6:00 pmClosed
DFO Doda
Forest Complex Doda
Construction of 239 Nos. of BPs in Lal Draman Forest under UT CAPEX for the year 2026-27
2026_FD_309998_1
e-NIT No. 02 of 2026-27 dated 15/05/2026
Open Tender
Civil Works
Percentage
120 days
Lal-Draman Forest
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
DFO Doda
₹54,000
20 Jun 2026
15 May 2026
10 Jun 2026
15 May 2026
8 Jun 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, Depth/ heightupto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed .All Kind of Soil | 82.49 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size | 46.96 | Cum | - | - |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 20.31 | Cum | - | - |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size | 30.46 | Cum | - | - |
| 5 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars | 1 | Kg | - | - |
| 6 | Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014( Nerolac) Exterior Emulsion paint is recommended. | 239 | Each | - | - |
| 7 | Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts | 533.09 | Sqm | - | - |
| 8 | Carriage of Material from source to site of work by M.T and HL av i.e Bajri av. Distance 6.5 Km and HL 2000 m | 74.32 | Cum | - | - |
| 9 | Carriage of material from source to site of work by M.T and HL av i.e Sand av. Distance 6.5 Km and HL 2000 m | 36.39 | Cum | - | - |
| 10 | Add for Repedite | 1 | L/S | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_1003178.xls
BOQ • 0.31 MB
corrigendumenit2new.pdf
PDF • 0.27 MB
corrigendumenit2.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .