Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.1 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹15.1 Cr+₹3.5 L (0.23%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹15.5 Cr+₹38.7 L (2.57%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹15.7 Cr+₹64.6 L (4.28%)Admitted-Finance 4TH FLOOR CHINAR COMMERCIAL COMPLEX BUND RESIDENCY ROAD SRINAGAR 190001 KASHMIR | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L4 | Admitted-Finance |
Tender Value
₹24.4 Cr
EMD Value
₹48.9 L
Closing Date
11 Nov 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
executive engineer rnb division awantipora
executive engineer rnb division awantipora
Construction of Transit Accomodation for Kashmiri Migrant Employees at Lethpora-II (Barsoo Pulwama) Allied Works.
2024_PWDJK_260261_2
62/EEA / RNB/2024-25/5225-35 DATED 15-10-2024
Open Tender
Civil Works
Percentage
730 days
lethpora barsoo awantipora pulwama
as per nit/sbd
16 documents required · 16 mandatory
₹14,000
executive engineer rnb division awantipora
₹48.9 L
Office of Chief Engineer PW(RNB) Department South
11 Dec 2024
15 Oct 2024
12 Nov 2024
16 Oct 2024
11 Nov 2024
16 Oct 2024
18 Oct 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improveworkability without impairing strength and durability as per direction of Engineer-in- charge.
5.34.2 All works above plinth level upto floor V level | 119.08 | Cum | 8,481.21 | ₹10,09,900.32 |
| 2 | Reinforcement for R.C.C work including straightening cutting, bending placing in position and binding all complete. Thermo-Mechanically Treated bars of Grade Fe-500 D or more .Including carriage of all materials involved with loading unloading and stacking complete. | 40,027.49 | Kg | 104.41 | ₹41,79,149.63 |
| 3 | Centring and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached plasters, buttresses, plinth and string courses etc. | 166.25 | sqm | 566.75 | ₹94,218.69 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs landings, balconies and acess platform. | 986.03 | sqm | 647.17 | ₹6,38,124.81 |
| 5 | Providing and laying stone dust below foundation and rooms including watering, ramming carriages complete | 174.69 | Cum | 762.71 | ₹1,33,238.16 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) including Extra for brick work in superstructure above plinth level upto floor VI level ) incl carriage of all materials ( bricks from pampore)Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 686.58 | Cum | 8,134.42 | ₹55,84,932.83 |
| 7 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : Cement mortar 1:4 ( 1 cement :4 coarse sand) including all carriages complete Extra for half Brick masonry in superstructure above plinth level upto floor V level. | 911.52 | Sqm | 997.43 | ₹9,09,179.22 |
| 8 | Providing and fixing of imported KD wood work in frames of doors, windows, celestory windows, partitions and other frames rougt framed and fixed in with position hold fast, lugs or with dash fasteners of reqd dia and length incl all carriage of materials as involved upto site of work as directed by EIC complete. | 30.48 | Cum | 46,610.17 | ₹14,20,677.95 |
| 9 | Providing and fixing (35mm thick) panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. KD wood | 478.47 | Sqm | 1,610.17 | ₹7,70,417.56 |
| 10 | Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick.9.8.11 MDF board 12 mm thick
9.8.11.1 Pre-laminated particle board with decorative lamination on both sides | 134.52 | Sqm | 1,016.95 | ₹1,36,799.98 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 8.03 MB
BOQ_778247.xls
BOQ • 1.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .