Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹269.4 CrAdmitted-Finance 3 A AGRAWAL NAGAR INDORE M P 452001 | INDORE | INDORE | MADHYA PRADESH | 452001 | L1 | Admitted-Finance | |
| 2 | L1₹269.4 CrAdmitted-Finance H NO 3121 SECTOR 28D CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | L1 | Admitted-Finance | |
| 3 | L2₹286.3 Cr+₹16.8 Cr (6.25%)Admitted-Finance | L2 | Admitted-Finance | |
| 4 | L3₹286.3 Cr+₹16.8 Cr (6.25%)Admitted-Finance DAK BUNGLOW ROAD PETCH AREA NIMBAHERA 312601 DIST CHITTORGARH RAJASTHAN | CHITTORGARH | RAJASTHAN | 312601 | L3 | Admitted-Finance | |
| 5 | L3₹286.3 Cr+₹16.8 Cr (6.25%)Admitted-Finance C 21 SUSHANT LOK 3 SECTOR 57 122001 | GURUGRAM | HARYANA | 122001 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | B R GOYAL INFRASTRUCTURE LIMITED L1 | SHREEJI INFRASTRUCTURE INDIA PVT LTD L3 | R K JAIN INFRA PROJECTS PVT. LTD. L3 | NEW INDIA CONTRACTORS AND DEVELOPERS PRIVATE LIMITED L1 | SHIWALAY INFRA PROJECTS PVT LTD L4 | CHETAK ENTERPRISES LIMITED L3 | Vallabhaneni Constructions Private Limited L3 | P and R Infraprojects Ltd L2 | R S V CONSTRUCTIONS PRIVATE LIMITED L3 | JKM Infra Projects Limited L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | “Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length- 34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC” | 1 | Lumpsum | 2,69,42,40,000 ₹2,69,42,40,000 Lowest | 2,86,26,30,000 ₹2,86,26,30,000 | 2,86,26,30,000 ₹2,86,26,30,000 | 2,69,42,40,000 ₹2,69,42,40,000 Lowest | 3,11,00,00,000 ₹3,11,00,00,000 | 2,86,26,30,000 ₹2,86,26,30,000 | 2,86,26,30,000 ₹2,86,26,30,000 | 2,86,26,00,000 ₹2,86,26,00,000 | 2,86,26,30,000 ₹2,86,26,30,000 | 3,13,20,00,000 ₹3,13,20,00,000 |
Tender Value
₹332.8 Cr
Closing Date
9 Aug 2021, 3:00 pmClosed
K C Bhatt
National Highways and Infrastructure Development Corporation Ltd. Third Floor, PTI Building, 4 Sansad Marg. New Delhi
Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length- 34.494 Km) from Design Chainage Km 75.000 to 109.494 km on NH-129A in Manipur
2021_NHIDC_634320_1
NHIDCL/Manipur/NH-129A/Maram- Paren/2021/PKG-III
Open Tender
Civil Works
EPC Contract
2555 days
Manipur
Please refer Tender documents.
4 documents required · 4 mandatory
₹47,200
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
25 Aug 2021
16 Jun 2021
10 Aug 2021
16 Jun 2021
9 Aug 2021
23 Jul 2021
16 Jun 2021 - 1 Jul 2021
6 Jul 2021
Amount
“Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length- 34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC”
B R GOYAL INFRASTRUCTURE LIMITED
P and R Infraprojects Ltd
R S V CONSTRUCTIONS PRIVATE LIMITED
Vallabhaneni Constructions Private Limited
SHREEJI INFRASTRUCTURE INDIA PVT LTD
R K JAIN INFRA PROJECTS PVT. LTD.
CHETAK ENTERPRISES LIMITED
SHIWALAY INFRA PROJECTS PVT LTD
JKM Infra Projects Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
RFP.pdf
Tender Documents • 2.70 MB
DCA.pdf
Tender Documents • 2.36 MB
BOQ_667606.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .