Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88,873Accepted-AOC FLAT NO 3 SECTOR 9 GALI NO 8 NEAR HOUSE NO 765 AMBEDKAR NAGAR GURUGRAM HARYANA 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹88,873 Quoted ₹88,873.09 | L1 | Accepted-AOC AOC |
| 2 | L2₹96,539.46Rejected-Finance 3609 31A VISHNU GARDEN RAJENDRA PARK GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹96,539.46 | L2 | Rejected-Finance Due to not a lowest bidder |
| 3 | L3₹1.0 LRejected-Finance 415 SECTOR 12 A GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹1.0 L | L3 | Rejected-Finance Due to not a lowest bidder |
| 4 | L4₹1.2 LRejected-Finance GSTIN: 06BYTPC3583Q1ZL1220 SECTOR 31 GURGAON 1220 SECTOR 31 GURGAON 122001 | GURUGRAM | HARYANA | 122001 | ₹1.2 L | L4 | Rejected-Finance Due to not a lowest bidder |
Tender Value
₹1.1 L
EMD Value
₹2,300
Closing Date
20 May 2026, 9:00 amClosed
ANIL KUMAR
DIV 5 Gurugram
Annual Maintenance of Water Supply, Sewerage and SWD Scheme in Sector29 Gurugram for the year 2025-2026. (Construction of Sewerage Manhole near Multilevel Parking in Sector29, Gurugram)
2026_HBC_521058_1
2026F2DA8C87 3A56 429B 88F1 1286ABBD136E256HSV
Open Tender
Civil Works
60 days
Gurugram
2 documents required · 2 mandatory
₹250
₹2,300
Yes
2 Jun 2026
12 May 2026
20 May 2026
12 May 2026
20 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) | 28.11 | Sqm | 147 | ₹4,132.17 |
| 2 | [21.93.3]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 3. Type:- Extra Heavy Duty Set (EHD-10) 560MM Clear Opening | 4 | Each | 772 | ₹3,088 |
| 3 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 65.64 | cum | 83 | ₹5,448.12 |
| 4 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 3.61 | cum | 3,476 | ₹12,548.36 |
| 5 | [6.1.3]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 3. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) | 2.35 | cum | 3,426 | ₹8,051.1 |
| 6 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 1.84 | cum | 6,113 | ₹11,247.92 |
| 7 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars | 2 | Kg. | 68 | ₹136 |
| 8 | [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) | 17.37 | cum | 3,968 | ₹68,924.16 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_599964.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid