| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-Finance | ₹11.0 L | L1 | Accepted-Finance L1,L2,L3,L4,L5 |
| 2 | L2₹11.5 L+₹44,607.46 (4.05%)Rejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹11.5 L+₹44,607.46 (4.05%) | L2 | Rejected-Finance L1,L2,L3,L4,L5 |
| 3 | L3₹12.4 L+₹1.4 L (12.4%)Rejected-Finance HIMACHAL PRADESH HP | ₹12.4 L+₹1.4 L (12.4%) | L3 | Rejected-Finance L1,L2,L3,L4,L5 |
| 4 | L4₹13.0 L+₹2.0 L (17.9%)Rejected-Finance R O VILLAGE SAMLARA POST OFFICE JASSANA TEHSIL BANGANA DISTRICT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹13.0 L+₹2.0 L (17.9%) | L4 | Rejected-Finance L1,L2,L3,L4,L5 |
| 5 | L5₹13.0 L+₹2.0 L (18.1%)Rejected-Finance | ₹13.0 L+₹2.0 L (18.1%) | L5 | Rejected-Finance L1,L2,L3,L4,L5 |
Tender Value
₹12.4 L
EMD Value
₹24,800
Closing Date
9 Aug 2026, 4:00 pmClosed
E.E. Bangana
Bangana Division HPPWD Bangana
SH- C/o Protection wall from Rd 21/350 to 21/380) Under O.F.C Head
2026_PWD_140415_1
3776-3805 dated 29.07.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Bangana
Please refer Tender documents.
13 documents required · 13 mandatory
₹500
₹24,800
26 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
9 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts and drains etc. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock, chiselling/wedging out rocks( where blasting is prohibited ) as per drawings and M.O.R.D 2014 technical specification clause 305 and as per direction of the Engineer-in-charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads and lifts including dressing of sides, bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty milimeters) compacted thickness including shoring and strutting and pumping and bailing out water ( surface and sub soil water ) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in-charge including carriage of material within all leads and lifts and other incidentals. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. | - | Per cubic metre | 300 | - |
| 2 | Providing and laying cement concrete 1:5:10(one cement :five sand: ten graded stone aggregate 40mm(forty millimeter)nominal size and curing complete including cost of form work with MS plates plain concrete on ground or under water and curing complete including pumping bailing out water dewatering removal of slush or required at site which may arise at the time of laying under water complete for all heights and depths in retaining wall /breast wall as per drawing and HP.PWD., technical specification direction of Engineer-in-charge including carriage of materials within all leads and lifts . The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. | 1 | Per Cubic metre | 3,626 | ₹3,622.37 |
| 3 | Providing weepholes in brick masonry/ stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimeters) dia PVC pipe of make D-PLAST/POLY.having working pressure of 4.0 kg (four kilogramme) per square centimeter extending through the full width of the structures with slope of 1(V):20(H) (one vertical : twenty horizontal) towards drawing face complete as per drawing and MORD 2014 technical specification clauses 614, 709, 1204.3.7 as per direction of Engineer-in-charge including carriage of materials with in all leads and lifts including other incidentals. The rate including octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. | - | Each | 246 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_208279.xls
BOQ • 0.28 MB
2.pdf
Tender Documents • 4.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .