Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance AT SHRIKORUAN P O URALI CUTTACK | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance AR NUAGARH PO TELENGAPENTHA DIST CUTTACK | CUTTACK | ODISHA | 752120 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.9 L
EMD Value
₹13,000
Closing Date
5 Feb 2026, 5:00 pmClosed
Executive Engineer, CD-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Repair and Renovation of Biju Pattnayak Kalyani Mandap at Gopalpur in Ward no-57.
2026_ORULB_124261_10
CMC)CTC_Div-IIINo.34/25-26
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹13,000
Yes
2 Apr 2026
22 Jan 2026
9 Feb 2026
22 Jan 2026
5 Feb 2026
22 Jan 2026
Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead etc. all complete as directed by the Engineer-in-charge.
Dismantling and removing 2.5 cm.thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead
Dismantling brick or stone masonry in lime or cement mortar above 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead
Dismantling and removing R.C.C.columns beams, Roof slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead
Earthwork in all kinds of soil in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulders requiring blasting with all leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge.
Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost,conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per the direction of the Engineer-in-charge.
Providing & laying cement concrete of prop. (1:3:6) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 150 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge.
Supplying all labour,materials & T&P for Brick masonary with Fly Ash bricks in Foundation & Plinth having C.S not less than 35 kg/Cm2 in Cement Mortar (1:6) including watering and curing etc complete as per direction of Engineer-in-charge.
Supplying all labour, materials, T&P for Reinforcement Cement Concrete M-20 for reinforced cement concrete works in using 12mm to 20 mm size hard granite Crusher Broken chips including cost of materials,royalty & conveyance charges with watering,curing all complete as per direction of Engineer-in-charge. A. Column Base
Plinth Band
Column & Wall Beam
Lintel
Chajja
Roof Slab
Column & Wall Beam(1st Floor)
Lintel (1st Floor)
Chajja (1st Floor)
Roof Slab (1st Floor)
Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). A. Ground Floor
1st Floor
First class Fly Ash brick work in cement mortar (1:6) in Super Structure with best quality bricks having crushing strength from 75kg/cm2 to 99kg/cm2, immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes moulding, chamfering, corbelling etc. complete as per drawing, design and specification, watering and curing for 7 days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer-in-charge.
First class Fly Ash brick work in cement mortar (1:6) in 1st Floor Super Structure with best quality bricks having crushing strength from 75kg/cm2 to 99kg/cm2, immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes moulding, chamfering, corbelling etc. complete as per drawing, design and specification, watering and curing for 7 days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer-in-charge
2.5cm. thick grading concrete (1:2:2) on roof slab with 6mm. Size on new work crusher broken Granite chips including cost of all labour, materials with all taxes, lead, T&P etc all complete.
Supplying fitting, fixing fully glazed aluminum framed openable windows using 15 micron anodized aluminum section 2082 as out section, 9139 as mullion section, 4124 as a shutter section frame with tapered clip of section 4125, aluminum angle , rubber beading, friction stay and handle etc. excluding cost of black glass.
Supply fitting and fixing Glass & Nova Pan Board as per specification etc. A. Prelaminated particle board (Novapan standard type) 12mm thick
Black glass (ISI)8mm thick
Providing fitting, fixing of Al. door with anodized Al. door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member with frame section as 9221 with tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1855 including all cost of labour, T&P, hire charges of drilling machine, labour charges etc. complete excluding cost of laminated board.
6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment including watering curring etc.
6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment including watering curring etc.
12mm. thick cement plaster (1:6) on brick work including watering curring etc.
12mm. thick cement plaster (1:6) on brick work including watering curring etc. (Inside 1st Floor)
16mm. thick cement plaster (1:6) on brick work including watering curring etc.
16mm. thick cement plaster (1:6) on brick work (Inside 1st Floor)
Supplying fitting and fixing M,S. Grill as per specification etc.
Supplying all materials, labour, T&P for laying P.C.C(1:2:4) using 12mm size c.b.h.g chips including well curing cost of conveyance & royality taxes etc all complete as per specification and direction of the Engineer-In-Charge
Fixing Tiles in floors or steps & landing on 25mm. thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles all complete with
Fixing Tiles in floors or steps & landing on 25mm. thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles all complete with
Fixing Tiles to dados skirting & risers on 12mm. thick C.P (1:3) jointed with neat cement slurry without cost of precast tiles.
Fixing Tiles to dados skirting & risers on 12mm. thick C.P (1:3) jointed with neat cement slurry without cost of precast tiles.
Cement washing two coats Ground Floor
Cement washing two coats (Inside 1st Floor)
Priming one coat with any approved primer including cost of all labour, materials T & P with taxes, transportation etc all complete.
Priming one coat with any approved primer including cost of all labour, materials T & P with taxes, transportation etc all complete.
Distempering two coats to walls with distemper of approved shade on old work to give an even shade in Ground Floor. including cost of all labour, materials T & P with taxes, transportation etc all complete.
Distempering two coats to walls with distemper of approved shade on old work to give an even shade in 1st Floor. including cost of all labour, materials T & P with taxes, transportation etc all complete.
Wall painting 2 coats with Weather Coat of approved shade on new work to give an even shade in Ground Floor.(Out side)
Wall painting 2 coats with Weather Coat of approved shade on new work to give an even shade in First Floor.(Out side)
Enamel Painting two coats with any approved paint including cost of all labour, materials T & P with taxes, transportation etc all complete in Ground Floor.
Enamel Painting two coats with any approved paint including cost of all labour, materials T & P with taxes, transportation etc all complete in 1st Floor.
Remove excavated materials from site by Mechanical means with loading and unloading the same within 5km away from site.
stage.html
html • 0.03 MB
finance_577169.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 2.69 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_577169.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .