Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAdmitted-Fee/PreQual/Technical/Finance VILLAGE DEVGAI POST KUDARI DISTT SHAHDOL MP | SHAHDOL | MADHYA PRADESH | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹13.4 L+₹13,175.62 (0.99%)Admitted-Fee/PreQual/Technical/Finance AMLAI COLLIERY DIST ANUPPUR MP 484116 | AMLAI COLLIERY | ANUPPUR | MADHYA PRADESH | 484116 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹14.8 L+₹1.6 L (11.7%)Admitted-Fee/PreQual/Technical/Finance CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | ANUPPUR | ANUPPUR | MADHYA PRADESH | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹16.1 L+₹2.8 L (21.2%)Admitted-Fee/PreQual/Technical/Finance WARD NO 01 AMARKANTAK ROAD NEAR BAGHEL PETROL PUMP DHNAPURI DHNAPURI SHAHDOL MADHYA PRADESH 484114 | SHAHDOL | MADHYA PRADESH | 484114 | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | NAGENDRA KUMAR SINGH L4 | Ram Awadh Singh L3 | AMIT KUMAR JAISWAL L1 | MAHENDRA SINGH L2 |
|---|---|---|---|---|---|---|---|
| 1.00PARTICULAR | |||||||
| 1.01 | Cleaning/Removal of debris/stone from galleries and stacking within 50 m distance.
Calculation: 5 × 15.00 m × 4.20 m × 0.30 m = 94.50 m³ | 94.5 | m³ | 41,202 ₹48,618.36 | 37,989 ₹44,827.02 | 33,267.78 ₹39,255.98 | 31,185 ₹36,798.3 Lowest |
| 1.02 | Groove cutting in stone for foundation, manhole/duggi hole/pits and excavated material to be removed and stacked separately within 50 m distance, for haulage plate, switch, return pulley and holding bolt.
Haulage plate: 5 × 8 × (0.60 m × 0.60 m × 0.80 m) = 11.52 m³
Switches: 5 × (2.00 m × 1.00 m × 0.20 m) = 2.00 m³
Return pulley: 5 × (0.60 m × 0.60 m × 1.00 m) = 1.80 m³
Holding bolts: 5 × 18 × (0.45 m × 0.45 m × 0.60 m) = 10.94 m³
Total = 26.26 m³ | 26.26 | m³ | 1,15,701.56 ₹1,36,527.84 | 1,06,773.16 ₹1,25,992.33 | 93,437.28 ₹1,10,255.99 Lowest | 94,536 ₹1,11,552.48 |
| 1.03 | Transportation and installation of endless haulage with all accessories (such as base, drum, motor, gear box, starter, resistance, controller, etc.) and anchoring tension pulley, including loading, transporting through haulages/pushing manually from surface to underground up to site and assembling the same as per instructions of the Executive-in-Charge (excluding foundation/grouting work, etc.). | 3 | Set | 2,07,972 ₹2,45,406.96 | 1,91,973 ₹2,26,528.14 | 1,67,978.31 ₹1,98,214.41 Lowest | 1,73,100 ₹2,04,258 |
| 1.04 | Dismantling, transportation and installation of endless haulage with all accessories (such as base, drum, motor, gear box, starter, resistance, controller, rope, etc.) and anchoring tension pulley, including loading, transporting through haulages/pushing manually from old site to proposed site underground and assembling the same as per instructions of the Executive-in-Charge (excluding foundation/grouting work, etc.). | 2 | Set | 1,73,436 ₹2,04,654.48 | 1,60,094 ₹1,88,910.92 | 1,40,083.02 ₹1,65,297.96 | 99,800 ₹1,17,764 Lowest |
| 1.05 | Installation of return pulley of haulage underground with frame, tension arrangement and safety guard fencing, including loading on trolley, transporting through haulages/pushing manually from surface to underground or from one section to another section underground, and placing the same. | 5 | No. | 74,010 ₹87,331.8 | 68,315 ₹80,611.7 | 59,777.1 ₹70,536.98 Lowest | 61,500 ₹72,570 |
| 1.06 | Transportation of haulage rope from surface to underground through haulages with tramming and pushing, coupling/uncoupling, etc., for every 1.0 km or part thereof, including loading, unloading and stacking at destination; OR transportation of dismantled haulage rope underground from one section to another section or from underground to surface through haulages with tramming and pushing, coupling/uncoupling, etc., for every 1.0 km or part thereof, including loading, unloading and stacking at destination. | 6,860 | m | 2,53,820 ₹2,99,507.6 | 2,33,240 ₹2,75,223.2 | 2,05,800 ₹2,42,844 Lowest | 2,26,380 ₹2,67,128.4 |
| 1.07 | Laying of haulage rope along track line, including carrying, laying and jointing/splicing of rope, with a lead of 100 m. | 6,860 | m | 2,98,410 ₹3,52,123.8 | 2,74,400 ₹3,23,792 | 2,46,960 ₹2,91,412.8 Lowest | 2,53,820 ₹2,99,507.6 |
| 1.08 | Cement concrete/PCC (1:2:4) in foundation/plinth/flooring/wall (any thickness) underground (excluding centring, shuttering and cost of CC materials).
Haulage plate: 5 × 8 × (0.60 m × 0.60 m × 0.80 m) = 11.52 m³
Switches: 5 × (2.00 m × 1.00 m × 0.20 m) = 2.00 m³
Return pulley: 5 × (0.60 m × 0.60 m × 1.00 m) = 1.80 m³
Holding bolts: 5 × 18 × (0.45 m × 0.45 m × 0.60 m) = 10.94 m³
Total = 26.26 m³ | 26.26 | m³ | 84,163.3 ₹99,312.69 | 77,677.08 ₹91,658.95 | 67,975.85 ₹80,211.5 Lowest | 78,780 ₹92,960.4 |
| 1.09 | Loading of all kinds of building materials into tubs at incline/pit mouth on surface, with a lead of 50 m —
Cement. | 167 | Bag | 1,294.25 ₹1,527.22 | 1,169 ₹1,379.42 | 1,045.42 ₹1,233.6 Lowest | 1,336 ₹1,576.48 |
Tender Value
₹20.6 L
EMD Value
₹25,900
Closing Date
31 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Installation of 05 Nos. Endless haulage, Return pulley and Laying of haulage rope of Burhar VI Bottom Seam and V Seam.
2026_SECL_367415_1
SECL/SGP/SO(M)/2026-27/NIT-739 dated 19-10-2026
Open Tender
Civil Works - Roads
Item Rate
365 days
DAMNI UG MINE
as per NIT
7 documents required · 7 mandatory
₹25,900
2 Nov 2026
19 Oct 2026
2 Nov 2026
19 Oct 2026
31 Oct 2026
20 Oct 2026
19 Oct 2026 - 27 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PARTICULAR | |||||
| 1.01 | Cleaning/Removal of debris/stone from galleries and stacking within 50 m distance.
Calculation: 5 × 15.00 m × 4.20 m × 0.30 m = 94.50 m³ | 94.5 | m³ | 558.8 | ₹52,806.6 |
| 1.02 | Groove cutting in stone for foundation, manhole/duggi hole/pits and excavated material to be removed and stacked separately within 50 m distance, for haulage plate, switch, return pulley and holding bolt.
Haulage plate: 5 × 8 × (0.60 m × 0.60 m × 0.80 m) = 11.52 m³
Switches: 5 × (2.00 m × 1.00 m × 0.20 m) = 2.00 m³
Return pulley: 5 × (0.60 m × 0.60 m × 1.00 m) = 1.80 m³
Holding bolts: 5 × 18 × (0.45 m × 0.45 m × 0.60 m) = 10.94 m³
Total = 26.26 m³ | 26.26 | m³ | 5,647.88 | ₹1,48,313.33 |
| 1.03 | Transportation and installation of endless haulage with all accessories (such as base, drum, motor, gear box, starter, resistance, controller, etc.) and anchoring tension pulley, including loading, transporting through haulages/pushing manually from surface to underground up to site and assembling the same as per instructions of the Executive-in-Charge (excluding foundation/grouting work, etc.). | 3 | Set | 88,877.36 | ₹2,66,632.08 |
| 1.04 | Dismantling, transportation and installation of endless haulage with all accessories (such as base, drum, motor, gear box, starter, resistance, controller, rope, etc.) and anchoring tension pulley, including loading, transporting through haulages/pushing manually from old site to proposed site underground and assembling the same as per instructions of the Executive-in-Charge (excluding foundation/grouting work, etc.). | 2 | Set | 1,11,177 | ₹2,22,354 |
| 1.05 | Installation of return pulley of haulage underground with frame, tension arrangement and safety guard fencing, including loading on trolley, transporting through haulages/pushing manually from surface to underground or from one section to another section underground, and placing the same. | 5 | No. | 18,976.86 | ₹94,884.3 |
| 1.06 | Transportation of haulage rope from surface to underground through haulages with tramming and pushing, coupling/uncoupling, etc., for every 1.0 km or part thereof, including loading, unloading and stacking at destination; OR transportation of dismantled haulage rope underground from one section to another section or from underground to surface through haulages with tramming and pushing, coupling/uncoupling, etc., for every 1.0 km or part thereof, including loading, unloading and stacking at destination. | 6,860 | m | 47.45 | ₹3,25,507 |
| 1.07 | Laying of haulage rope along track line, including carrying, laying and jointing/splicing of rope, with a lead of 100 m. | 6,860 | m | 55.75 | ₹3,82,445 |
| 1.08 | Cement concrete/PCC (1:2:4) in foundation/plinth/flooring/wall (any thickness) underground (excluding centring, shuttering and cost of CC materials).
Haulage plate: 5 × 8 × (0.60 m × 0.60 m × 0.80 m) = 11.52 m³
Switches: 5 × (2.00 m × 1.00 m × 0.20 m) = 2.00 m³
Return pulley: 5 × (0.60 m × 0.60 m × 1.00 m) = 1.80 m³
Holding bolts: 5 × 18 × (0.45 m × 0.45 m × 0.60 m) = 10.94 m³
Total = 26.26 m³ | 26.26 | m³ | 4,108.85 | ₹1,07,898.4 |
| 1.09 | Loading of all kinds of building materials into tubs at incline/pit mouth on surface, with a lead of 50 m —
Cement. | 167 | Bag | 9.95 | ₹1,661.65 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 1.67 MB
BOQ_380354.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .