| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | -39.00% | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 CrAdmitted-Finance AT CHHANAGIRI PO CHHANAGIRI PS KHORDHA DIST KHORDHA PIN 752020 | CHHANAGIRI | KHORDHA | ODISHA | 752020 | -35.05% | ₹1.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.8 CrAdmitted-Finance | -34.44% | ₹1.8 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.9 CrAdmitted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | -32.00% | ₹1.9 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.9 CrAdmitted-Finance HOUSE NO 4433 BADAGADA BRIT COLONY BHUBANESWAR ODISHA 751018 | BHUBANESWAR | KHORDHA | ODISHA | 751018 | -31.95% | ₹1.9 Cr | L5 | Admitted-Finance |
Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
3 Jun 2026, 5:00 pmClosed
CHIEFCONSTRUCTIONENGINEERCENTRALRANDBCIRCLEBBSR
OFFICE OF THE CHIEF CONSTRUCTION ENGINEER, CENTRAL RANDB CIRCLE, BHUBANESWAR
Structural Strengthening of Existing Boundary wall inside Nandankan Zoological Park Bhubaneswar (Roads)
2026_EICCL_129563_1
TCN NO.01 OF 2026-27
Open Tender
Civil Works - Roads
90 days
Khordha
2 documents required · 2 mandatory
₹10,000
₹2.8 L
Yes
9 Jun 2026
20 May 2026
3 Jun 2026
20 May 2026
3 Jun 2026
20 May 2026
20 May 2026 - 3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches, column foundation, pit, etc in all kind of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge.
Upto 1.5mtr Depth | 1,764.47 | cum | 304.9 | ₹5,37,986.9 |
| 2 | Beyond 1.5mtr to 3.00 mtr Depth | 779.41 | cum | 326.9 | ₹2,54,789.13 |
| 3 | Filling the Foundation and Plinth, sides of foundation, etc. with excavated materials (excluding rock), in layers not exceeding 0.225 m in depth including cost of watering, ramming, dressing and levelling the top to proper level & gradient, cost of labour, conveyance, loading, unloading, T&P, etc, all complete as per the direction of Engineer-in-Charge. | 1,695.95 | cum | 169.4 | ₹2,87,293.93 |
| 4 | Disposal of surplus/ excavated materials by mechanical means within 5km. Lead away from the site including cost of all labour , T&P complete as per the direction of the Engineer-in-charge. | 1,559.26 | cum | 278.8 | ₹4,34,721.69 |
| 5 | Supplying and Filling with Sand in Foundation and Plinth in layers not exceeding 20 cm in depth, well watered and compact , top surface dressed and levelled to proper level and gradient including cost of all materials , conveyance,taxes, royalties, loading, unloading, cost of all labour, T&P, etc.All compelete as per the dirrection of Engineer-in-charge. | 142.61 | cum | 511.3 | ₹72,916.49 |
| 6 | Providing and lying Plain Cement Concrete of proportion (1:3:6) in foundation & floor using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge.
Beyond 1.5 M to 4.5M Depth | 111.33 | cum | 6,474.2 | ₹7,20,772.69 |
| 7 | Ground Floor | 31.28 | cum | 6,142.6 | ₹1,92,140.53 |
| 8 | Providing, lifting, hoisting and laying in position Machine Batched , Machine Mixed and Machine Vibrated Design mix Cement Concrete of M-30 Including the cost of Centering and Shuttering (minimum cement content not less than 407Kg/Cum) grade in reinforced cement concrete structural elements using black hard crusher broken granite chips of approved quality from approved quarry including mixing and compacting to proper shape and size, level and plumbs and finishing the exposed surfaces smooth including the cost of all materials, cost of labour, conveyance, loading, unloading, royalties, watering and curing for the required period, T&P , hire & running charges of concrete mixer and vibrator, cost of Admixtures in recommended proportions ( as per IS 9103 ) to accelerate, retard setting of concrete, improve workability without impairing strength and durability etc. complete as per the direction of the Engineer-in-charge but excluding the cost of steel reinforcement.R.C.C. foundation and footing bases of columns mass concrete pre-cast slab etc.
Beyond 1.5 M to 4.5M Depth | 359.28 | cum | 7,139.9 | ₹25,65,223.27 |
| 9 | R.C.C. Plinth Beam
Ground Floor | 78.25 | cum | 7,869.3 | ₹6,15,772.73 |
| 10 | R.C.C. Beams, columns, grider and bressmer etc.
Ground Floor | 383.91 | cum | 16,261.8 | ₹62,43,067.64 |
stage.html
html • 0.10 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.48 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_592034.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid