Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC 231 NAGPUR ROAD JANTA TIMBER STORE MADAN MAHAL JABALPUR | JABALPUR | JABALPUR | MADHYA PRADESH | ₹1.2 L | 1 | Accepted-AOC L-1 |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical 0 MELROSE BYPASS NETAJI COLONY ALIGARH ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RITIK SAINI L1 |
|---|---|---|---|---|
| 1.00 | Operation and maintenance of swimming pool by engaging skilled staff in three shifts . In the scope of this item the operation of starter, motor-pump for running of pressure filter for cleaning of pool water to make it suitable for swimming. The mixing of chemicals for filtration of water as per the advice given by the chemist of company (the chemicals will be provided by the Jyoti club management). The cleaning of inside of pool by mechanical means i.e. suction sweeper (suction sweeper with itsbrushes will be provided by the Jyoti Club management). In the operation and maintenance of swimming pool the work like changing of gland rope,defective washers of taps and work of oiling, greasing of pump- motor are also included. The complete protection of all the fixtures provided in the swimming pool along with round the clock watch and ward will be ensured by the shift duty staff complete all as per the instructions of engineer in charge. 3 Monthsx30 days=90 Days. | 90 | Day | 1,050 ₹94,500 |
| 2.00 | Cleaning of ladies and gentst oilet- bathroom Units with cold acid,detergent powder including toilet seat,urinal pot, cleaning of tiles up to full height, clearing of choke of traps and sewer lines etc. complete all as per the instruction of engineer in charge. 02 Unitx26 Days in a monthsx03 Months= 156 Units. | 156 | Each | 145 ₹22,620 |
| 3.00 | Sweeping and cleaning of open area surrounding of pool, manager’s room, open verandah, entrance foyer and the path, disposal of garbage to the designated place complete all as per the instruction of engineer in charge.Open area
details:- Path(42x2.7)=113.4M2+, Front 6.3x(3.45+7.1)/2=33.23
M2,+(4.5x6)=27M2+(4.6x7.1)=32.66 M2, Front of toilet (9.5x3.5)=33.25M2+Area surrounding pool 200M2+Area of lawn & others 60 M2=499.54M2 Say 500 M2 500M2x26 days x03 Months=39000.00 M2 | 39,000 | Square Meter | 1 ₹39,000 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
12 Mar 2026, 3:00 pmClosed
Dharmendra Kumar Verma
EE (Civil) Dn.I MPPMCL Rampur Jabalpur.
Operation and maintenance of swimming pool at Rampur MPPMCL Jabalpur in the year 2026
2026_MPPMC_486209_1
Enq. No. 28
Open Tender
Miscellaneous Works
120 days
Rampur Jabalpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,000
28 Apr 2026
27 Feb 2026
13 Mar 2026
27 Feb 2026
12 Mar 2026
28 Feb 2026
Operation and maintenance of swimming pool by engaging skilled staff in three shifts . In the scope of this item the operation of starter, motor-pump for running of pressure filter for cleaning of pool water to make it suitable for swimming. The mixing of chemicals for filtration of water as per the advice given by the chemist of company (the chemicals will be provided by the Jyoti club management). The cleaning of inside of pool by mechanical means i.e. suction sweeper (suction sweeper with itsbrushes will be provided by the Jyoti Club management). In the operation and maintenance of swimming pool the work like changing of gland rope,defective washers of taps and work of oiling, greasing of pump- motor are also included. The complete protection of all the fixtures provided in the swimming pool along with round the clock watch and ward will be ensured by the shift duty staff complete all as per the instructions of engineer in charge. 3 Monthsx30 days=90 Days.
Cleaning of ladies and gentst oilet- bathroom Units with cold acid,detergent powder including toilet seat,urinal pot, cleaning of tiles up to full height, clearing of choke of traps and sewer lines etc. complete all as per the instruction of engineer in charge. 02 Unitx26 Days in a monthsx03 Months= 156 Units.
Sweeping and cleaning of open area surrounding of pool, manager’s room, open verandah, entrance foyer and the path, disposal of garbage to the designated place complete all as per the instruction of engineer in charge.Open area details:- Path(42x2.7)=113.4M2+, Front 6.3x(3.45+7.1)/2=33.23 M2,+(4.5x6)=27M2+(4.6x7.1)=32.66 M2, Front of toilet (9.5x3.5)=33.25M2+Area surrounding pool 200M2+Area of lawn & others 60 M2=499.54M2 Say 500 M2 500M2x26 days x03 Months=39000.00 M2
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_571861.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid