| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC Accepted by BEC |
| 2 | L2₹1.0 Cr+₹1.0 L (1.00%)Rejected-Finance VILL BAR GIRAIRPAR P O BARKANDA DIST DHUBRI ASSAM | DHUBRI | ASSAM | 783301 | ₹1.0 Cr+₹1.0 L (1.00%) | L2 | Rejected-Finance Rejected by BEC |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Aditya Kumar Ghosh L1 | OMAR FARUQUE L2 |
|---|---|---|---|---|---|
| 1.00 | 1) Sonamoyee Pt-I (Kalimandir) Village Road :
Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. | 1,471.27 | Sqm | 1.98 ₹2,913.12 Lowest | 2 ₹2,942.25 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (ii) From Private Land | 8.5 | Cum | 258.21 ₹2,195.62 Lowest | 260.79 ₹2,217.58 |
| 3.00 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (ii) From Private Land | 1,566.08 | Cum | 339.68 ₹5,31,966.05 Lowest | 343.08 ₹5,37,285.71 |
| 4.00 | Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 | 450 | Cum | 2,628.95 ₹11,83,027.5 Lowest | 2,655.24 ₹11,94,857.77 |
| 5.00 | 2) Dhanpur to Beltari (Ch. 0.00 m to Ch. 500.00 m) :
Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. | 1,875 | Sqm | 8.27 ₹15,506.25 Lowest | 8.35 ₹15,661.31 |
| 6.00 | Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 | 281.25 | Cum | 2,628.95 ₹7,39,392.19 Lowest | 2,655.24 ₹7,46,786.11 |
| 7.00 | Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 | 750.47 | sq.m. | 83.28 ₹62,499.22 Lowest | 84.11 ₹63,124.21 |
| 8.00 | 3) 9th km of BS Road to Khudnamari Pt-I Village Road :
Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. | 2,137.5 | Sqm | 8.27 ₹17,677.12 Lowest | 8.35 ₹17,853.9 |
| 9.00 | Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 | 320.63 | Cum | 2,628.95 ₹8,42,920.24 Lowest | 2,655.24 ₹8,51,349.44 |
| 10.00 | Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 | 854.95 | sq.m. | 83.28 ₹71,199.96 Lowest | 84.11 ₹71,911.96 |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
12 Aug 2025, 2:00 pmClosed
Chief Engineer,PWD(Roads),Assam,Chandmari,Guwahati
O/o the Chief Engineer,PWD(Roads),Assam,Chandmari,Guwahati-03
MAINT/SOPD-G/2025-26/25_mprovement of road from 1_Sonamayee Pt_I _Kalimandir) Village Road_Ch. 0.00 m to Ch. 800.00 m_ under Gravel wearing Course_GWC_ 2_Improvement of Road from Dhanpur to Beltari (Ch. 0.00 m to Ch. 500.00 m) under Gravel wearing Co
2025_PWD_45827_15
CE/MAINT/SOPDG/01/2025-26/02
Open Tender
Civil Works – Roads
Item Rate
180 days
Dhubri
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,100
₹2.1 L
Yes
O/o the Chief Engineer,PWD(Roads),Assam,Chandmari,
2 Jan 2026
22 Jul 2025
14 Aug 2025
22 Jul 2025
12 Aug 2025
22 Jul 2025
22 Jul 2025 - 12 Aug 2025
24 Jul 2025
Amount
1) Sonamoyee Pt-I (Kalimandir) Village Road : Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (ii) From Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (ii) From Private Land
Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
2) Dhanpur to Beltari (Ch. 0.00 m to Ch. 500.00 m) : Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
3) 9th km of BS Road to Khudnamari Pt-I Village Road : Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
4. Odlatari to Monipur village Road : Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (ii) From Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (ii) From Private Land
Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
5 ) NH-117C to Bakuabhangi Village Road : Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (ii) From Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (ii) From Private Land
Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
6) Suripara Pt-I to Suripara Pt-II Village Road : Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (ii) From Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (ii) From Private Land
Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
7) Saltari Village Road : Heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (ii) From Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (ii) From Private Land
Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
OMAR FARUQUE (BID ID -276062)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .