| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance AT PO PHUSRO DIST BOKARO JHARKHAND 829104 | BOKARO | JHARKHAND | 829104 | L1 | Admitted-Finance | |
| 2 | L2₹3.0 L+₹3,810 (1.27%)Admitted-Finance 268 KARGALI BAZAR BERMO BOKARO 829104 JHARKHAND | BOKARO | JHARKHAND | 829104 | L2 | Admitted-Finance | |
| 3 | L3₹3.1 L+₹9,010 (3.01%)Admitted-Finance 71 BALU BANKER COLONY P O DHORI 825102 JHARKHAND | BOKARO | JHARKHAND | 825102 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S MITHI ENTERPRISES L1 | M/S NATIONAL ELECTRICAL WORKS L3 | M/s Kiran Electrical works L2 |
|---|---|---|---|---|---|---|
| 1.01 | Cost of copper strip/wire for winding 315 KVA (Estimate weight two limb 200 Kg., less 60% scrap value = 120 Kg., Net Weight 80 Kg.) | 80 | Kg | 900 ₹72,000 Lowest | 925 ₹74,000 | 900 ₹72,000 Lowest |
| 1.02 | Insulating material @ 15% of the Cu cost (i.e. 0.15 X 200 Kg. X 900/Kg. | 1 | job | 27,000 ₹27,000 Lowest | 27,250 ₹27,250 | 27,000 ₹27,000 Lowest |
| 1.03 | Labour cost @ 15% of the Cu cost (i.e. 0.15 X 200 Kg. X 900/Kg. | 1 | job | 27,000 ₹27,000 Lowest | 27,250 ₹27,250 | 27,000 ₹27,000 Lowest |
| 1.04 | Filtration of transformer oil | 500 | liter | 15 ₹7,500 Lowest | 15 ₹7,500 Lowest | 15 ₹7,500 Lowest |
| 1.05 | Complete double coat painting with primer and finished paint of transformer | 1 | job | 4,000 ₹4,000 Lowest | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 1.06 | Replacement of drain valve | 1 | nos | 2,500 ₹2,500 Lowest | 2,500 ₹2,500 Lowest | 2,500 ₹2,500 Lowest |
| 1.07 | Supply and fitting of LT side brass stud as per required shape and size | 2 | nos | 5,000 ₹10,000 Lowest | 5,000 ₹10,000 Lowest | 5,000 ₹10,000 Lowest |
| 1.08 | Supply and providing of corcksheet/gas kit new changing | 1 | set | 11,000 ₹11,000 Lowest | 12,500 ₹12,500 | 12,500 ₹12,500 |
| 1.09 | Supply and providing of LT side brass stud as per required shape and size | 3 | nos | 5,000 ₹15,000 Lowest | 5,000 ₹15,000 Lowest | 5,000 ₹15,000 Lowest |
| 1.10 | Supply and providing of HT insulator as per required shape and sample | 3 | nos | 4,500 ₹13,500 Lowest | 4,500 ₹13,500 Lowest | 4,500 ₹13,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
29 Sept 2025, 9:00 amClosed
PE ENM
PE ENM, AKKOCP
Repairing/Maintenance and part rewinding of 1 no 315 KVA, 11Kv/440V transformer, Make GEC and repairing maintenance of 100 KVA 3.3KV /440V transformer and its installation on fabricated structure in mines in respect of AKKOCP, BnK Area
2025_CCL_344297_2
PE(EnM)/AKK OCP/e-tender/25-26/28
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
AKKOCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,500
14 Oct 2025
18 Sept 2025
30 Sept 2025
19 Sept 2025
29 Sept 2025
19 Sept 2025
19 Sept 2025 - 29 Sept 2025
Amount
Cost of copper strip/wire for winding 315 KVA (Estimate weight two limb 200 Kg., less 60% scrap value = 120 Kg., Net Weight 80 Kg.)
Insulating material @ 15% of the Cu cost (i.e. 0.15 X 200 Kg. X 900/Kg.
Labour cost @ 15% of the Cu cost (i.e. 0.15 X 200 Kg. X 900/Kg.
Filtration of transformer oil
Complete double coat painting with primer and finished paint of transformer
Replacement of drain valve
Supply and fitting of LT side brass stud as per required shape and size
Supply and providing of corcksheet/gas kit new changing
Supply and providing of LT side brass stud as per required shape and size
Supply and providing of HT insulator as per required shape and sample
Supply and providing of HT side brass stud as per required shape and size
Supply and providing of corcksheet/gas kit new changing
Complete transformer opening and fitting and testing at site
Erection of metallic pole in cement concrete 1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 40 mm nominal size ) foundation including excavation refilling etc as required foundation including excavation and refilling etc. as required.(4.5 meter and above)
Erection of metallic pole in cement concrete 1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 40 mm nominal size ) foundation including excavation refilling etc as required foundation including excavation and refilling etc. as required.( 8 to 11 meter)
Supply and erection of channel iron 75mm x40 mm x6mm(7.14kg/mtr) cross arm for 3 wire 11KV OH line complete with clamp bolts and for clamping to the pole 50mm x6mm MS flats welded on one side to the channel iron and with bolts and nuts on other side for tying the cross arm together ,including drilling of holes for insulator ,pins(as per drawing) and painting with primer and finish paint as required.
Supply and erection of stay set complete(galvanized) with 19/20 mm dia x 1.8 mtr long stay rod anchor plate of size 45cm x45cm x7.5 mm thimble stay clamps ,bow tightner7/3.15 stay wire and strain insulator etc in cement concrete1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 40 mm nominal size ) foundation including excavation ,refilling etc as required
cutting work for fabrication of structure
double layer welding work for fabrication of structure
supply and erection of post insulator for for making Horn gap fuse system
Total impact of GST for the purpose of CTC
M/s Kiran Electrical works (BID ID -1187817)
M/S NATIONAL ELECTRICAL WORKS (BID ID -1187816)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .