Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 CrAccepted-AOC | L1 | Accepted-AOC Based on the evaluation criteria of overall least cost to company this work is entrusted to this agency. | |
| 2 | L2₹12.0 Cr+₹4.3 L (0.36%)Rejected-Finance 601 602 MIG 14TH CROSS M C LAYOUT VIJAYNAGAR BANGALORE KARNATAKA 560040 | BENGALURU URBAN | KARNATAKA | 560040 | L2 | Rejected-Finance Other than successful tenderer | |
| 3 | L3₹12.0 Cr+₹8.0 L (0.67%)Rejected-Finance | L3 | Rejected-Finance Other than successful tenderer | |
| 4 | L4₹12.0 Cr+₹11.2 L (0.94%)Rejected-Finance | L4 | Rejected-Finance Other than successful tenderer | |
| 5 | L5₹12.1 Cr+₹16.5 L (1.38%)Rejected-Finance UNIT NO 124 1ST FLOOR DOWN TOWN MALL BESIDE LOTUS HOSPITAL LAKDIKAPUL HYDERABAD RANGAREDDY TELANGANA 500004 | HYDERABAD | TELANGANA | 500004 | L5 | Rejected-Finance Other than successful tenderer |
Tender Value
₹12.1 Cr
EMD Value
₹5 L
Closing Date
9 Apr 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy. Gen. Manager (Contracts and MM)
ES/Contracts, BEL, Bangalore - 560013
Engagement of Contract Workers for Carrying out Miscellaneous Works in A and F Division.
2022_BEL_89499_1
03/000025/2022/1
Open Tender
Miscellaneous
Item Rate
730 days
ES/Contracts, BEL, Bangalore
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹5 L
Yes
28 May 2022
25 Mar 2022
11 Apr 2022
25 Mar 2022
9 Apr 2022
25 Mar 2022
25 Mar 2022 - 6 Apr 2022
180 days
Amount
PART A - Management Services
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Clerical workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 2 Clerical workers per day x 313 days = 626 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Unskilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 1 Unskilled workers per day x 313 days = 313 Mandays).
PART-B : Central HR
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Highly Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 1 Highly Skilled workers per day x 313 days = 313 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Clerical workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 2 Clerical workers per day x 313 days = 626 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 3 Skilled workers per day x 313 days = 939 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Unskilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 10 Unskilled workers per day x 313 days = 3130 Mandays).
PART-C : Security Dept
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Receptionist (Highly Skilled workers) etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 2 Receptionist (Highly Skilled workers) per day x 313 days = 626 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 2 Skilled workers per day x 313 days = 626 Mandays).
PART-D : IMD
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Unskilled worker etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 1 Unskilled worker per day x 313 days = 313 Mandays).
PART-E : Torque
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Clerical worker etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 1 Clerical worker per day x 313 days = 313 Mandays).
PART-F : BAE
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Clerical workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 2 Clerical workers per day x 313 days = 626Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Skilled worker etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 1 Skilled worker per day x 313 days = 313 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Unskilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 3 Unskilled workers per day x 313 days = 939 Mandays).
PART-G : CLD
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Highly Skilled worker etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 1 Highly Skilled worker per day x 313 days = 313 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Clerical worker etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 1 Clerical worker per day x 313 days = 313 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Unskilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 3 Unskilled workers per day x 313 days = 939 Mandays).
PART-H : Canteen
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Highly Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 48 Highly Skilled workers per day x 313 days + 16 Highly Skilled workers per day x 64 Govt Holidays / Sundays = 16048 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 37 Skilled workers per day x 313 days + 14 Skilled workers per day x 64 Govt Holidays / Sundays = 12477 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Semi Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 27 Semi Skilled workers per day x 313 days + 6 Semi Skilled workers per day x 64 Govt Holidays / Sundays = 8835 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Unskilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 130 Unskilled Workers per day x 313 days + 50 Unskilled Workers per day x 52 Sundays = 43290 Mandays).
PART-I : Corporate Standards
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Highly Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 2 Highly Skilled workers per day x 313 days = 626 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Clerical workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 4 Clerical workers per day x 313 days = 1252 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 6 Skilled workers per day x 313 days = 1878 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Unskilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 1 Unskilled workers per day x 313 days = 313 Mandays).
PART-J : Central Finance
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Clerical workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 44 Clerical workers per day x 313 days = 13772 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 3 Skilled workers per day x 313 days = 939 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Unskilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 5 Unskilled workers per day x 313 days = 1565 Mandays).
PART-K : Networking (IS/BG)
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 3 Skilled workers per day x 313 days = 939 Mandays).
PART-L : BEL Hospital
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Highly Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 24 Highly Skilled workers per day x 313 days = 7512 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Clerical workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 5 Clerical workers per day x 313 days = 1565 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 18 Skilled workers per day x 313 days = 5634 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Semi Skilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 2 Semi Skilled workers per day x 313 days = 626 Mandays).
Carryingout the work all as specified in Annexure-IB and or as directed by Engineer-in-Charge by engaging the required number of Unskilled workers etc., complete (Note: i) The rate to be quoted shall be for the complete finished work per manday of 8 hours working. ii) The minimum labour force to be engaged on work on all the working days against this item is indicated in Annexure-IC. iii) The working sheet shall be furnished as per the sample format indicated at Annexure-IE. iv) The quoted rate shall be exclusive of GST. v) 21 Unskilled workers per day x 313 days = 6573 Mandays).
Cosmopolitan industrial Security and Detective Services Private Limited
SSE MANPOWER CONSULTANCY PVT LTD
BEE GEE FACILITY SERVICES
BALACHANDIKA SECURITY FORCE INDIA PVT LTD
KSF9 CORPORATE SERVICES PVT LTD
ACE INFOTEXIS PVT LTD
G A Digital Web Word P Ltd.
Principle Security and Allied Services Pvt Ltd
Nimbus Harbor Facilities Management Private Limited
M/s Sree Venkateshwara Enterprises
M/s Sree Vinayaka Enterprises
BHARAT ELECTRONICS AMBEDKAR MULTIPURPOSE CO-OPERATIVE SOCIETY LTD.
VISKAAN ASSOCIATES
Renovision Automation Services Pvt Ltd.
Cleanway Management Systems India Pvt Ltd
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
95054749.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .