| 1 | L1₹1.0 LAccepted-AOC FLAT NO 3 SECTOR 9 GALI NO 8 NEAR HOUSE NO 765 AMBEDKAR NAGAR GURUGRAM HARYANA 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹1.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹1.2 LRejected-Finance 3609 31A VISHNU GARDEN RAJENDRA PARK GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹1.2 L | L2 | Rejected-Finance Due to not a lowest bidder |
Tender Value
₹1.3 L
EMD Value
₹2,700
Closing Date
25 May 2026, 9:00 amClosed
ANIL KUMAR
DIV 5 Gurugram
Providing and fixing RCC pillars 1.80 mtr high of size 5.5x5.5 at bottom and 4.5x4.5 at top with barbed wire fencing in Sector 45 Gurugram
2026_HBC_522118_1
2026664ED7C1 752A 4C88 B291 18FE9F079D29256HSV
Open Tender
Civil Works
30 days
Gurugram
2 documents required · 2 mandatory
₹250
₹2,700
Yes
2 Jun 2026
16 May 2026
25 May 2026
16 May 2026
25 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | [4.8.1]Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m : 1. All kinds of soil | 15.04 | cum | 141 | ₹2,120.64 | BI01010001010000000000000515BI0100001113 |
| 2 | [[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 13.6 | cum | 2,442 | ₹33,211.2 | BI01010001010000000000000515BI0100001118 |
| 3 | 1/6.2.2 Providing and laying cement concrete in retaining walls, return walls, walls (any
thickness) including attached pilasters, columns, piers, abutments, pillars, posts,
struts, buttresses, struts, buttresses, string or lacing courses, parapets, coping, bed
blocks, anchor blocks, plain window sills, fillets, sunken floor etx., up to floor four level, excluding the cost of centering, shuttering and finishing:
1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm
nominal size) 1.80 x (0.139 x 0.139 plus 0.114 x 0.114)/2 = 0.0289 Cum @ Rs. 3477 Per Cum Rs. 100.48
2/6.33.6 Steel reinforcement for R.C.C. works, where not included in the complete rate or RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding and placing shall not be measured and cost of these items
shall be deemed to be included in the rates for reinforcement, Thermo-Mechanically
Treated bars of grade Fe-500D or more.
6 mm dia 4 No. Bas = 1.80 x 4 = 7.20 Mtr.
Rings 10 No. @ 0.32 Mtr. (Av. Length) = 3.20 Mtr.
Total = 7.20 plus 3.20 = 10.40 Mtr. @0.22 Kg. Per
Mtr. = 2.29 Kg. @ Rs. 61.00 Per Kg. Rs. 139.69
3/NS Extra for steel shuttering pattern, as specified in Architectural drawings
1.80x2x2(0.139 plus 0.144)/2 = 0.91 Sqm @ 85/- Per Sqm (L.S.) Rs. 77.35
4/9.1 Hoisting R.C.C. lintels and placing in position up to floor IV level
0.0289 Cum @ Rs.1615/- Per Cum Rs. 46.67
5/N.S. Providing and fixing of Steel hooks 5 Nos. @ Rs. 20/- Each Rs. 100.00
Item
6/N.S. Carriage of RCC pole at Site of work Rs. 30.00
Total Rs. 494.19
Item | 165 | each | 494.19 | ₹81,541.35 | BI01010001010000000000000515BI0100001122 |
| 4 | 1/NS item G.I barbed wire of 12 gauge as per is 278-1978 specifications having weight 136gm per mtr minimum
3mtr x4 horizontal =12.00 mtr
2 cross lines =2x3.30=6.60mtr
total =18.60 mtr
18.60x0.136=2.52 kg@ Rs 49 \- kg (as per HSR 2023 RM053) Rs 123.48
add contractor profit @10% Rs 12.34
2/34.29.1 Labour for fixing of barbed wire fencing Rs 33.00
Total Rs 168.82
Rate per meter =168.82/3 =56.27 per Mtr | 270 | meter | 56.27 | ₹15,192.9 | BI01010001010000000000000515BI0100001123 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_601036.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid