Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.3 LAccepted-AOC | ₹69.3 L | L1 | Accepted-AOC quoted lowest amount and technically qualified |
| 2 | L2₹70.6 LRejected-Finance | ₹70.6 L | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 3 | L3₹72.5 LRejected-Finance 14 453 INDIRA NAGAR LUCKNOW UTTAR PRADESH | BIJNOR | UTTAR PRADESH | 246701 | ₹72.5 L | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 4 | L4₹73.2 LRejected-Finance N A | PALWAL | HARYANA | 121004 | ₹73.2 L | L4 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 5 | L5₹74.7 LRejected-Finance B 62 TEZ KUMAR PLAZA TRILOKI NATH ROAD HAZRATGANJ LUCKNOW UTTAR PRADESH 226001 UDYAM UP 50 0055899 | LUCKNOW | UTTAR PRADESH | 226001 | ₹74.7 L | L5 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| Sl No | Description | Qty | Unit | M/S Singh Construction L7 | CHANDRA SEN L3 | sri durga shakti traders L1 | M/S MAHAJAN CONSTRUCTION AND SUPPLIER L4 | ARUN CONSTRUCTION L2 | M/S SINGH CONSTRUCTION L8 | AKANKSHA ASSOCIATES L5 | M/S SINGH CONTRACTOR L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work for clearance of Escape by mechanical equipment i.e by Hydraulic excavator (Poclain) of capacity of 60 cum per hour and including dressing of excavated earth . | 49,452.22 | Cum. | 41 ₹20.3 L | 26 ₹12.9 L | 39 ₹19.3 L | 40 ₹19.8 L | 35 ₹17.3 L | 45.65 ₹22.6 L | 25 ₹12.4 L | 39.24 ₹19.4 L |
| 2.00 | Cleaning thick jungle and thorney bushes without uprooting above 100 Upto 500 cusec . | 162.21 | Per 100 Sqm. | 450 ₹72,994.50 | 200 ₹32,442 | 7 ₹1,135.47 | 487 ₹78,996.27 | 495 ₹80,293.95 | 557 ₹90,350.97 | 550 ₹89,215.50 | 78.49 ₹12,731.86 |
| 3.00 | Demolishing brick work manually/by mechanical means including stacking of servicable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 7.61 | Cum. | 180 ₹1,369.80 | 500 ₹3,805 | 300 ₹2,283 | 751 ₹5,715.11 | 700 ₹5,327 | 861 ₹6,552.21 | 450 ₹3,424.50 | 156.98 ₹1,194.62 |
| 4.00 | Dismantling R.B. work manually/by mechanical means including stacking of steel bars and disposal of unservicaable material within 50 meters lead as per direction of Engineer-in-charge. | 9 | Cum. | 200 ₹1,800 | 1,000 ₹9,000 | 4,200 ₹37,800 | 1,160 ₹10,440 | 1,200 ₹10,800 | 1,328 ₹11,952 | 500 ₹4,500 | 156.98 ₹1,412.82 |
| 5.00 | Laying brick soling layer on prepared sub-grade with brick on edge accoridng to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25mm thick layer of earth over brick soiling, watering and rolling the same with three wheel road roller 80-100 Kn as per MORD Technical Spacification Clause 412. | 9,800 | Sqm. | 585 ₹57.3 L | 550 ₹53.9 L | 430 ₹42.1 L | 490 ₹48.0 L | 480 ₹47.0 L | 562.5 ₹55.1 L | 580 ₹56.8 L | 439.54 ₹43.1 L |
| 6.00 | Fabrication of steel Gate (1.50 X 1.50 Mtr) with Angle Iron & 12mm Squar Bar including cutting .driling .welding where necessary and fixing in positation including all cost of lead &etc.for proper completion of work . With one coat of red oxide primer . But excluding cost of cement concret fixing i/c cost of all material, labour, T&P etc. | 1,575.68 | Kg. | 100 ₹1.6 L | 150 ₹2.4 L | 85 ₹1.3 L | 129 ₹2.0 L | 150 ₹2.4 L | 147.2 ₹2.3 L | 130 ₹2.0 L | 74.56 ₹1.2 L |
| 7.00 | First Class brick work in 1:4 cement and coarse sand mortar in Super-structure including necessary cutting and molding of bricks as required and also including honey comb brick work thickness not to be less than 11/2 brick thick including supply of all materials, labour and T&P etc. Required for proper completion of the work. | 12.86 | Cum. | 7,000 ₹90,020 | 5,500 ₹70,730 | 3,100 ₹39,866 | 4,242 ₹54,552.12 | 5,200 ₹66,872 | 4,860 ₹62,499.60 | 4,000 ₹51,440 | 4,238.46 ₹54,506.60 |
| 8.00 | Stuck deep pointing in 1:2 cement with coarse sand mortar including all cost of materials, labour and T&P with lead upto 60m and lift upto 3.0 m | 44.01 | Sqm. | 30 ₹1,320.30 | 150 ₹6,601.50 | 7,100 ₹3.1 L | 189 ₹8,317.89 | 200 ₹8,802 | 218 ₹9,594.18 | 150 ₹6,601.50 | 490.56 ₹21,589.55 |
| 9.00 | 10 mm to 12 mm thick cement plaster in 1:2 cement mortar single coat on rough side of single or half brick wall for interior plastering finished even and smooth. | 80.7 | Sqm. | 200 ₹16,140 | 100 ₹8,070 | 17 ₹1,371.90 | 99 ₹7,989.30 | 100 ₹8,070 | 112 ₹9,038.40 | 100 ₹8,070 | 137.37 ₹11,085.76 |
| 10.00 | Providing and laying Cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone ballast 20 mm. nominal size) in foundation including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. | 1.45 | Cum. | 6,500 ₹9,425 | 5,500 ₹7,975 | 6,800 ₹9,860 | 4,724 ₹6,849.80 | 5,500 ₹7,975 | 5,410 ₹7,844.50 | 5,000 ₹7,250 | 4,787.89 ₹6,942.44 |
Tender Value
₹97 L
EMD Value
₹1.9 L
Closing Date
17 Oct 2025, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE Six circle lucknow
Janpad Unnao me Taura Scape ke km 0.000 se km 4.000 tak punarsathapana karya avam bayi patari ke km 1.200 se km 4.000 par brick on edge soling ka karya
2025_UPIDC_1081543_7
03/SE-6/2025-26
Open Tender
Civil Works
180 days
unnao
Please refer tender document
2 documents required · 2 mandatory
₹3,324
₹1.9 L
SE Six circle lucknow
24 Dec 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
13 Oct 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid