| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Fee/PreQual/Technical/Finance TAMIL NADU | TIRUVANNAMALAI | TAMIL NADU | 604401 | ₹4.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.9 L+₹24,511.48 (5.25%)Admitted-Fee/PreQual/Technical/Finance | ₹4.9 L+₹24,511.48 (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.9 L+₹24,761.77 (5.31%)Admitted-Fee/PreQual/Technical/Finance | ₹4.9 L+₹24,761.77 (5.31%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | VARADHAN L3 | M.VALARMATHI L1 | Thangavel L2 |
|---|---|---|---|---|---|---|
| 1.00Providing CC road to Perumal koil street at Vanniyamottur H/O Gudalur Pancahayat Sholinghur Block Ranipet District | ||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 6.48 | Cum | 130.89 ₹848.17 | 260 ₹1,684.8 | 130.8 ₹847.58 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 18.4 | Cum | 5,682.1 ₹1,04,550.64 | 5,500 ₹1,01,200 Lowest | 5,680 ₹1,04,512 |
| 4.00 | Supply and errecton of sheet centring with out scupolding including all charges etc completed. | 64.5 | Sqm | 182.5 ₹11,771.25 | 173 ₹11,158.5 Lowest | 180 ₹11,610 |
| 5.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 4.97 | Cum | 6,437.8 ₹31,995.87 | 6,300 ₹31,311 Lowest | 6,437 ₹31,991.89 |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 38.23 | Cum | 6,987.2 ₹2,67,120.66 | 6,538 ₹2,49,947.74 Lowest | 6,987 ₹2,67,113.01 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 74,931.59 ₹74,931.59 | 71,154.37 ₹71,154.37 Lowest | 74,893.41 ₹74,893.41 |
Tender Value
₹4.9 L
EMD Value
₹5,000
Closing Date
3 Jul 2026, 3:00 pmClosed
BDO BP
Panchayat Union Sholinghur
Providing CC road to Perumal koil street at Vanniyamottur H/O Gudalur Pancahayat Sholinghur Block Ranipet District
2026_RDTN_681482_1
A2/1250/2025
Open Tender
Civil Works
Item Rate
90 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
Yes
11 Sept 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing CC road to Perumal koil street at Vanniyamottur H/O Gudalur Pancahayat Sholinghur Block Ranipet District | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | - | Cum | 131.89 | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 1 | Cum | 5,682.13 | ₹5,676.45 |
| 4 | Supply and errecton of sheet centring with out scupolding including all charges etc completed. | - | Sqm | 182.5 | - |
| 5 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 1 | Cum | 6,437.84 | ₹6,431.4 |
| 6 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 1 | Cum | 6,987.15 | ₹6,980.16 |
| 7 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_818992.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .