SE, EWC, DVVNL, Agra
Urja Bhawan 220 KV S/s Sikandra Bypass Road, Agra
For Repairing of 10/16 KVA to 400 KVA Damage Distribution Transformer at workshop Rajapur (Chitrakoot) under EWD, Banda
2025_DVVNL_1032233_1
53/2025-26
Open Tender
Electrical Works
Piece-work
365 days
DVVNL
As Per Pre Qualifying Conditions
2 documents required · 2 mandatory
₹3,540
www.dvvnl.org
₹50,000
20 Jun 2025
24 Apr 2025
8 May 2025
24 Apr 2025
8 May 2025
24 Apr 2025
10/16 KVA Single Phase Alu. Wound (Workshop RAJAPUR (CHITRAKOOT)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
Refiting/Replacement/Fixing of HT Bushings.
Refiting/Replacement/Fixing of LT Bushings.
Refiting/Replacement/Fixing of HT Bushing Rods.
Refiting/Replacement/Fixing of LT Bushing Rods.
Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
Refiting/Replacement/Fixing of Arching Horns/Breather.
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
25 KVA Three Phase Alu. Wound (Workshop RAJAPUR (CHITRAKOOT)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
Refiting/Replacement/Fixing of HT Bushings.
Refiting/Replacement/Fixing of LT Bushings.
Refiting/Replacement/Fixing of HT Bushing Rods.
Refiting/Replacement/Fixing of LT Bushing Rods.
Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
Refiting/Replacement/Fixing of Arching Horns/Breather.
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
63 KVA Three Phase Alu. Wound (Workshop RAJAPUR (CHITRAKOOT)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
Refiting/Replacement/Fixing of HT Bushings.
Refiting/Replacement/Fixing of LT Bushings.
Refiting/Replacement/Fixing of HT Bushing Rods.
Refiting/Replacement/Fixing of LT Bushing Rods.
Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
Refiting/Replacement/Fixing of Arching Horns/Breather.
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
100 KVA Three Phase Alu./Cu. Wound (Workshop RAJAPUR (CHITRAKOOT)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
Refiting/Replacement/Fixing of HT Bushings.
Refiting/Replacement/Fixing of LT Bushings.
Refiting/Replacement/Fixing of HT Bushing Rods.
Refiting/Replacement/Fixing of LT Bushing Rods.
Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
Refiting/Replacement/Fixing of Arching Horns/Breather.
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
160 KVA Three Phase Alu. Wound (Workshop RAJAPUR (CHITRAKOOT)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
Refiting/Replacement/Fixing of HT Bushings.
Refiting/Replacement/Fixing of LT Bushings.
Refiting/Replacement/Fixing of HT Bushing Rods.
Refiting/Replacement/Fixing of LT Bushing Rods.
Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
Refiting/Replacement/Fixing of Arching Horns/Breather.
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
250 KVA Three Phase Alu./Cu. Wound (Workshop RAJAPUR (CHITRAKOOT)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
Refiting/Replacement/Fixing of HT Bushings.
Refiting/Replacement/Fixing of LT Bushings.
Refiting/Replacement/Fixing of HT Bushing Rods.
Refiting/Replacement/Fixing of LT Bushing Rods.
Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
Refiting/Replacement/Fixing of Arching Horns/Breather.
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
400 KVA Three Phase Cu. Wound (Workshop RAJAPUR (CHITRAKOOT)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
Refiting/Replacement/Fixing of HT Bushings.
Refiting/Replacement/Fixing of LT Bushings.
Refiting/Replacement/Fixing of HT Bushing Rods.
Refiting/Replacement/Fixing of LT Bushing Rods.
Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
Refiting/Replacement/Fixing of Arching Horns/Breather.
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
Shiva Electricals (BID ID -5175952)
R.S. INDUSTRIAL WORKS (BID ID -5176520)
R.D. ENTERPRISES (BID ID -5176530)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .