| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance HOUSE NO 119 A LANE NO 4 GREATER KAILASH JAMMU 180011 | JAMMU | JAMMU AND KASHMIR | 180011 | -37.99% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.7 LAdmitted-Finance | -28.50% | ₹5.7 L | L2 | Admitted-Finance |
| 3 | L3₹5.8 LAdmitted-Finance | -27.00% | ₹5.8 L | L3 | Admitted-Finance |
| 4 | L4₹6.8 LAdmitted-Finance | -14.99% | ₹6.8 L | L4 | Admitted-Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
5 Feb 2026, 6:00 pmClosed
Executive Engineer PWD RandB PROJECT DIVISION III
Office of the PWD RandB PROJECT DIVISION III JAMMU
Extension of drain from Bua datti ji Temple to back side of Canteen at Civil Secretariat, Jammu. CNO- 616 NP
2026_PWDJK_301856_3
Short e-NIT No. 132 of 2025-2026 Dated 30-01-2026
Open Tender
Civil Works
30 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PROJECT DIVISION III
₹16,000
Office of the PWD RandB PROJECT DIVISION III JAMMU
10 Feb 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
2 Feb 2026
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix)
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
"Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) "
" Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms"
Steel reinforcement for R.C.C. work includingstraightening, cutting, bending, placing inposition and binding all complete above plinthlevel Thermo-Mechanically Treated bars of grade Fe-500D or more.
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases upto five level including curing butexcluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size
"Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. "
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Providing and fixing of PVC pipes for Drainage Sewerge Rian water flow pipe Etc including labour and Material costs complete job in all heights 4' dia
Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) Medium shade using 50% white cement and 50% ordinary cement
"Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand)"
"Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level"
"12mm Cement plaster of mix: 13.1.1 1 : 4 ( 1 cement : 4 fine sand)"
shifting of debries / cleaning site /other allied works at site by engaging skilled and unskilled labours ,unskilled
Maintenance of sewerage line and drain by engaging sweaper ( cleaner ) at site during blockage of sewerage line
Engaging trolley for shifting of mulba from site to beyond the muncipality limit including loading and unloading complete
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_979390.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid