Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance 132 02 ASAMANIA DEY STREET P O SANTIPUR DIST NADIA PIN 741404 | SANTIPUR | NADIA | WEST BENGAL | 741404 | ₹3.9 L | L1 | Accepted-Finance SUCCESFUL-L1 |
| 2 | L2₹3.9 LRejected-Finance | ₹3.9 L | L2 | Rejected-Finance UNSUCCESFUL-L2 |
| 3 | L3₹3.9 LRejected-Finance | ₹3.9 L | L3 | Rejected-Finance UNSUCCESFUL-L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not elegible due to improper submission of Machineries documents |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not elegible due to improper submission of Bank Solvency documents |
Tender Value
₹3.9 L
EMD Value
₹7,715
Closing Date
14 Jul 2026, 12:00 pmClosed
Executive Engineer, Bankura Division, PWD
Office of the Executive Engineer Bankura Division PWD Kenduadihi Bankura
Inside repairing of distress condition of Medical Officers (MO) quarter (G-2-12) of G2 residential building at Gobindanagar campus of Bankura Sammilani Medical College and Hospital under Bankura Division PWD (Civil Work)
2026_WBPWD_5015921_3
WBPWD/EE/BANKURA DIVISION/NIT- 06/2026-2027
Open Tender
CIVIL WORKS
Percentage
45 days
Bankura
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,715
17 Aug 2026
24 Jun 2026
17 Jul 2026
30 Jun 2026
14 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75 m as directed. | 171.43 | Sq.m. | 19 | ₹3,257.17 |
| 2 | Labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damage will be paid separately).
(a) Upto area 2.5 Sq.m
In Second Floor | 1.68 | Sq.m. | 119 | ₹199.92 |
| 2.01 | (b) Above area 2.5 Sq.m
In Second Floor | 4.2 | Sq.m. | 146 | ₹613.2 |
| 3 | Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge.
c) 37.5 mm thick
In Second Floor | 23.28 | Sq.m. | 563.17 | ₹13,110.6 |
| 4 | Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface). In Second Floor | 23.28 | Sq.m. | 309 | ₹7,193.52 |
| 5 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture]
M 25 Grade (i) Pakur Variety
In Third Floor | 1.05 | Cu.m. | 6,101.2 | ₹6,406.26 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction
(i) Tor steel/Mild Steel
II. JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL
In Third floor. | - | MT | 56,031.47 | - |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work.
In Third floor. | 7.75 | Sq.m. | 411 | ₹3,185.25 |
| 8 | Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish directed within a lead of 75 m.
In Second Floor | 87.34 | Sq.m. | 62 | ₹5,415.08 |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface]
(i) With 1:6 cement mortar
(b) 20 mm thick plaster.
In Second Floor | 136.49 | Sq.m. | 157.71 | ₹21,525.84 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
2911-ii.pdf
Tender Documents • 0.58 MB
BOQ_5085018.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].