| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 CrAccepted-Finance SC 326 SHASTRI NAGAR GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹19.5 Cr | L1 | Accepted-Finance 1 |
| 2 | L2₹20.6 CrRejected-Finance | ₹20.6 Cr | L2 | Rejected-Finance 2 |
| 3 | L3₹21.1 CrRejected-Finance AHROLA NAWAGI JUNAWAI GUNNAUR DISTT SAMBHAL | GUNNAUR | SAMBHAL | ₹21.1 Cr | L3 | Rejected-Finance 3 |
| 4 | L4₹21.2 CrRejected-Finance | ₹21.2 Cr | L4 | Rejected-Finance 4 |
| 5 | L5₹21.3 CrRejected-Finance AVADH PURI COLONY AMANIGANJ AYODHYA | AYODHYA | AYODHYA | UTTAR PRADESH | ₹21.3 Cr | L5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | Krishna Infratec L7 | Shri Krishna And Company L4 | M/s Raj Laxmi Enterprises L2 | SHARMA CONSTRUCTION PROJECT PVT LTD L1 | PPS BUILDERS PRIVATE LIMITED L9 | PRADEEP KUMAR CONTRACTOR L3 | ARUNIMA CONSTRUCTIONS PRIVATE LIMITED L8 | M/S R K CONSTRUCTION L5 | M/s Hanu Infrastructure Pvt Ltd L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing Jungle including uprooting of vegetation,grass,bush,wood trees and sapling of girth up to 30 cm,measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m.Outside the periphery of area cleaned (Sl No.259) | 25,200 | Sqm | 5 ₹1.3 L | 6.7 ₹1.7 L | 10 ₹2.5 L | 10 ₹2.5 L | 5 ₹1.3 L | 5.71 ₹1.4 L | 6 ₹1.5 L | 4.81 ₹1.2 L | 0.5 ₹12,600 |
| 2.00 | Scarifying the old painted surface including disposal of all scarified material at a distance of 30 m as directed by E/I (S.I. 772) | 15,570 | cum | 3 ₹46,710 | 40 ₹6.2 L | 250 ₹38.9 L | 50 ₹7.8 L | 3 ₹46,710 | 3.8 ₹59,166 | 2.5 ₹38,925 | 2.7 ₹42,039 | 1 ₹15,570 |
| 3.00 | Earth Work in excavation of foundation of structures as drawing and technical specification, including setting out, construction of shoring and braching, removal of stumps and other deleterious matter, dressing of sides and bottom back filling the excavation earth to the extent required and and utilising the remaining earth locally for road work. (Morth Specification 3.13 304 B) | 10,240 | cum | 70 ₹7.2 L | 50 ₹5.1 L | 55 ₹5.6 L | 60 ₹6.1 L | 80 ₹8.2 L | 30 ₹3.1 L | 100 ₹10.2 L | 72.9 ₹7.5 L | 30 ₹3.1 L |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and lead, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per MORT&H specification No.305 | 53,559 | cum | 110 ₹58.9 L | 50 ₹26.8 L | 120 ₹64.3 L | 60 ₹32.1 L | 115 ₹61.6 L | 30 ₹16.1 L | 150 ₹80.3 L | 105.75 ₹56.6 L | 50 ₹26.8 L |
| 5.00 | Construction of Subgrade and earthen shoulders with apporved material obtained from borrow pits with all ifts and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 as per Tecnical Specification Clause 303.2 | 6,000 | cum | 120 ₹7.2 L | 50 ₹3 L | 150 ₹9 L | 60 ₹3.6 L | 120 ₹7.2 L | 30 ₹1.8 L | 110 ₹6.6 L | 106.2 ₹6.4 L | 50 ₹3 L |
| 6.00 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grador on prepared surface mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density,complete as per clause 401 | 7,530 | cum | 4,000 ₹3.0 Cr | 4,100 ₹3.1 Cr | 3,700 ₹2.8 Cr | 3,700 ₹2.8 Cr | 4,200 ₹3.2 Cr | 3,700 ₹2.8 Cr | 4,100 ₹3.1 Cr | 3,790.8 ₹2.9 Cr | 4,300 ₹3.2 Cr |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with garader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. for proper completion of the work as per MORT & H specifications Sr No. 4.14 (406 (B)). | 19,400 | cum | 4,300 ₹8.3 Cr | 4,300 ₹8.3 Cr | 4,100 ₹8.0 Cr | 3,800 ₹7.4 Cr | 4,500 ₹8.7 Cr | 4,000 ₹7.8 Cr | 4,200 ₹8.1 Cr | 4,096.8 ₹7.9 Cr | 4,475 ₹8.7 Cr |
| 8.00 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. SI No. 6.01 (601) | 1,194 | cum | 4,950 ₹59.1 L | 6,000 ₹71.6 L | 6,000 ₹71.6 L | 4,500 ₹53.7 L | 5,350 ₹63.9 L | 4,700 ₹56.1 L | 5,000 ₹59.7 L | 4,900.5 ₹58.5 L | 4,000 ₹47.8 L |
| 9.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. | 4,116 | cum | 7,000 ₹2.9 Cr | 7,200 ₹3.0 Cr | 8,000 ₹3.3 Cr | 6,200 ₹2.6 Cr | 8,600 ₹3.5 Cr | 8,000 ₹3.3 Cr | 8,200 ₹3.4 Cr | 7,894.8 ₹3.2 Cr | 7,800 ₹3.2 Cr |
| 10.00 | Providing & applying Primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/Sqm. Using mechanical means including cost of all material, labour, T&P etc. required for proper completion of the work as per MORT&H specifications (2019) No. 5.01 (502). | 52,850 | Sqm | 20 ₹10.6 L | 25 ₹13.2 L | 35 ₹18.5 L | 12 ₹6.3 L | 35 ₹18.5 L | 20 ₹10.6 L | 33 ₹17.4 L | 31.5 ₹16.6 L | 35 ₹18.5 L |
Tender Value
₹24.7 Cr
EMD Value
₹31.1 L
Closing Date
25 Feb 2026, 12:00 pmClosed
Superintending Engineer
Suprintending Engineer, Budaun/Pilibhit Circle, PWD, Bareilly.
WIDENING AND STRENGTHENING WORK FROM CHAINAGE 0.000 TO 10.000 OF KACHLA HUSSAINPUR SAHASWAN ROAD UNDER R.S.N IN F.Y. 2025-26 IN DISTRICT BADAUN
2026_CEBLY_1114438_1
786/7Nivida(E.T)(CD-2)/25-26 Date 31.01.2026
Open Tender
Civil Works - Roads
450 days
CD-2 PWD Budaun
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,714
₹31.1 L
Yes
Bareilly
8 Apr 2026
10 Feb 2026
25 Feb 2026
10 Feb 2026
25 Feb 2026
10 Feb 2026
11 Feb 2026
Clearing Jungle including uprooting of vegetation,grass,bush,wood trees and sapling of girth up to 30 cm,measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m.Outside the periphery of area cleaned (Sl No.259)
Scarifying the old painted surface including disposal of all scarified material at a distance of 30 m as directed by E/I (S.I. 772)
Earth Work in excavation of foundation of structures as drawing and technical specification, including setting out, construction of shoring and braching, removal of stumps and other deleterious matter, dressing of sides and bottom back filling the excavation earth to the extent required and and utilising the remaining earth locally for road work. (Morth Specification 3.13 304 B)
Construction of embankment with approved material obtained from borrow pits with all lifts and lead, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per MORT&H specification No.305
Construction of Subgrade and earthen shoulders with apporved material obtained from borrow pits with all ifts and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 as per Tecnical Specification Clause 303.2
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grador on prepared surface mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density,complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with garader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. for proper completion of the work as per MORT & H specifications Sr No. 4.14 (406 (B)).
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. SI No. 6.01 (601)
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing.
Providing & applying Primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/Sqm. Using mechanical means including cost of all material, labour, T&P etc. required for proper completion of the work as per MORT&H specifications (2019) No. 5.01 (502).
Providing and applying tack coat with Bitumen (VG-10) using pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces cleaned with mechanical broom including cost of all type of materials,labour T&P etc. required for proper completion of the work as per MORT&H specification (2001) no.503
Providing and laying dense graded bituminous mecadam (Grade-1) 100 mm thick compacted with 100-120 THP batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.00 percent by weight of total mix and filler, transporting the hot mix to work site ,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tendem rollers to achieve the desired compaction as per MORT&H specification clause No.507 complete in all respect
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Providing and laying of factory made 80 mm thick interlocking cement concrete tiles(30mpa) including 25 mm thick compacted bed of fine sand compacting and proper embedding/laying of interlocking tiles levelling and dressing of surface to required level and slope ,filling joint with fine sand including the cost of materials, labour, T&P etc. required for proper completion of work as directed by Engineer Incharge.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications
Pointing with cement mortar 1:3 on brick work in Substructure as per Technical Specifications.
Supply and laying of compacted 40 mm guage brick ballast around and below hume pipe(As per N.S. Item No.6C)
Providing and Laying R.C.C NP-3 Hume Pipe 600 mm for culverts on first class bedding of granular material in single row including fixing coller with cement mortar 1:2 but excluding excavation , protection works back filling concrete and massonary works.
Providing and Laying R.C.C NP-3 Hume Pipe 1000mm for culverts on first class bedding of granular material in single row including fixing coller with cement mortar 1:2 but excluding excavation , protection works back filling concrete and massonary works.
RCC Grade M 20 using batching plant, transit mixer & manual placing.
Supplying, Fitting and Placing un- coated HYSD bar Rainforced cement in Foundation complete as per Drawing and Technical Specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
techsummary_2066575.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
addadum.pdf
Tender Documents • 2.62 MB
SBD.pdf
Tender Documents • 2.98 MB
BOQ_2066575.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid