| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.2 LAccepted-AOC | 1 | Accepted-AOC Accepted- Finance | |
| 2 | 2₹11.4 L+₹13,498.35 (1.20%)Rejected-Finance | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | T.SIVANANTHAN L2 | SELVARASU ENGINEERING CONTRACTORS L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Providing Water Supply Scheme and Functional House Hold Tap Connections 150 Nos at Kadaganalli Habitation in Guthiyalathur Panchayat, Sathyamangalam Panchayat Union of Erode District. | |||||
| 3.00 | Earth work excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation | 26.13 | Cum | 325 ₹8,492.25 | 316 ₹8,257.08 Lowest |
| 5.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 9.08 | cum | 6,465 ₹58,702.2 | 6,453 ₹58,593.24 Lowest |
| 7.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 26.6 | cum | 6,999 ₹1,86,173.4 | 6,976 ₹1,85,561.6 Lowest |
| 9.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1.7 | Mt | 99,385 ₹1,68,954.5 | 99,249 ₹1,68,723.3 Lowest |
| 11.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 48.64 | Sqm | 195 ₹9,484.8 | 186 ₹9,047.04 Lowest |
| 13.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 107.69 | Sqm | 655 ₹70,536.95 | 642 ₹69,136.98 Lowest |
| 15.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 14.43 | Cum | 11,150 ₹1,60,894.5 | 11,106 ₹1,60,259.58 Lowest |
| 17.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 26.12 | Cum | 65 ₹1,697.8 | 55 ₹1,436.6 Lowest |
| 19.00 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three P.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 6 | Sqm | 399 ₹2,394 | 387 ₹2,322 Lowest |
Tender Value
₹11.4 L
EMD Value
₹22,900
Closing Date
3 Feb 2026, 3:00 pmClosed
Block Development Officer(BP) Sathyamangalam
Block Development Officer(BP) Sathyamangalam
Construction of Kitchen Shed Building at Govt Higher Secondary School in Kal Kadampur H/o Guthiyalathur.
2026_RDTN_647144_1
Roc No.19/2026/A2 Dated.19.01.2026
Open Tender
Civil Works - Buildings
Item Rate
90 days
Block Development Officer(BP) Sathyamangalam
Construction of Kitchen Shed Building at Govt Higher Secondary School in Kal Kadampur H/o Guthiyalathur.
2 documents required · 2 mandatory
₹0
₹22,900
3 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
Earth work excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three P.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Fabrication of Supply of Steel grill gate using structural steel in all aspects as directed
Window
Labour Charges for fixing doors along frames in position etc complete
Labour Charges for fixing 1000 lit HDPE tank etc complete
Supplying and fixing P.V.C rain water down fall pipe of 110 m dia with necessary shoes, bends & clams etc
Supply and fixing of 1000 lit HDPE Tank
Provision for Electrification arrangements
Wiringwith2x1.5sq.mm.PVCinsulatedunsheathedFRLSSCcopperconductorof1100VgradeinsuitablePVCrigidpipeonwallandceilingwithPVCaccessorieswithTWswitchboxwith5AFTswitchinflushwithwallcoveredwithhylumsheetof3mmthickwithpaintingofsuitablecolourforopenPVClight/fanpoint(forelectronicregulator)(5pointspercoil) SD 22
Wiringwith2x1.5sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100VgradeinsuitablePVCrigidpipeconcealedinwallandceilingwithPVCaccessoriesinflushwithwallwith150mmx100mmx113mmTWswitchboxwith3mmthickhylemsheetcoverfor5A3pinnoninterlockingwallsocketwith5Aflushtypeswitchwithcontinuousearthwireconnectionof1.5sq.mmcopperwireandmakinggoodoftheconcealedportionwithsuitablecolourforconcealed PVC plug point SD 38
Supplyandfixingofsingleboxtype4'40Wfluorescentfittingcompletewithcopperchokeandcondensorwithconduitpipe suspension from the ceiling with PVC unsheathed FRLS copper leads from terminals to the fitting with tube SD 89
Supplyandrunof2of6sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100Von7/20GIbearerwirefor service connection mains SD 66
Supplyandrunof2of6sq.mm.(84/0.3)PVCinsulatedSCunsheathedFRLScopperconductorof1100Vgradein25mmdia GI pipe (Class 'B') bent at both ends with necessary angle iron up right and end supports for mains SD 71
Supplyandfixingof1200mm(48")ACceilingfancompletewithsteppedelectronic300Wregulatorwith300mmdownrod on the existing clamp SD 110
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_775780.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
techbidkITCHENSHED.pdf
Tender Documents • 0.48 MB
BOQ_775780.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .