Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹28.2 L+₹4.3 L (18.1%)Rejected-AOC | L2 | Rejected-AOC Being not L1 | |
| 3 | L3₹28.7 L+₹4.9 L (20.4%)Rejected-AOC | L3 | Rejected-AOC Being not L1 | |
| 4 | L4₹31.0 L+₹7.1 L (29.8%)Rejected-AOC H NO 2 19 1 VELGANOOR VILLAGE DANDEPALLI MANDAL MANCHERIAL DISTRICT TELANGANA 504 215 | PRAKASAM | ANDHRA PRADESH | 504215 | L4 | Rejected-AOC Being not L1 | |
| 5 | L5₹31.8 L+₹7.9 L (33.1%)Rejected-AOC | L5 | Rejected-AOC Being not L1 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
18 Apr 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Shri M Saravanan, IDSE, GE
Garrison Engineer North 35 Allenby Lines Secunderabad 500087
PERIODICAL SERVICES AND REPAIRS TO RCC CHAJJAS PARAPET WALLS COLUMNS CEILING PLASTERING PLINTH PROTECTION AND CONNECTING WORKS AT ZONE A B AREA UNDER AGE B R N NO I OF GE NORTH SECUNDERABAD
2024_MES_647937_1
8760
Open Tender
Civil Works
Item Rate
300 days
Garrison Engineer North 35 Allenby Lines Secundera
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER NORTH
₹90,000
Yes
15 Jun 2024
27 Mar 2024
25 Apr 2024
27 Mar 2024
18 Apr 2024
11 Apr 2024
Amount
Material and labour for Complete removal of existing treatment of external surfaces of wall including removing fungus /algae dirt, oil, grease and loose particles by wire brush, cleaning, washing and removing dust. Cracks less than 2 mm, should be cleaned free of dust with a vacuum cleaner, etc and applying 3.00 mm thick white cement based wall care putty for a smooth finish complete all as specified and as directed by Engineer-in-charge. Note:-Unit rate quoted shall include for necessary scaffolding, trestles, ladders & cradles required for execution of the work and protective works etc. Make:-Birla White / Asian Paint / Diamond wall putty /JK Putty
Material and labour for applying 2 coats of weather proof paint over a coat of exterior wall primer including preparation of surfaces and allow it to dry before taking up the two coats,etc complete all as specified and as directed by Engineer-in-charge. Make: Apex Ultima from Asian Paints or equivalent in All Guard from Berger, Weather Shield Max Exterior Acrylic from ICI Dulux. (I) Unit rate quoted shall include for necessary scaffolding, trestles, ladders & cradles required for execution of the work and protective works. (II) The rate of application of primer and two coats shall be as per manufacturers instructions. (III) A time gap of eight hours shall be maintained between the application of primer and each coat . (IV) Application of primer and paint shall be done by an authorised applicator of the paint. (V) Necessary spreading and removing coverings to doors, windows, floors, fittings etc to protect them from splashes and cleaning of the doors/windows and floors after carrying out painting shall be made by the contractor. (VI) The contractor shall deposit full quantity of weather proof paint to the user unit calculated based on coverage as per manufacturer's instructions before starting of paint work. The paint shall be issued to the contractor by user unit as per weekly requirement.
Material and labour for preparing the old plastered or unplastered decorated surfaces of walls and applying one coat of white wash complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing the old plastered or unplastered decorated surfaces of ceilings and applying one coat of white wash complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing the old plastered or unplastered decorated surfaces of walls and applying two coat of white wash complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing the plastered or un plastered old decorated surfaces of walls and applying one coat of colour wash complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing the plastered or un plastered old decorated surfaces of walls and applying two coat of colour complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparation of old painted surfaces of walls including brooming down or steel wire brushing scraping down smoke soot, moulds, moss: efforescent salts and trading oil, greasy spots and applying one coat of oil bound distemper (oil emulsion) and including wherever necessary filling of nail holes/ inequalities with Putty for smooth finish of any height .etc complete all as specified and as directed by Engineer-in-charge.
All as per item No.8 above but on ceilings complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing old decorative surfaces of walls, by washing, rubbing down, stopping and applying one coat of cement base paint of any colour complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing old decorative surfaces of walls, by washing, rubbing down, stopping and applying two coats of cement base paint of any colour complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing old painted surfaces of walls and applying one coat of weather proof paint on external surfaces of walls and celing, including necessary scaffolding and saftey precations to the work complete all as specified and as directed by Engineer-in-charge. Make : Apex from Asian Paints or equivalent in All Guard from Berger, Weather Shield Max Exterior Acrylic from ICI Dulux
Material and labour for preparation of old painted wooden surfaces of any description over 10 centimetre width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparation of old painted steel and iron surfaces of any description over 10 centimetre width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing old surfaces of wood and wood based material of any description and girth not otherwise described and treated with one coat of creosote oil complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparation of old painted surfaces of walls including brooming down or steel wire brushing scraping down smoke soot, moulds, moss: efforescent salts and trading oil, greasy spots and applying one coat of plastic emulsion(Royal shyne luxury emulsion) and including wherever necessary filling of nail holes/ inequalities with Putty for smooth finish of any height .etc complete all as specified and as directed by Engineer-in-charge.
Material and Labour for applying two coats of french polishing of any description, width or girth duly preparation and cleaning of the old surfaces complete all as specified and as directed by Engineer-in-charge.
Material and labour for complete removal of existing treatment of old painted wall for internal surfaces and applying 3.00 mm thick in two layers of white cement based wall care putty smooth finish.etc of approved make & shade on walls and other places of up toany height complete all as specified and as directed by Engineer-in-charge.
Material and labour for applying two coats of oil bound distemper (oil emulsion) over a coat of primer of approved make & shade on walls of up to any height etc, complete all as specified and as directed by Engineer-in-charge.
Material and labour for applying two coats of plastic emulsion (Royal shyne luxury emulsion) over a coat of primer of approved make & shade on walls of up to any height etc, complete all as specified and as directed by Engineer-in-charge.
Material and labour for filling cracks with polymer based chemical (Dr fixit cracks shrink free ) for cracks not exc 10 mm in width as per manufacturer instruction on wall surfaces on concrete or masonary including scaffolding etc complete all as specified and as directed by Engineer-in-charge. Make:- Dr fixit /Berger / Perma
Material and labour for removal of loose and disintegrated concrete of RCC structual members viz slab, beam column,slabs ,chajjas and lintel etc by low impact hammer including removal of debris outside MD land cleaning the surface by high presure water jet or by air blast and exposed reinforcement bars with wire brush and apply two coats of anti-rust protective chemical at suitable intervals all as per manufactures instruction to resist further deterioration of re-inforcement bar including use and waste form and work providing welded wire mesh of size 50 x 50 mm of wire 3mm and using spray gun presure guniting in CM 1:3, 30mm thick finishing guniting surface in cement mortar 1:3, 10mm including using water proofing compound 2% by weight of cement and finishing even and smooth without using extra cement to match the existing surface and Unit rate quoted shall include for necessary scaffolding, trestles, ladders & cradles required for execution of the work and protective works and Necessary spreading and removing coverings to doors, windows, floors, fittings etc to protect them from splashes and cleaning of the doors/windows and floors after carrying out finishing guniting/painting shall be made by the contractor, complete all as specified and as directed by Engineer-in-charge.
Taking down cement plaster on brick or stone walls/ceilings, etc including racking out joints, hacking for key, scrubbing down with water etc complete all as specified and as directed by Engineer-in-charge.
Material and labour for rendering 10 mm thick in cement plaster 1:6 on fair faces of brick work or concrete surfaces finished even and smooth without using extra cement in patches n exc 3 sqm each patch complete all as specified and as directed by Engineer-in-charge.
Material and labour for rendering 5 mm thick in cement plaster 1:3 on concrete surfaces of ceiling finished even and smooth without using extra cement in patches n exc 3 sqm each patch complete all as specified and as directed by Engineer-in-charge.
Material and labour for rendering 15 mm thick in two coats, 10 mm thick in cement plaster 1:6 and 5 mm thick in cement plaster 1:4 mixed with integral water proofing compound as per manufacturers instructions, on fair faces of brick work or concrete surfaces finished even and smooth without using extra cement complete all as specified and as directed by Engineer-in-charge.
Supply only integral water proofing compound complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing newly plastered ceiling surfaces and applying three coats of white wash complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparing newly plasterd wall surfaces of walls and applying two coats of distemper oil emulsion over 3 mm thick wall care putty and a coat of primer using chalk whiting etc complete all as specified and as directed by Engineer-in-charge.
Material and labour for preparation of newly plastered surfaces of walls and applying 2 coats of apex ultima weather proof paint over a coat of apex ultima primer including preparation of surface and complete all as specified and as directed by Engineer-in-charge. Make : Apex from Asian Paints or equivalent in All Guard from Berger, Weather Shield Max Exterior Acrylic from ICI Dulux
Material and labour for preparing newly plasterd wall surfaces of walls and applying two coats of cement based paint over a coat of primer including preparation of newly plastured surfaces etc complete all as specified and as directed by Engineer-in-charge.
Cutting down plants/trees of girth n exc 15 cm from roof tops/sides of external walls of buildings, chajja, wall junctions, junctions of rain water/soil/waste vent pipes including taking out roots entered in wall/slab surfaces and making good the surfaces including reparing the CI/GI/PVC joints of affected locations by applying TUFALO (Herbal medicine) and making good to suit the adjointing surfaces using PCC type 1:2:4, type B-0 or cement mortar 1:2 with necessary scaffolding/staging etc upto any height, instructions as per manufacturer and complete all as specified and as directed by Engineer-in-charge. NOTE: Any CI/GI/PVC pipes and fittings damaged during work shall be replaced by new one to ensure leakage/seepage free joint without any extra cost to the department.
Demolition of concrete in ground floors (un re-inforced) and paving n.exc. 15 cm thickness (below or above ground level) and including removal of rubbish/ demolished materials out of MD land complete all as specified and as directed by Engineer-in-charge.
Material and labour for PCC 1 : 3 : 6 type C2, 75 mm thick ( by using 40mm graded stone aggregate) for plinth pretection finishing even and smooth without using extra cement complete all as specified and as directed by Engineer-in-charge.
Material and labour for obliterating old writing of any description, n exc 0.1 Sqm, with paint to match existing work complete all as specified and as directed by Engineer-in-charge. . Note for Sl item No 1 to 35 :- (i) Unit rate quoted shall include for necessary scaffolding, trestles, ladders & cradles required for execution of the work and protective works. (ii) Necessary spreading and removing coverings to doors, windows, floors, fittings etc to protect them from splashes and cleaning of the doors/windows and floors after carrying out painting shall be made by the contractor. (iii) Unit rate quoted shall be deemed to include for necessary shifting of tables, movable cupboards and other articles required for execution and placing in same position after completion of the work. (iv) Unit rate quoted shall also include for removing of nails, making good holes, cracks etc to match with the existing surfaces. (iv) The user unit will be handed over the qty of material contracted by the MES and same will be issued to the contractor for External periodical services by the user unit.
Krithi constructions
G RANGA RAO
KIRAN CONSTRUCTIONS
abhilasha constructions
GUTHIKONDA BROTHERS
C H P CONSTRUCTIONS
NAGESH CONSTRUCTIONS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .