Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.3 L+₹5,131.82 (2.32%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.3 L+₹9,481.30 (4.28%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹2.3 L+₹13,272.64 (5.99%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical Tender Documents and Affidavit can not submitted at the Duration time |
| Sl No | Description | Qty | Unit | Srinagatradres L2 | Sri Sastha Construction L3 | SRI ARULMURUGAN TRADERS BALU CONTRACTOR L4 | ESURESHCONTRACTOR L1 |
|---|---|---|---|---|---|---|---|
| 1.00Name of work : Providing pipe line from Pallanatham Existing Borewell to OHT H/O Mallapuram in Guziliamparai Block Estimate Rs.3.00 Lakhs | |||||||
| 2.00 | 63mm PVC pipe 4KSC | 798 | Rm | 27,930 ₹32,957.4 Lowest | 33,516 ₹39,548.88 | 33,516 ₹39,548.88 | 31,920 ₹37,665.6 |
| 3.00 | 63mm PVC MTA | 4 | Nos | 60 ₹70.8 Lowest | 72 ₹84.96 | 72 ₹84.96 | 68 ₹80.24 |
| 4.00 | 63mm PVC Bend | 6 | Nos | 120 ₹141.6 Lowest | 126 ₹148.68 | 132 ₹155.76 | 120 ₹141.6 Lowest |
| 5.00 | Solvent oil | 1 | Lit | 100 ₹118 Lowest | 196 ₹231.28 | 199 ₹234.82 | 187 ₹220.66 |
| 6.00Earth work excavation hard stiff clay and hard rock earth soils including all cost and conveyance of all materials and all labour charges etc complete | |||||||
| 7.00 | Pipe line | 798 | Rm | 1,47,630 ₹1,74,203.4 | 1,46,832 ₹1,73,261.76 | 1,49,226 ₹1,76,086.68 | 1,40,448 ₹1,65,728.64 Lowest |
| 8.00 | Labour charges for Laying and lowering the PVC Pipe and specials including all cost and conveyance of all materials and all labour charges etc complete | 798 | Rm | 15,960 ₹18,832.8 | 14,364 ₹16,949.52 Lowest | 15,162 ₹17,891.16 | 14,364 ₹16,949.52 Lowest |
| 9.00 | Towards the cost of Name board charges | 1 | nos | 400 ₹472 Lowest | 780 ₹920.4 | 792 ₹934.56 | 744 ₹877.92 |
Tender Value
Refer Docs
EMD Value
₹3,001
Closing Date
22 Sept 2026, 3:00 pmClosed
Block Development officer ( VP )
Panchayat Union , Guziliamparai
Guziliamparai Block Mines and Menerals 2024 - 25 TN05012
2026_RDTN_699266_1
1645/2026/A3
Open Tender
Civil Works
Item Wise
Panchayat Union, Guziliamparai
Guziliamparai Block Mines and Menerals 2024 - 25 TN05012
3 documents required · 3 mandatory
₹0
₹3,001
Yes
25 Sept 2026
29 Aug 2026
22 Sept 2026
29 Aug 2026
22 Sept 2026
29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Name of work : Providing pipe line from Pallanatham Existing Borewell to OHT H/O Mallapuram in Guziliamparai Block
Estimate Rs.3.00 Lakhs | - | - | - | - | - |
| 2 | 63mm PVC pipe 4KSC | 798 | Rm | 65 | ₹51,870 | 18% |
| 3 | 63mm PVC MTA | 4 | Nos | 65 | ₹260 | 18% |
| 4 | 63mm PVC Bend | 6 | Nos | 65 | ₹390 | 18% |
| 5 | Solvent oil | 1 | Lit | 65 | ₹65 | 18% |
| 6 | Earth work excavation hard stiff clay and hard rock earth soils including all cost and conveyance of all materials and all labour charges etc complete | - | - | - | - | - |
| 7 | Pipe line | 798 | Rm | 65 | ₹51,870 | 18% |
| 8 | Labour charges for Laying and lowering the PVC Pipe and specials including all cost and conveyance of all materials and all labour charges etc complete | 798 | Rm | 65 | ₹51,870 | 18% |
| 9 | Towards the cost of Name board charges | 1 | nos | 65 | ₹65 | 18% |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.61 MB
BOQ_840618.xls
BOQ • 0.40 MB
MM2425.pdf
PDF • 0.27 MB
PRICEBID12.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .