Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹177 CrAdmitted-Finance 9 PPCL COLONY UDAY VIHAR HARIDWAR BYPASS DEHRADUN UTTARAKHAND | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹177 Cr | L1 | Admitted-Finance |
| 2 | L2₹179.1 CrAdmitted-Finance | ₹179.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹184.1 CrAdmitted-Finance | ₹184.1 Cr | L3 | Admitted-Finance |
| 4 | L4₹187.0 CrAdmitted-Finance | ₹187.0 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical NIRAJ HOUSE SUNDER BAUG NEAR DEONAR BUS DEPOT CHEMBUR MUMBAI MAHARASHTRA 440 088 | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | RITHWIK PROJECTS PRIVATE LIMITED L4 | KMC Constructions Limited L3 | SRK Constructions and Projects Private Limited., L2 | Bharat Constructions (India) Pvt. Ltd. L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II) | 1 | Lumpsum | 1,86,99,29,999 ₹187.0 Cr | 1,84,12,56,000 ₹184.1 Cr | 1,79,11,36,218 ₹179.1 Cr | 1,77,00,00,000 ₹177 Cr |
Tender Value
₹191.2 Cr
Closing Date
4 Sept 2020, 11:00 amClosed
AK Jha
National Highways Infrastructure Development Corporation Ltd 3rd floor, PTI Building, 4-Parliament Street, New Delhi
Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39(New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 in Nagaland Under SARDP-NE on EPC Mode (Package II)
2020_NHIDC_576188_1
NHIDCL/Nagaland/ CivilWork/KohimaBypass/PKG-2
Open Tender
Civil Works
730 days
Nagaland
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
24 Sept 2020
7 Aug 2020
7 Sept 2020
7 Aug 2020
4 Sept 2020
21 Aug 2020
7 Aug 2020 - 21 Aug 2020
24 Aug 2020
Amount
Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II)
SRK Constructions and Projects Private Limited.,
KMC Constructions Limited
RITHWIK PROJECTS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
TCSandBridgeGADwithTunnel.pdf
Tender Documents • 3.11 MB
MainReport.pdf
Tender Documents • 8.21 MB
DCA.pdf
Tender Documents • 1.81 MB
PlanAndProfile.pdf
Tender Documents • 4.78 MB
RFP.pdf
Tender Documents • 2.37 MB
BOQ_604958.xls
BOQ • 0.23 MB
Schedule.pdf
Tender Documents • 2.65 MB
Download all tender documents and submit your bid