Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹177 CrAdmitted-Finance 9 PPCL COLONY UDAY VIHAR HARIDWAR BYPASS DEHRADUN UTTARAKHAND | DEHRADUN | DEHRADUN | UTTARAKHAND | L1 | Admitted-Finance | |
| 2 | L2₹179.1 Cr+₹2.1 Cr (1.19%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹184.1 Cr+₹7.1 Cr (4.03%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹187.0 Cr+₹10.0 Cr (5.65%)Admitted-Finance PLOT NO 37 39 NAVODAYA COLONY ROAD NO 2 BANJARA HILLS HYDERABAD TELANGANA 500034 | HYDERABAD | TELANGANA | 500034 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical NIRAJ HOUSE SUNDER BAUG NEAR DEONAR BUS DEPOT CHEMBUR MUMBAI MAHARASHTRA 440 088 | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | RITHWIK PROJECTS PRIVATE LIMITED L4 | KMC Constructions Limited L3 | SRK Constructions and Projects Private Limited., L2 | Bharat Constructions (India) Pvt. Ltd. L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II) | 1 | Lumpsum | 1,86,99,29,999 ₹1,86,99,29,999 | 1,84,12,56,000 ₹1,84,12,56,000 | 1,79,11,36,218 ₹1,79,11,36,218 | 1,77,00,00,000 ₹1,77,00,00,000 Lowest |
Tender Value
₹191.2 Cr
Closing Date
4 Sept 2020, 11:00 amClosed
AK Jha
National Highways Infrastructure Development Corporation Ltd 3rd floor, PTI Building, 4-Parliament Street, New Delhi
Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39(New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 in Nagaland Under SARDP-NE on EPC Mode (Package II)
2020_NHIDC_576188_1
NHIDCL/Nagaland/ CivilWork/KohimaBypass/PKG-2
Open Tender
Civil Works
EPC Contract
730 days
Nagaland
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
24 Sept 2020
7 Aug 2020
7 Sept 2020
7 Aug 2020
4 Sept 2020
21 Aug 2020
7 Aug 2020 - 21 Aug 2020
24 Aug 2020
Amount
Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II)
SRK Constructions and Projects Private Limited.,
KMC Constructions Limited
RITHWIK PROJECTS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
TCSandBridgeGADwithTunnel.pdf
Tender Documents • 3.11 MB
MainReport.pdf
Tender Documents • 8.21 MB
DCA.pdf
Tender Documents • 1.81 MB
PlanAndProfile.pdf
Tender Documents • 4.78 MB
RFP.pdf
Tender Documents • 2.37 MB
BOQ_604958.xls
BOQ • 0.23 MB
Schedule.pdf
Tender Documents • 2.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .