Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
5 Sept 2026, 3:30 pm
EXECUTIVE ENGINEER (RnB) DIVISION SOURA.
EXECUTIVE ENGINEER (RnB) DIVISION SOURA.
Construction of Pre fab structure at new transport yard at SKIMS, Soura.
2026_PWDJK_321735_1
e-Tender NIT-12 of 2026-27 dt.21-08-2026
Open Tender
Civil Works
Percentage
120 days
SKIMS, Soura.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,800
EXECUTIVE ENGINEER (RnB) DIVISION SOURA.
₹2.1 L
Yes
EXECUTIVE ENGINEER (RnB) DIVISION SOURA.
22 Aug 2026
22 Aug 2026
7 Sept 2026
22 Aug 2026
5 Sept 2026
22 Aug 2026
22 Aug 2026 - 5 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL PART | - | - | - | - |
| 2 | Earth work in bulk excavation by Manual / mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. all kinds of soil | 222.45 | cum | 256.85 | ₹57,136.28 |
| 3 | Providing and laying stone soling in the excavated trenches duly hand packed on level including ramming with iron hand rammers including loading, unloading carriage T&P complete | 26.3 | cum | 1,000 | ₹26,300 |
| 4 | P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to plinth level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) all inclusive leads, lifts, loading, un-loading,cost and carriage of material involved | 17.35 | cum | 5,202.9 | ₹90,270.32 |
| 5 | P/L, in position reinforced cement concrete of specified grade excluding the cost of centering & shuttering. in 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate of 20 mm Nominal size Crushed upto plinth level- level | 67.56 | cum | 7,788.4 | ₹5,26,184.3 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 4.4.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 49.5 | cum | 6,591.25 | ₹3,26,266.88 |
| 7 | Centering & shuttering including strutting , propping etc. and removal of same: in walls any thickness foundation , footings bases etc | 262.1 | Sqm | 286.35 | ₹75,052.34 |
| 8 | Reinforcement for R.C.C work incld straightening, cutting, bending, placing in position and binding all complete:- (Thermo Mechanically Treated Bars.).sill level & lintel strip, f-beam Room, f-beam V,plinthband | 7,220 | kgs | 123.2 | ₹8,89,504 |
| 9 | Supply & Filling of GSB / khak bajri Under floor | 116.92 | cum | 1,000 | ₹1,16,920 |
| 10 | Filling available Earth under Foundation Sides | 53.84 | cum | 218.4 | ₹11,758.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_1075511.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].