Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.8 L+₹3,836.89 (0.18%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Ramanujam Vengatesan L2 | ANNAIYAMMAL GUNASEKARAN L1 |
|---|---|---|---|---|---|
| 1.00Construction of CC road at Extension NJV nagar road Vadakkuthu panchayat | |||||
| 2.00 | Earthwork excavation in all classes of soils except hadr rock in hard ORDINARY SOIL with initial lead and lift including all other labour charges etc. Complete as per SS 20 B. | 36 | Cum | 135 ₹4,860 | 131 ₹4,716 Lowest |
| 3.00 | Supply and Filling with sand from approved Quarry including all other labour charges etc. Complete | 107.7 | Cum | 2,110 ₹2,27,247 | 2,108 ₹2,27,031.6 Lowest |
| 4.00 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors . complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | 345 | Sqm | 255 ₹87,975 | 250 ₹86,250 Lowest |
| 5.00 | Cement Concrete 1:3:6 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 34.5 | Cum | 6,620 ₹2,28,390 | 6,616 ₹2,28,252 Lowest |
| 6.00 | Cement Concrete 1:4:8 ( One Cement Four sand and Eight Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 116.7 | Cum | 5,865 ₹6,84,445.5 | 5,860 ₹6,83,862 Lowest |
| 7.00 | Wearing coat Cement Concrete 1:2:4 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 84.38 | Cum | 7,170 ₹6,05,004.6 | 7,165 ₹6,04,582.7 Lowest |
| 8.00 | Provision for Tarpad | 21.09 | Sqm | 235 ₹4,956.15 | 234 ₹4,935.06 Lowest |
| 9.00 | Provision for Name Board Charges | 1 | No | 4,205 ₹4,205 | 4,202 ₹4,202 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} | 1 | GST Amount | 3,32,475 ₹3,32,475 | 3,31,890 ₹3,31,890 Lowest |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
31 Oct 2025, 3:00 pmClosed
BDO
Panchayat union kurinjipadi
Providing CC road at extension NJV Nagar road in Vadakuthu panchayat
2025_RDTN_617115_14
A8/2276/2025/DMFT
Open Tender
Civil Works - Roads
Item Rate
180 days
kurinjipadi
As per tender
3 documents required · 3 mandatory
₹0
₹22,000
18 Jan 2026
25 Oct 2025
31 Oct 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
Amount
Construction of CC road at Extension NJV nagar road Vadakkuthu panchayat
Earthwork excavation in all classes of soils except hadr rock in hard ORDINARY SOIL with initial lead and lift including all other labour charges etc. Complete as per SS 20 B.
Supply and Filling with sand from approved Quarry including all other labour charges etc. Complete
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors . complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Cement Concrete 1:3:6 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Cement Concrete 1:4:8 ( One Cement Four sand and Eight Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Wearing coat Cement Concrete 1:2:4 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Provision for Tarpad
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Ramanujam Vengatesan (BID ID -1499712)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
NJvnagarpdf.pdf
Tender Documents • 0.09 MB
BOQ_737835.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .