| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37,493.07Accepted-AOC | ₹37,493.07 | L1 | Accepted-AOC accept |
| 2 | L2₹37,535.37Rejected-Finance NULL | ₹37,535.37 | L2 | Rejected-Finance high rate |
| Sl No | Description | Qty | Unit | Balaji L2 | ARUMUGAM . K L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel, hard rock not requiring blasting ete complete., | 1.18 | M3 | 264 ₹311.52 | 263 ₹310.34 |
| 2.00 | Dismantling Floor finish & dadooing walls in cement mortar with
Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 6 | M2 | 66 ₹396 | 65 ₹390 |
| 3.00 | Cement concrete 1:4:8 mix (One cement four M sand and eight aggregate) using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges including mixing, laying consolidating and curing etc., complete as per standard specification - 10m³ | 0.32 | M3 | 5,613 ₹1,796.16 | 5,612 ₹1,795.84 |
| 4.00 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 2 | M2 | 581 ₹1,162 | 580 ₹1,160 |
| 5.00 | Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement | 2.4 | M2 | 1,085 ₹2,601.29 | 1,084 ₹2,598.89 |
| 6.00 | Dadooing of walls with colour glazed tiles of size 300x200x6 mm finished thickness with c.m 1:2- and polished with same color cement including all cost and convene of all materials etc.,complete | 12.6 | M2 | 1,563 ₹19,693.80 | 1,562 ₹19,681.20 |
| 7.00 | Supplying and fixing in position Indian water closet of size 580 X 440mm, white glazed earthen ware of approved quality with 'P' trap or 'S' trap confirming to IS:2556 - Part XII with sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5 ( one part of lime, two parts of sand and five parts of brick jelly) 100mm thick and finishing the top to required slope and including giving necessary connection to cast iron soil pipes/ PVC pipes by dismandling brick masonry, reinforced cement concrete roof/floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specifications and as directed by the departmental officers. | 1 | No | 5,938 ₹5,938 | 5,937 ₹5,937 |
| 8.00 | Painting two coats ready mixed Approved Exteriar Emulsion of first quality and of approved colour over a primingcoat including through scarbing clan removel ofone coat of priming with best Cement paint as directed by the department officers etc complete and including necessary plaster of paris whever regd.(S.l.No.358) -10sqm | 10 | M2 | 264 ₹2,640 | 263 ₹2,630 |
| 9.00 | Supply and fixing of RCC 1:2:4 Mix reday made Ring of 50mm thick x 0.90m dia including cost of steel rinforcement including cost and conveyance of all materials to site | 3 | No | 801 ₹2,403 | 799 ₹2,397 |
| 10.00 | Supply and fixing of RCC 1:2:4 Mix reday made Circular Precast slab of 75mm thick x 1.00m dia including cost of steel rinforcement including cost and conveyance of all materials to site | 0.8 | M2 | 742 ₹593.60 | 741 ₹592.80 |
Tender Value
₹45,000
Closing Date
5 Dec 2025, 3:00 pmClosed
Executive Officer, Nambiyur Town Panchayat
Executive Officer, Nambiyur Town Panchayat 372, Gobi main road, Nambiyur
Renovation of Anganwadi center Toilet at Ward No.14 Vellalapalayam in Nambiyur town panchyat
2025_DTP_628029_1
484/2025
Open Tender
Civil Works
Nambiyur Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
12 Mar 2026
2 Dec 2025
5 Dec 2025
2 Dec 2025
5 Dec 2025
2 Dec 2025
Amount
Earth work excavation for foundation in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel, hard rock not requiring blasting ete complete.,
Dismantling Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Cement concrete 1:4:8 mix (One cement four M sand and eight aggregate) using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges including mixing, laying consolidating and curing etc., complete as per standard specification - 10m³
Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309)
Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement
Dadooing of walls with colour glazed tiles of size 300x200x6 mm finished thickness with c.m 1:2- and polished with same color cement including all cost and convene of all materials etc.,complete
Supplying and fixing in position Indian water closet of size 580 X 440mm, white glazed earthen ware of approved quality with 'P' trap or 'S' trap confirming to IS:2556 - Part XII with sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5 ( one part of lime, two parts of sand and five parts of brick jelly) 100mm thick and finishing the top to required slope and including giving necessary connection to cast iron soil pipes/ PVC pipes by dismandling brick masonry, reinforced cement concrete roof/floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats ready mixed Approved Exteriar Emulsion of first quality and of approved colour over a primingcoat including through scarbing clan removel ofone coat of priming with best Cement paint as directed by the department officers etc complete and including necessary plaster of paris whever regd.(S.l.No.358) -10sqm
Supply and fixing of RCC 1:2:4 Mix reday made Ring of 50mm thick x 0.90m dia including cost of steel rinforcement including cost and conveyance of all materials to site
Supply and fixing of RCC 1:2:4 Mix reday made Circular Precast slab of 75mm thick x 1.00m dia including cost of steel rinforcement including cost and conveyance of all materials to site
Balaji (BID ID -1527371)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_750832.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid