Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.2 LAdmitted-Finance | -0.50% | ₹9.2 L | L1 | Admitted-Finance |
| 2 | L2₹9.2 LAdmitted-Finance | -0.25% | ₹9.2 L | L2 | Admitted-Finance |
Tender Value
₹11.0 L
EMD Value
₹23,000
Closing Date
2 May 2026, 12:00 pmClosed
EE RED ,Vikas Bhawan, Sultanpur
EE RED ,Vikas Bhawan, Sultanpur
Under District Sultanpur, Construction of boundary wall and gate at Saraswati Shishu Mandir Primary Upper Primary School, Banmai, Khanda Kurebhar., Lot No 14
2026_REDUP_1142338_14
3540/EE RED Sultanpur/25-26 Dt 20/03/2026
Open Tender
Civil Works
120 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹23,000
EE RED ,Vikas Bhawan, Sultanpur
15 May 2026
27 Apr 2026
2 May 2026
27 Apr 2026
2 May 2026
27 Apr 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
E/W in Excavation in foundations in ordinary soil including dressing of sides and rammings of bottom. | 1 | Cum. | 185.46 | ₹185.27 | |
Providing and laying PCC 1:5:10 (1 cement : 5 fine sand : 10 Stone ballast 40 mm. nominal size) in foundation i/c supply of all materials. Labour and T&P etc. | - | Cum. | 4,644.35 | - | |
R.C.C. work in Foundation with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:1 1/2:3 i/c supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also i/c supply of all materials, labour and T & P etc. SI No. 284 b | - | Cum. | 6,444.88 | - | |
Providing and laying RCC 1:1 1/2:3 (1 cement : 1 1/2 C. sand :3 Stone grit 20 mm. size) in Plinth bend, Top bend i/c supply of all materials. Labour and T&P etc.SI No. 285 b | 1 | Cum. | 8,197.39 | ₹8,189.19 | |
Providing and laying RCC 1:1 1/2:3 (1 cement : 1 1/2 C. sand : 3 Stone grit 20 mm. size) in Column i/c supply of all materials. Labour and T&P etc. SI No. 289 | 1 | Cum. | 8,197.39 | ₹8,189.19 | |
Centering and Shuttering i/c strutting, propping etc. and removal of form work for Foundation, Columns, Slab etc. | 0.6 | Sqm. | 524.67 | ₹314.28 | |
Mild steel or iron in plain work such as reinforced concrete work i/c cutting , bending. SI No. 504 | 1 | Qtl. | 7,684.06 | ₹7,676.38 | |
Class-150 brick work in 1 : 4 cement and C. sand mortar in the super-structure One brick thick wall i/c supply of all materials, labour and T & P etc. required for proper completion of the work. SI No.303, 309, 310 | - | Cum. | 6,657.63 | - | |
12mm. Thick plaster with 1:6 cement and fine sand mortar including supply of all materials, labour and T&P etc. required for proper completion of the work. SI N. 586 | 1 | Sqm. | 237.5 | ₹237.26 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.86 MB
Tendernotice_2.pdf
PDF • 4.42 MB
BOQ_2133517.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid