| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAccepted-Finance | ₹16.4 L | L1 | Accepted-Finance lowest amount quoted |
| 2 | L2₹17.5 L+₹1.1 L (6.81%)Accepted-Finance SF NO 253 254 VIGNESHWARA NAGAR THOTTIPALAYAM TIRUPUR | TIRUCHIRAPPALLI | TAMIL NADU | 620001 | ₹17.5 L+₹1.1 L (6.81%) | L2 | Accepted-Finance highest amount quoted |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Experience certificate is incorrect |
| Sl No | Description | Qty | Unit | K.Nagarajan L1 | Santhoshkumar L2 |
|---|---|---|---|---|---|
| 1.001.Construction of overhead water tank(OHT) with a capacity of 30000 lit @ Senthamangalam in Visallur Panchayat sembanarkoil Block | |||||
| 2.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart(First depth of 2m) | 62.34 | M3 | 243.65 ₹15,189.14 Lowest | 250 ₹15,585 |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers. | 3.53 | M3 | 2,340 ₹8,260.2 | 2,270 ₹8,013.1 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers. | 3.53 | M3 | 5,470 ₹19,309.1 Lowest | 5,978 ₹21,102.34 |
| 5.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||
| 6.00 | For items 1.5m to 4.5m below GL | 12.45 | M3 | 9,987 ₹1,24,338.15 Lowest | 10,200 ₹1,26,990 |
| 7.00 | For items 0 to 1.20m below GL | 1.8 | M3 | 9,987 ₹17,976.6 Lowest | 10,100 ₹18,180 |
| 8.00 | For items 0m to 4.5m above GL | 2.83 | M3 | 10,060 ₹28,469.8 Lowest | 10,100 ₹28,583 |
| 9.00 | For items 4.51m to 7.30 m above | 2.23 | M3 | 10,130 ₹22,589.9 | 10,100 ₹22,523 Lowest |
| 10.00 | For items above 7.32 m & up to 10.98 m from GL | 2.78 | M3 | 10,210 ₹28,383.8 | 10,100 ₹28,078 Lowest |
Tender Value
₹18.1 L
EMD Value
₹18,100
Closing Date
23 Feb 2026, 3:00 pmClosed
Block Development Officer SEMBANARKOIL
Block Development Office SEMBANARKOIL
Construction of a new overhead water tank with a capacity of 30,000 liters at Senthamangalam Street, Visalur Panchayat.
2026_RDTN_663112_1
770/2024/A2 Dt .02.2026
Open Tender
Civil Works
Item Rate
180 days
sembanarkoil
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹18,100
Yes
Block Development Office SEMBANARKOIL
5 May 2026
21 Feb 2026
23 Feb 2026
21 Feb 2026
23 Feb 2026
21 Feb 2026
21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of overhead water tank(OHT) with a capacity of 30000 lit @ Senthamangalam in Visallur Panchayat sembanarkoil Block | - | - | - | - |
| 2 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart(First depth of 2m) | 62.34 | M3 | - | - |
| 3 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers. | 3.53 | M3 | - | - |
| 4 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers. | 3.53 | M3 | - | - |
| 5 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | - | - | - | - |
| 6 | For items 1.5m to 4.5m below GL | 12.45 | M3 | - | - |
| 7 | For items 0 to 1.20m below GL | 1.8 | M3 | - | - |
| 8 | For items 0m to 4.5m above GL | 2.83 | M3 | - | - |
| 9 | For items 4.51m to 7.30 m above | 2.23 | M3 | - | - |
| 10 | For items above 7.32 m & up to 10.98 m from GL | 2.78 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
tb.pdf
Tender Documents • 1.21 MB
pb.pdf
Tender Documents • 0.44 MB
BOQ_796082.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .