Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹25.7 L+₹5.7 L (28.7%)Rejected-Finance | L2 | Rejected-Finance Quoted high rate as compare to L1 bidder | |
| 3 | Rejected-Technical 0 TRESPONE KARGIL JAMMU KASHMIR 194105 | KARGIL | LADAKH | 194105 | - | Rejected-Technical cost of document wrongly uploaded |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
7 Nov 2020, 2:00 pmClosed
Executive Engineer
Rural Engineering Wing Leh
Improvement of link road from tokpo main internal road at Chuchot
2020_RDD_1307_3
NIT 128 UTLeh REW of 2020-21
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer
₹40,000
Yes
14 Jan 2021
3 Nov 2020
10 Nov 2020
3 Nov 2020
7 Nov 2020
3 Nov 2020
Amount
Removing mortar from stones and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured) In cement mortar
Earth work in excavati..;n by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil
Providing and laying dry stone soiling in horizontal level including the cost of stone
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Centring and shuttering including strutting~ propping etc and removal of form work for.- Columns, piers, abutments, pillars, posts and struts.
Centring and shuttering including strutting~ propping etc and removal of form work for Suspended floors, roofs, landings, balconies and access platform
Centring and shuttering including strutting~ propping etc and removal of form work fo Edges of slabs and breaks in floors and walls. Above 20cms wide
Carriage of sand and course aggregate for average lead upto 15 Km by mechanical transport.
Carriage of Cement and steel for average lead upto 20 Km by mechanical transport.
M/S SAJJAD HUSSAIN GOVT CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .