| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.6 L+₹24,422 (5.60%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SASI BUILDERS L1 | K GANESAN L2 |
|---|---|---|---|---|---|
| 1.01 | Dismantling the existing Reinforced cement concrete surface etc,Twad 23-24-page-323) | 3.5 | M3 | 3,913.1 ₹13,695.85 Lowest | 4,132.2 ₹14,462.7 |
| 2.01 | Dismantling the existing Brick /Stone masonry in Cement mortar walls under 3 m high,,(Twad 23-24-page-323) | 6.5 | M3 | 257.1 ₹1,671.15 Lowest | 271.5 ₹1,764.75 |
| 3.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-18-SL No:1 | 14 | M3 | 205.4 ₹2,875.6 Lowest | 216.9 ₹3,036.6 |
| 4.01 | Supplying and filling in foundation and basement with Quarry Dust in layers of 15Cm. thick well rammed and consolidated including watering complying with standard specification etc. complete MDU-CORP-BUILDING DATA-P-19-SL No:4 | 2 | M3 | 418.5 ₹837 Lowest | 441.9 ₹883.8 |
| 5.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDU-CORP-BUILDING DATA-P-21-SL No:10 | 5 | M3 | 5,260 ₹26,300 Lowest | 5,554.6 ₹27,773 |
| 6.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) MDU-CORP-BUILDING DATA-P-24-SL No:14 | 114 | M2 | 919.7 ₹1,04,845.8 Lowest | 971.2 ₹1,10,716.8 |
| 7.01 | Plain Cement Concrete 1:2:4 (One Cement Two sand and Four aggregates) using 20mm gauge hard broken granite jelly for foundation including watering and consolidation for foundation wher over neceray etc complete. | 21 | M3 | 6,691.2 ₹1,40,515.2 Lowest | 7,065.9 ₹1,48,383.9 |
| 8.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only MDU-CORP-BUILDING DATA-P-24-SL No:14 | 13 | M2 | 1,019.8 ₹13,257.4 Lowest | 1,076.9 ₹13,999.7 |
| 9.01 | Reinforced Cement Concrete 1:1 1/2:3 (One Cement One and Half sand and Three aggregates) Using 20mm Gague hard broken granite jelly for foundation including consolidatiobn and dewatering for foundation wherever necessary etc., | 4 | M3 | 8,973.7 ₹35,894.8 Lowest | 9,476.2 ₹37,904.8 |
| 10.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia MDU-CORP-BUILDING DATA-P-32-SL No:22 | 270 | Kg | 91.8 ₹24,786 Lowest | 96.9 ₹26,163 |
Tender Value
₹4.4 L
EMD Value
₹4,368
Closing Date
27 Feb 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Construction of damaged road cross culvert at moondrumadi colony APK main road in ward 84
2025_MAWS_524913_1
E2 / EST 438 / 24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,368
14 Oct 2025
15 Feb 2025
27 Feb 2025
15 Feb 2025
27 Feb 2025
15 Feb 2025
Amount
Dismantling the existing Reinforced cement concrete surface etc,Twad 23-24-page-323)
Dismantling the existing Brick /Stone masonry in Cement mortar walls under 3 m high,,(Twad 23-24-page-323)
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-18-SL No:1
Supplying and filling in foundation and basement with Quarry Dust in layers of 15Cm. thick well rammed and consolidated including watering complying with standard specification etc. complete MDU-CORP-BUILDING DATA-P-19-SL No:4
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDU-CORP-BUILDING DATA-P-21-SL No:10
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) MDU-CORP-BUILDING DATA-P-24-SL No:14
Plain Cement Concrete 1:2:4 (One Cement Two sand and Four aggregates) using 20mm gauge hard broken granite jelly for foundation including watering and consolidation for foundation wher over neceray etc complete.
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only MDU-CORP-BUILDING DATA-P-24-SL No:14
Reinforced Cement Concrete 1:1 1/2:3 (One Cement One and Half sand and Three aggregates) Using 20mm Gague hard broken granite jelly for foundation including consolidatiobn and dewatering for foundation wherever necessary etc.,
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia MDU-CORP-BUILDING DATA-P-32-SL No:22
Plastering with C.M.1:3 (one cement and three sand) using 20mm thick,
Add GST 18%
K GANESAN (BID ID -1259679)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .