Tender Value
₹4.1 L
EMD Value
₹12,384
Closing Date
15 Oct 2026, 3:00 pm
CE
CE Office GNN
Construction of RCC drain in Ganga Lane, Ward 89, Vaishali Sector 5.
2026_DOLBU_1191134_102
132/Nirman/2026-27 Dated 18-09-2026 (601-700)
Open Tender
Civil Works
Percentage
Ghaziabad
.
2 documents required · 2 mandatory
₹1,416
₹12,384
30 Sept 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. DSR 2023 ITEM N. 15.2.2 | 4.5 | cum | 1,340 | ₹6,030 |
| 2 | Dismantling of brick work or stone work in lime cement mortar and including stacking of meterial as directed be the Engineer-in-charge within a distance of 60 metre tiles including all comp. the work PWD SOR 2022 17.2.2 | 7.56 | cum | 600 | ₹4,536 |
| 3 | Deduct the cost of old bricks | 1,739 | nos | -6 | - |
| 4 | Ded the cost of old bricks/batts | 3.78 | cum | -800 | - |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator ) manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan ) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m , as directed by engineer - incharge . all kinds of soil DSR 2023 .2.6.1 | 50.42 | cum | 110 | ₹5,546.09 |
| 6 | Desposal of refused material/malwa distance up to 8 KM etc all complete as the diraction of Engineer-in-charge. (As per PWD SOR 2020/231(a). | 41.18 | cum | 195.1 | ₹8,034.8 |
| 7 | S/L PCC in 1:6:12 cement fine sand and 40mm brick ballest etc all comp. | 16.2 | cum | 4,000 | ₹64,800 |
| 8 | Reinforced cement concrete work in beams, suspended flooors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases above plinth level up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 Cement :1.5 coarse sand including manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 20% :3 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) upto 20%) DSR 2023 ITEM.N.5.3A | 20.4 | cum | 8,640 | ₹1,76,256 |
| 9 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars DSR 2023 ITEM N.5.22.1 | 12.01 | Qtl | 8,166 | ₹98,073.66 |
| 10 | GST | 18 | Percentage | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.10 MB
BOQ_2246747.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .