| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance 118 NABA MAHJATI ROAD KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | L1 | Admitted-Finance | ||
| 2 | L2₹2.8 L+₹7,853 (2.90%)Admitted-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | L2 | Admitted-Finance | ||
| 3 | L3₹2.8 L+₹13,215 (4.88%)Admitted-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L3 | Admitted-Finance |
Tender Value
₹2.7 L
EMD Value
₹6,000
Closing Date
14 Sept 2026, 1:00 pmClosed
E.E. (C)/BR-I
KOLKATA
PAINTING AND REPAIRING OF MEDIAN STRIPS ALONGGIRISH AVENUE AND K.V.V. AVENUE IN WARD 7 AND 8
2026_KMC_1039982_1
KMC/EEC/I/008/11/2026-2027
Open Tender
CIVIL WORKS
Percentage
21 days
KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
28 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 65.41 | SQUARE METER | 19 | ₹1,242.79 |
| 2 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | 65.41 | SQUARE METER | 186 | ₹12,166.26 |
| 3 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(6)(b) Washing & cleaning the wall surface & ceiling by soft detergent powder & soft water & render the surface free of dust, stain etc. | 1,899.75 | SQUARE METER | 8 | ₹15,198 |
| 4 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: (b) Two Coats [This item to be done under specific instruction of the Superintending Engineer]N.B.:-Extra for each additional floor in external walls refer item 1 of subhead C | 1,899.75 | PER 100 SQUARE METERS. | 45.1 | ₹85,678.73 |
| 5 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : With super gloss (hi-gloss) - (i) One coat (white in shade) | 949.88 | SQUARE METER | 52 | ₹49,393.5 |
| 6 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :With super gloss (hi-gloss) -(iii) One coat (with any shade except white) | 949.88 | SQUARE METER | 54 | ₹51,293.25 |
| 7 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 50 | EACH | 245 | ₹12,250 |
| 131 | Estimated amount | - | - | - | - |
| 132 | Add: 9%SGST | 1 | LS | 13,091.41 | ₹13,091.41 |
| 133 | Add: 9%CGST | 1 | LS | 13,091.41 | ₹13,091.41 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
TF.pdf
Tender Documents • 0.66 MB
SOQ1.pdf
Additional Documents • 0.81 MB
BOQ_2553934.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .