| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-Finance | ₹19.7 L | L1 | Accepted-Finance Lowest rate |
| Sl No | Description | Qty | Unit | RMITHA POWER AND INFRA (OPC) PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00 | Excavation of pole pit upto 27"(8.0 m) Poleby using JCB/ Manual | 50 | Each pit | 450 ₹22,500 |
| 2.00 | Excavation of Stay pit 4.5' to 5' depth by using JCB/ Manual | 20 | Each pit | 450 ₹9,000 |
| 3.00 | Excavation of pole pit Above 8 Mtr Pole PSC/RCC/RSJ pole by using JCB/ Manual | 20 | Each pit | 550 ₹11,000 |
| 4.00 | Excavation of Hard rock without blasting(where houses are located) | 5 | Each Pit | 1,500 ₹7,500 |
| 5.00 | Erection of PSC/RCC Poles/Metal Poles upto 8.00m.(27')by using crane/Manual | 50 | Each pole | 550 ₹27,500 |
| 6.00 | Erection of PSC/RCC Poles/Metal Poles Above 8.00m by using crane/Manual | 15 | Each pole | 650 ₹9,750 |
| 7.00 | Erection of Metal Supports above 9.00m/RSJ/Rail Pole/Febricated Poles/Tubula Pole by using crane/ Manual | 5 | Each pole | 650 ₹3,250 |
| 8.00 | Dismantling of PSC/RCC Poles/Metal Poles upto 8.00mts with Excavation | 10 | Each pole | 500 ₹5,000 |
| 9.00 | Dismantling of PSC/RCC Poles/Metal Poles Above 8.00mts with Excavation | 5 | Each pole | 600 ₹3,000 |
| 10.00 | Erection of stay set complete | 20 | Each Stay | 240 ₹4,800 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
5 Jan 2026, 2:30 pmClosed
SE/SEDC/Udayapatty/Salem
O/o The SE/SEDC/SALEM
Specification for Works Contract for Execution of extension, Improvement, DCW and various works in various locations in respect of Town Salem Division.
2025_EB_635523_1
SE/SEDC/WC37/25-26dt19.12.25
Open Tender
Electrical and Maintenance Works
365 days
Town
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
6 Mar 2026
23 Dec 2025
6 Jan 2026
23 Dec 2025
5 Jan 2026
24 Dec 2025
Excavation of pole pit upto 27"(8.0 m) Poleby using JCB/ Manual
Excavation of Stay pit 4.5' to 5' depth by using JCB/ Manual
Excavation of pole pit Above 8 Mtr Pole PSC/RCC/RSJ pole by using JCB/ Manual
Excavation of Hard rock without blasting(where houses are located)
Erection of PSC/RCC Poles/Metal Poles upto 8.00m.(27')by using crane/Manual
Erection of PSC/RCC Poles/Metal Poles Above 8.00m by using crane/Manual
Erection of Metal Supports above 9.00m/RSJ/Rail Pole/Febricated Poles/Tubula Pole by using crane/ Manual
Dismantling of PSC/RCC Poles/Metal Poles upto 8.00mts with Excavation
Dismantling of PSC/RCC Poles/Metal Poles Above 8.00mts with Excavation
Erection of stay set complete
Dismantling of stay set complete with Excavation
Erection of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 3 1/2
Dismantling of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 3 1/2
Erection of Guarding Cross arm,Tapping Channel cross arm & Double Channel X arm
Dismantling of Guarding Cross arm,Tapping Channel cross arm & Double Channel X arm
Erection of LT 3 phase cross arms angle and channel
Dismantling of LT 3 phase cross arms angle and channel
Erection of LT Single phase cross arms angle and channel
Dismantling of LT Single phase cross arms angle and channel
Erection of HT/LT TI Fittings
Dismantling of HT/LT TI Fittings
Fixing of HT pin Insulators (22KV)
Dismantling of HT pin Insulators (22KV)
Fixing of HT 22 KV Strain Disc.
Dismantling of HT 22 KV Strain Disc
Fixing of LT pin Insulator
Dismantling of LT pin Insulator
Fixing of LT Shackle
Dismantling of LT Shackle
Fixing of Aluminium Knob
Dismantling of Aluminium Knob
Earthing of pole with pit including burying looping and binding.
Paving of Conductor Stringing, complete with ACSR for both HT/LT lines - ACSR 7/3.35 mm / AAAC 7/3.15 mm
Dismantling of HT/LT Lines ACSR 7/3.35 mm / AAAC 7/3.15 mm
Paving of Conductor ,stringing, complete with 2x16 Sqmm,4x24 Sqmm, ACSR for both HT/LT lines - ACSR 7/2.59 mm , ACSR 7/2.11 mm , AAAC 7/2.50 mm
Dismantling of HT/LT Conductor and Cables (ACSR 7/2.59 mm , ACSR 7/2.11 mm , AAAC 7/2.50 mm)
Re-Sagging of Conductor,stringing,complete with ACSR for both HT/LT lines - ACSR 7/3.35 mm / AAAC 7/3.15 mm
Re-Sagging of Conductor , stringing,complete, ACSR for both HT/LT lines - ACSR 7/2.59 mm , ACSR 7/2.11 mm , AAAC 7/2.50 mm
HT/LT Guarding
Transport of Materials/ conductors and other materials( excluding loading and unloading charges.) - Upto 8 Kms.
Loading of poles upto 27'-0"
Unloading of polesupto 27'-0"
Loading of poles upto 30"
Unloading of poles upto 30"
Loading and unloading of line materials
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual upto 100m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual beyond 100m
Loading / Unloading of Transformer upto 200KVA
Erection of New Transformer all Capacities
Dismantling of Transformer all Capacities
Loading / Unloading of Transformer upto 100KVA
Loading / Unloading of HT Metering Set
Erection of HT Metering set
Dismantling of HT Metering set
Erection of Street light Service
Releasing of single phase service and refixing
Releasing of Three phase service and (upto 50 KW)refixing
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of channel
Cutting of RSJ Pole
Releasing of grills from RCC Poles
Releasing of grills from PSC Poles
Clearing of branches of trees
Erection of Transformer structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel , belting angle( Except erection of transformer)
Dismantling of Transformer structure completed in all respects(( Except Dismantling of transformer)
Erection of Single pole structure
Dismantling of Single pole structure
Erection of DT Structure
Dismantling of DT Structure
Sleeve concreting for poles including cost of materials and labour
Mass concreting for poles including cost of materials and labour
Base Concreting including cost of materials and labour
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Fixing of Top channel
Raleasing of Top Channel
Fixing of Bed channel
Releasing of Bed channel
Erection of structure materials - Cross with stud for bed channel
Dismantling of structure materials - Cross with stud for bed channel
Erection of structure materials - Belting Angle
Erection of AB switch (DP Structure)
Dismantling of AB switch (DP Structure)
Erection of H.G.Fuse set complete (DP Structure)
Dismantling of H.G.Fuse set complete (DP Structure)
Structure earthing complete with 3 pits and earth loops
Feeder arrangements with open type fuse unit for 2 feeders
Engaging of JCB for first 2Hrs
JCB-For every additinonal Hrs
Engaging of Crane for first 2Hrs
Crane-For every additinonal Hrs
LT- UG - Earthwork Excataion of 0.75 Mt Average depth, 0.45 mt average width in hard stiff clay, shales murran gravel, stoney earth and mixed gravel, stoney earth and mixed with small sizes boulders and gravelly soil for sand bedding as directed by the Engineer - in-charge at site and including providing labour for watching over the excavated trench during day and night to avoid any accident caused to animal and human being including cost of signal board, danger light, trial pit, barrycade arrangements, lead and lift etc, completed (This excludes Blacktopping charges)
LT- UG - Labour charges for removing of black topping portion of 0.45 mt average width by using chisel, hammer and pick axe and including cost of signal board and danger light and providing watch and ward staff to prevent any accident caused to the cattle and human beings including sharpening charges of chisel and including excavation of road cutting using JCB/Air compressor Drill at Day and Night time and avoiding any damage to the telecom and water lines etc (Along the Road) including trial pits
LT- UG - Providing sand bedding with good quality of Manufactured Sand to a depth of 6" in the excavated cable trench including cost of sand, labour, and labour charges for transport,lead, lift, etc., complete
LT- UG - Loading of LT armoured cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P such as crowbars,DShackle etc., that must be brought by the contractor. - Dept Vehicle
LT- UG - Loading of LT armoured cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P such as crowbars,DShackle etc., that must be brought by the contractor. - Private Vehicle (upto 50 KM)
LT- UG - Loading of LT armoured cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P such as crowbars,DShackle etc., that must be brought by the contractor. - Private Vehicle(Above 50 KM)
LT- UG - Recoiling / Laying / Removal of LT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage , sealing the cable with end caps with suitable ends which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading , tools and plants, rollers etc etc.,the contractor must bring all tools and plants and Rollers. - 2 x 16 Sqmm
LT- UG - Recoiling / Laying / Removal of LT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage , sealing the cable with end caps with suitable ends which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading , tools and plants, rollers etc etc.,the contractor must bring all tools and plants and Rollers. - 4 x 25 Sqmm
LT- UG - Recoiling / Laying / Removal of LT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage , sealing the cable with end caps with suitable ends which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading , tools and plants, rollers etc etc.,the contractor must bring all tools and plants and Rollers. -4 x 120 Sqmm
LT- UG - Recoiling / Laying / Removal of LT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage , sealing the cable with end caps with suitable ends which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading , tools and plants, rollers etc etc.,the contractor must bring all tools and plants and Rollers. -4 x 240 Sqmm
LT- UG - Drawal/Laying of R.C.C."V" Troughs in the excavated cable trench from Stores/ Worksite including transportation without any damage .This includes all Lead ,Lift ,Safe Unloading, safe Loading and safe transport etc. ( Note: Damage if any due to rough handling, the cost of V trough will be deducted)
LT- UG - Refilling the cable trench and duct with excavated earth in layer,ramming and consolidating properly in layers of 6" and the top brought in line with the existing surface including labour, lead, lift. Etc., complete
LT- UG - Fixing Cable termination for 120/240 Sqmm UG Cable using 4 Nos lugs including supply of clamps, bolt and nuts, lugs by the contractor along the structure / Pillar box
Dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. - - Mini way pillar box
Dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. - 4 way pillar box
Dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. - 6way pillar box
Erection of 1.1 KV 4C x 120,240 Sq.mm LT UG Cable Straight Joint Kit-Heat shrinkable type, including charges for cable jointer.
LT- UG - Laying of 75/100 mm dia PVC/GI pipes for Road and Drainage crossing for the LT Cable laying at Road and Drainage crossing etc. (Note: Normally PVC Pipes will be used for termination structure. Only in specific locations the GI pipe will be used as per the advise of site engineer incharge) - GI Pipe
LT- UG Loading, unloading ,transporting and erection of RCC Cable marker of standard size including painting the word " TNEB/ UG CABLE" and other notations as per the site Engineers instruction. (Includes excavation and laying)
HT UG - Earthwork excavation 1.2 Mt.average Depth X 0.6mt average width in hard stiff clay, shales murran gravel, stoney earth and mixed with small sizes boulders and gravelly soil r for sand bedding as directed by the Engineer-in-charge at site and including providing labour for watching over the excavated trench during day and night to avoid any accident caused to animal and human being including cost of signal board, danger light, lead and lift etc., complete excluding blacktopping and including trial pits charges
HT UG - Labour charges for removing of black topping portion of 0.6mt average width by using chisel, hammer and pick axe and including cost of signal board and danger light and providing watch and ward staff to prevent any accident caused to the cattle and human beings including sharpening charges of chisel and including excaavation of road cutting using JCB/Air compressor Drill at Day and Night time and avoiding any damage to the telecom and water lines etc (Along the Road) including trial pits
HT UG - Providing sand bedding with good quality of river sand to a depth of 6" in the excavated cable trench including cost of sand, labour, and labour charges for transport,lead, lift, etc., complete
HT UG - Loading of HT cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars,siling,DShackle etc., that must be brought by the contractor. - Dept Vehicle
HT UG - Loading of HT cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars,siling,DShackle etc., that must be brought by the contractor. - Private Vehicle Below 50 KM
HT UG - Loading of HT cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars,siling,DShackle etc., that must be brought by the contractor. - Private Vehicle Above 50 KM
HT UG -Dismantling of HT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage,sealing the cable with end caps with suitabl endsand which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading of tools and plant etc.,the contractor must bring all tools and plants.
HT UG - Recoiling / Laying / Removal of HT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage , sealing the cable with end caps with suitabl endsand which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading of tools and plant etc.,the contractor must bring all tools and plants.
HT UG - Drawal/Laying of R.C.C."V" Troughs in th excavated cable trench from Stores/ Worksite including transportation without any damage .This includes all Lead ,Lift safe unloading, safe Loading and transport etc. ( Note: Damage if any due to rough handling, the cost of V trough will be be deducted)
HT UG - Refilling the cable trench and duct with excavated earth in layer,ramming and consolidating properly in layers of 6" and the top brought in line with the existing surface including labour, lead, lift. Etc., complete
HT UG - Fixing of cable termination including supply of clamp at 3 locations along the structure after completion of termination joint.Termination joint will be done by cable jointer separately.But this includes releasing of cable drum from the cable pit/ structure ,providing and reeasing of tent,transporting of tent from office to site and back fixing the cable at structure and back filling the cable pit etc.
HT UG - Excavation of pit (for providing Straight joint) of size 3.6 M X 2.4 M X 1.3 M and excavation of cable trench for 3 M on either side of the joint location for releasing the cable.This includes labour for providing and releasing of tent at joint location, transporting of tent from office to site and back, removing and refixing of "V" troughs, fixing the joint works &carefully fixing the joint in position after completing of jointing and refilling the trench with the excavated soil.
HT UG - Erection of 160 mm dia ISI PVC Pipe for Road and Drainage crossing for the HT Cable laying ( Note: Normally PVC Pipes will be used for termination structure. Only in specific locations the GI pipe will be used as per the advise of site engineer incharge) - GI Pipe
HT UG -Erection of 160 mm dia ISI PVC Pipe for Road and Drainage crossing for the HT Cable laying ( Note: Normally PVC Pipes will be used for termination structure. Only in specific locations the GI pipe will be used as per the advise of site engineer incharge) - PVC Pipe
HT UG - Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Outdoor End termination Kit-Heat shrinkable type,including charges for cable jointer.
HT UG - Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Straight Joint Kit-Heat shrinkable type,including charges for cable jointer.
HT UG - Laying of P.C.C. 1:3:6 by using 20 mm HBG metal for on casing PVC/GI pipes in the Road crossing and streets in cable duct and other places wherever necessary including cost of all materials,lead, lift,labour charges, watch and ward, dangerboard, light, signal board etc.
Erection of Mini Pillar Box including cost of excavation , transportation, construction of 2 Nos pillar walls ( 1.20 m - Height x 0.5 m - Length x 0.2 m - width)., plastering of 2 Nos pillar walls as specified below including supply of all civil materials such as cement, sand, jelly and T&Ps. This includes earthing ( Earth pipe alone will be supplied by TANGEDCO)
Erection of 4 Way Pillar Box including cost of excavation , transportation, construction of 2 Nos pillar walls ( 1.20 m - Height x 0.5 m - Length x 0.2 m - width)., plastering of 2 Nos pillar walls as specified below including supply of all civil materials such as cement, sand, jelly and T&Ps.
Erection of 6 Way Pillar Box including cost of excavation , transportation, construction of 2 Nos pillar walls ( 1.20 m - Height x 0.530 m - Length x 0.28 m - width)., plastering of 2 Nos pillar walls as specified below including supply of all civil materials such as cement, sand, jelly and T&Ps. This includes earthing ( Earth pipe alone will be supplied by TANGEDCO)
Labour charge for laying of XLPE HT Cable 3x400 sqmm using trenchless method including the cost of 160mm HDPE pipe by HDD method
Supplying and erection of cost iron 250mm dia pipes at railway crossing by adopting trenchless method, including cost of all materials, labour and transportation, lead, lift etc complete.
Supplying and erection of cost iron 250mm dia pipes along railway crossing by open cutting method, including cost of all materials, labour and transportation, lead, lift etc complete.
G.S.T. @18% should be Entered by the Bidder
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_760584.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid