| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr Quoted ₹2.1 Cr | L1 | Accepted-AOC ACCEPTED AS L1 CONTRACTOR |
| 2 | L2₹2.1 CrRejected-AOC 201 3RD FLOOR A BLOCK SRI GURU TOWERS 80 FEET ROAD ANNA NAGAR MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | ₹2.1 Cr | L2 | Rejected-AOC REJECTED SINCE RATE QUOTED ARE HIGHER THAN L1 |
| 3 | L3₹2.1 CrRejected-AOC | ₹2.1 Cr | L3 | Rejected-AOC REJECTED SINCE RATE QUOTED ARE HIGHER THAN L1 |
| Sl No | Description | Qty | Unit | CMK Projects Private Ltd., L2 | V SATHYAMOORTHY CO L3 | A & A BUILDERS AND PROMOTERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 680 | Cu.m | 300 ₹2.0 L | 320 ₹2.2 L | 290 ₹2.0 L |
| 2.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 16 | Cu.m | 2,200 ₹35,200 | 2,150 ₹34,400 | 2,000 ₹32,000 |
| 3.00 | Supplying and filling 40mm gauge HBGS stone jelly for dispersion trench including loading conveying and unloading and as directed by the departmental officers etc. complete complying with standard specification. | 5 | Cu.m | 1,700 ₹8,500 | 1,750 ₹8,750 | 1,650 ₹8,250 |
| 4.00 | Supplying and filling 20mm gauge HBGS stone jelly for dispersion trench including loading conveying and unloading and as directed by the departmental officers etc. complete complying with standard specification. | 5 | Cu.m | 2,200 ₹11,000 | 2,300 ₹11,500 | 2,100 ₹10,500 |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 105 | Cu.m | 6,000 ₹6.3 L | 5,800 ₹6.1 L | 5,900 ₹6.2 L |
| 6.00Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | ||||||
| 6.01 | For Foundation and Basement | 21 | Cu.m | 9,000 ₹1.9 L | 9,000 ₹1.9 L | 9,100 ₹1.9 L |
| 7.00Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMT and all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | ||||||
| 7.01 | For Foundation and Basement | 30 | Qtl | 10,500 ₹3.1 L | 11,000 ₹3.3 L | 10,600 ₹3.2 L |
| 8.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 75mm thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using 20mm HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers. | 163 | Sq.m | 1,000 ₹1.6 L | 1,000 ₹1.6 L | 980 ₹1.6 L |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
20 Jan 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
O/o THE SUPERINTENDING ENGINEER PWD BUILDINGS CONSTRUCTION AND MAINTENANCE CIRCLE COIMBATORE
Provision for Parking Area and Outer Development Works for the work of construction of Grand Library and Science Center in Coimbatore District
2026_PWD_642989_1
72BCMCBE06012026(3)
Open Tender
Civil Works - Buildings
GANDHIPURAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.1 L
16 Feb 2026
14 Jan 2026
20 Jan 2026
14 Jan 2026
20 Jan 2026
14 Jan 2026
Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and filling 40mm gauge HBGS stone jelly for dispersion trench including loading conveying and unloading and as directed by the departmental officers etc. complete complying with standard specification.
Supplying and filling 20mm gauge HBGS stone jelly for dispersion trench including loading conveying and unloading and as directed by the departmental officers etc. complete complying with standard specification.
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means
Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
For Foundation and Basement
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMT and all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
For Foundation and Basement
item code 010
Manufacturing, supplying and fixing in position plain cement concrete precast kerb slab of size 600mm x 600mm x 100mm in Cement Concrete 1:2:4 (One cement, Two crushed stone sand and Four jelly) using 20mm HBG stone jelly including cost of moulding charges, casting of slab, finishing, curing, fixing and pointing the slab with CM 1:3 (One Cement and Three Crushed Stone Sand) to full depth of slab etc., complete complying with standard specification and as directed by the departmental officers.
Providing and laying the Granular Sub-base with close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 (for grading-III Material) (GSB)
Supplying and laying of TAMIN PAVER BLOCK 80mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers.
DRILLING 150mm dia [6"] Vertical bore using power drill in hard rock to any required depth as directed by the departmental officers including labour charges for inserting casing pipes to the require depth assembly in drilled hole including welding the joint if necessary, grouting the casing pipe etc., and including transportation charges for the rig and support vehicle.
Borewell upto 150m below GL
Supply suitable PVC End Cap (6kg/sqcm) of best quality for casing pipe of 6" dia borewell quality with ISI mark, The PVC End cap should got approved by the departmental officers.
Supplying and fixing of PVC CASING PIPE 160mm dia suitable for 6" Borewell conforming to I.S. 12818 - 1992 with screwed and socked and centering guides for every 15m interval etc., as directed by the departmental officers. [with / without slot]
Supplying and Fixing of 1 1/4" dia H.I tensile U.P.V.C pipe of best quality for delivery cum support pipe for submercible motor inside borewell etc., complete complying with standard specifications. 40mm dia UPVC pipe
畓灰祬湩湡楦楸杮猠湩汧楳敤㈠洰汢捡楦楮桳愠牣汹捩映慲敭眠瑩㌠浭琠
item code 020
ENGLISH LETTERS 30CM
TAMIL LETTERS 60CM
item code 024
item code 025
item code 026
item code 027
item code 028
item code 029
item code 030
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_770433.xls
BOQ • 0.41 MB
GenConditionPARKING1.pdf
Tender Documents • 0.64 MB
Download all tender documents and submit your bid