| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance HARYANA HR | KARNAL | HARYANA | 132001 | +0.00% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 LAdmitted-Finance 403 VIPIN KUMAR CONTRACTOR ADHAUN ADHAUN NEAR JAT PARK KURUKSHETRA KURUKSHETRA HARYANA KURUKSHETRA 136119 INDIA | KURUKSHETRA | HARYANA | 136119 | +3.45% | ₹1.8 L | L2 | Admitted-Finance |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
2 Jun 2026, 11:00 amClosed
YOGESHWAR
HSVP DIV 1 Sec 8 Panchkula
Providing and Laying of 90mm HDPE Tertiary Water Line at Town Park in Sector 5 Panchkula.
2026_HBC_524580_1
2026DD59CC0F 8029 4108 9EE9 066FDBB1768B269HSV
Open Tender
Civil Works
30 days
Panchkula
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
₹3,380
Yes
5 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
2 Jun 2026
26 May 2026
26 May 2026 - 2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | 4.12.1:- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in- charge. 1. All kinds of soil [Through Rate] | 23.56 | P. Cum. | 78 | ₹1,837.68 | BI01010001010000000000000515BI0100001112 |
| 2 | 11.5.3:- 12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 29.04 | P. Sqm. | 113 | ₹3,281.52 | BI01010001010000000000000515BI0100001113 |
| 3 | 10.100.2:- Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 2.08 | P. Cum. | 1,863 | ₹3,875.04 | BI01010001010000000000000515BI0100001114 |
| 4 | [8.33.2:- Providing and fixing PPR Unions 2. PPR Union 25mm [Through Rate] | 7 | Each | 185 | ₹1,295 | BI01010001010000000000000515BI0100001115 |
| 5 | 7.21.2:- Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 8.77 | P. Cum. | 3,968 | ₹34,799.36 | BI01010001010000000000000515BI0100001116 |
| 6 | 22.103.1:_ Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 1. 15 mm nominal bore [Through Rate] | 5 | Each | 260 | ₹1,300 | BI01010001010000000000000515BI0100001117 |
| 7 | 22.135.1:- Providing and fixing required Stainless Steel Fitting of press fit design of grade AISI 304 conforming to JWWA G116 standard with V-profile or M-profile and with O-ring sealing gasket of EPDM material of required dia as per direction of Engineer-in-charge. Elbow 90° 1. For 15.88mm outer dia pipe [Through Rate] | 7 | Each | 75 | ₹525 | BI01010001010000000000000515BI0100001118 |
| 8 | 21.93.2:- Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer- in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening [Through Rate] | 4 | Each | 1,058 | ₹4,232 | BI01010001010000000000000515BI0100001119 |
| 9 | 6.1.2:- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through
Rate] | 1.62 | P. Cum. | 3,476 | ₹5,631.12 | BI01010001010000000000000515BI0100001120 |
| 10 | [6.14.2:- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 2.13 | P. Cum. | 3,875 | ₹8,253.75 | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_603528.xls
BOQ • 0.25 MB
AD0165530.pdf
Additional Documents • 1.42 MB
OT0165530.pdf
Other Document • 0.09 MB