Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAdmitted-Finance | ₹4.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.1 Cr+₹55.9 L (12.4%)Admitted-Finance F 8 35 RAMPUR GARDEN BAREILLY UTTAR PRADESH 243005 | BAREILLY | BAREILLY | UTTAR PRADESH | 243005 | ₹5.1 Cr+₹55.9 L (12.4%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical CHANDAN NAGAR OPP IOCL PERTROL PUMP RAMPUR ROAD BAREILLY UP 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SATYA SAI BUILDERS AND CONTRACTORS L1 | mishrilal associates pvt.ltd L2 |
|---|---|---|---|---|---|
| 1.00SUPPLY OF MATERIALS | |||||
| 2.00 | ST Pole 11 mtr long | 189 | Nos. | - | - |
| 3.00 | 11 KV Steeal X Arms as per RESSPO Norms | 78 | Nos. | - | - |
| 4.00 | X-Arm Holding Clamp as per RESSPO Norms | 78 | Nos. | - | - |
| 5.00 | F Brackets as per RESSPO Norms | 78 | Nos. | - | - |
| 6.00 | 11 KV G.I. Pin with Insulator as per RESSPO Norms | 252 | Nos. | - | - |
| 7.00 | 11 KV Disc Insulator with Fitting as per RESSPO Norms | 138 | Nos. | - | - |
| 8.00 | 33 KV Disc Insulator with Fitting as per RESSPO Norms | 18 | Nos. | - | - |
| 9.00 | Stay Set Complete as per RESSPO Norms | 113 | Nos. | - | - |
| 10.00 | Stone Pad as per RESSPO Norms | 189 | Nos. | - | - |
Tender Value
₹5 Cr
EMD Value
₹5 L
Closing Date
4 May 2020, 1:00 pmClosed
S.E., E.D.C., Akbarpur, Ambedkar Nagar
S.E., E.D.C., Akbarpur, Ambedkar Nagar
THE WORK SHIFTING OF EXITING 11 KV and 33 KV HT AND LT LINES DUE TO CROSSING OF GORAKHPUR LINK EXPRESS WAY AT VARIOUS PLACES ON TURNKEY BASIS IN THE JURISDICTION OF ELECTRICITY DISTRIBUTION DIVISION JALALPUR AMBEDKARNAGAR
2020_MVVNL_462693_1
62-EDC(A)/2019-20
Open Tender
Electrical Works
Turn-key
180 days
Ambedkar Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
S.E., E.D.C., Akbarpur, Ambedkar Nagar
₹5 L
Yes
26 May 2020
27 Apr 2020
4 May 2020
27 Apr 2020
4 May 2020
27 Apr 2020
Amount
SUPPLY OF MATERIALS
ST Pole 11 mtr long
11 KV Steeal X Arms as per RESSPO Norms
X-Arm Holding Clamp as per RESSPO Norms
F Brackets as per RESSPO Norms
11 KV G.I. Pin with Insulator as per RESSPO Norms
11 KV Disc Insulator with Fitting as per RESSPO Norms
33 KV Disc Insulator with Fitting as per RESSPO Norms
Stay Set Complete as per RESSPO Norms
Stone Pad as per RESSPO Norms
Earthing Complete as per RESSPO Norms
ACSR Dog Conductor as per RESSPO Norms
L.T. Shakel Insuletor with Nut Bolt as per RESSPO Norms
L.T. Clamp with Nut Bolt as per RESSPO Norms
I Hook as per RESSPO Norms
3x185 sq. mm XLPE 11 KV Cable as per RESSPO Norms
G.I. Wire 6 SWG & 8 SWG as per RESSPO Norms
Top Chanel as per RESSPO Norms
T-off Chanel as per RESSPO Norms
Dropper Angle as per RESSPO Norms
S/S Base Angle as per RESSPO Norms
Holding Clamp For Top Channel as per RESSPO Norms
Holding Clamp For Droper Angle as per RESSPO Norms
Holding Clamp For T-off Channel as per RESSPO Norms
1x16 sq. mm AB L.T Cable as per RESSPO Norms
Danger Board as per RESSPO Norms
M.S. Bolt and Nut of different size as per RESSPO Norms
11 KV Cable Termination Kit as per RESSPO Norms
33 KV Cable Termination Kit as per RESSPO Norms
HDPE Pipe Double Ckt. 06 Inch Size as per RESSPO Norms
G.I. Pipe 06 Inch Dia as per RESSPO Norms
Gaurding Angle as per RESSPO Norms
Holding Clamp For Gaurding Angle as per RESSPO Norms
3x95 sq. mm + 1x16 mm messenger wire AB L.T. Cable as per RESSPO Norms
33 KV XLPE Cable3x300 Sq.mm as per RESSPO Norms
M.S. Angle 65x65x6 mm bracing with clamp as per RESSPO Norms
ERECTION WORK
11 KV Steeal X Arms as per RESSPO Norms
X-Arm Holding Clamp as per RESSPO Norms
F Brackets as per RESSPO Norms
11 KV G.I. Pin with Insulator as per RESSPO Norms
11 KV Disc Insulator with Fitting as per RESSPO Norms
33 KV Disc Insulator with Fitting as per RESSPO Norms
Stone Pad as per RESSPO Norms
L.T. Shakel Insuletor with Nut Bolt as per RESSPO Norms
L.T. Clamp with Nut Bolt and I Hook as per RESSPO Norms
G.I. Wire 6 SWG & 8 SWG as per RESSPO Norms
Top Chanel as per RESSPO Norms
T-off Chanel as per RESSPO Norms
Dropper Angle as per RESSPO Norms
S/S Base Angle as per RESSPO Norms
Holding Clamp For Top Channel as per RESSPO Norms
Holding Clamp For Droper Angle as per RESSPO Norms
Holding Clamp For T-off Channel as per RESSPO Norms
Danger Board as per RESSPO Norms.
M.S. Bolt and Nut of Different size as per RESSPO Norms.
Making & Jointing of 11 KV Cable Termination Kit as per RESSPO Norms.
Making & Jointing of 33 KV Cable Termination Kit as per RESSPO Norms.
G.I. Pipe 6 Inch Dia as per RESSPO Norms
Gaurding Angle as per RESSPO Norms
Holding Clamp For Gaurding Angle as per RESSPO Norms
M.S. Angle 65x65x6 mm bracing with clamp as per RESSPO Norms
Dragging of All Type Cable from dump site to pit site
Dragging of ST Pole from dump site to pit site
Erection of Single Pole Support on ST Pole 11 mtr long including digging of pit and fixing of all accessories, as per RESSPO Norms.
Erection of Double Pole Support on ST Pole 11 mtr long including digging of pit and fixing of all accessories, as per RESSPO Norms.
Earthing of Poles by Earthing rod as per RESSPO Norms
Grouting of S.T Pole 11 mtr long alongwith plinthing by providing of cement sand & Brick Ballast in ratio 1:4:8 as per RESSPO Norms.
Binding of Stay in as per RESSPO Norms.
Concreting of Stay by providing of cement sand & Brick Ballast in ratio 1:4:8 as per RESSPO Norms.
Stringing, Sagging, Binding & Jumpering of ACSR Dog Conductor as per RESSPO Norms
Laying of HDPE Pipe for Double Ckt. Cable below road crossing for laying XLPE Cable, digging of Kachcha and Pakka Road for pit as per RESSPO Norms.
Stringing, Sagging, Binding & Jumpering of 1x16 sq. mm AB L.T Cable as per RESSPO Norms.
Stringing, Sagging, Binding & Jumpering of 3x95 sq. mm + 1x16 mm messenger wire AB L.T. Cable as per RESSPO Norms.
Laying of Underground 3x185 sq. mm XLPE 11 KV Cable on Kachcha Road having distance atleasst 6" between both the Circuits, after making Trench 09 Inch Depth including cost of all materisal such as Sand, Brick etc. as per RESSPO Norms.
Laying of Underground 33 KV XLPE Cable 3x300 Sq.mm on Kachcha Road having distance atleasst 6" between both the Circuits, after making Trench 09 Inch Depth including cost of all materisal such as Sand, Brick etc. as per RESSPO Norms.
Dismantling of Line & Cartage upto departmental Store (Distance Approx. 40 Kms.)
Dismantling of Double Pole Structure & Cartage upto departmental Store (Distance Approx. 40 Kms.)
Cartage of all Materials
mishrilal associates pvt.ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.02 MB
Tender_62_19_20.pdf
Tender Documents • 0.27 MB
BOQ_688747.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .