Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Credentials not O.K |
Tender Value
Refer Docs
EMD Value
₹7,066
Closing Date
10 Dec 2020, 2:30 pmClosed
The Director, CSIR-CMERI
The Director, CSIR-CMERI, Durgapur 713209, West Bengal
New steel staircase for single room Guest House near Pond at CSIR-CMERI Colony Campus, Durgapur-09
2020_CSIR_63377_1
29/49/2020-21/CC/ESD/Maint.
Open Tender
Civil Works
Item Rate
90 days
CSIR-CMERI COLONY, DURGAPUR
PAN, GST, Trade License and Experience Certificate as per NIT requirement
5 documents required · 5 mandatory
₹500
Yes
Director, CMERI
₹7,066
Yes
21 Dec 2020
3 Dec 2020
11 Dec 2020
3 Dec 2020
10 Dec 2020
3 Dec 2020
Amount
Demolishing brickwork manually/ by mechanical means including stacking of serviceable materials and disposal of unserviceable materials within 50m lead in cement mortar.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position 1:2:4 (1 Cement : 2 Coarse Sand : 4 graded stone aggregate 20 mm nominal size) cement concrete of specified grade excluding the cost of centering and shuttering, all the work upto plinth level.
Providing and laying in position 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level.
Centering & shuttering including strutting, propping etc & removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete:Hot finished welded type tubes
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required: In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
M/S Mousumi Enterprise
Maa Mahamaya Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .