Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-Finance | L1 | Accepted-Finance Lowest among the valid bidders | |
| 2 | L2₹6.7 L+₹68,703.39 (11.5%)Accepted-Finance E B OFFICE B 636 301 | NAMAKKAL | TAMIL NADU | 636301 | L2 | Accepted-Finance L2 Bidder | |
| 3 | L3₹8.4 L+₹2.4 L (39.4%)Accepted-Finance | L3 | Accepted-Finance L3 Bidder | |
| 4 | L4₹9.3 L+₹3.4 L (56.0%)Accepted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | L4 | Accepted-Finance Highest among the valid bidders | |
| 5 | Rejected-Technical | - | Rejected-Technical Evaluation Rejected |
Tender Value
₹9.8 L
EMD Value
₹10,000
Closing Date
12 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/o Executive Engineer,WRD., Bhavanisagar Dam Division, Bhavanisagar
Special Repairs to Rubber seal and painting works of River sluice shutter No.4,5 and 6 in Masonry Portion of LBP Dam at Bhavanisagar.
2026_WRD_718526_1
NIT No.5/2026-27/dt.26.10.2026
Open Tender
Civil Works
Lump-sum
Bhavanisagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
23 Nov 2026
28 Oct 2026
13 Nov 2026
28 Oct 2026
12 Nov 2026
28 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Replacement of bottom rubber seal of the River Shutter of Size 6 X 10 feet – 3 Nos as per the following specification. The Old rubber seal shall be removed from the skin plate after removal of the rusted bolts & nuts by gas cutting equipments. The seal seat cover shall be removed along with the rubber seal. The Skin plate & seal seat cover surface shall be neatly cleaned on either side by grinding. Now, the existing seal seat cover made of 100 X 10mm MS flat & the new rubber seal shall be now matched with the existing holes in the skin plate and then holes shall be drilled in the seal seat cover to align with that in the skin plate, if necessary. 18mm holes shall be punched accordingly in the rubber seal of size 100 X 16mm. The inside surface of the seal seat cover is given a coat of anticorrosive zinc rich primer over which two coats of coal tar epoxy shall be applied at an interval of 24 hours between each coat. Now the rubber seal shall be placed on the skin plate over which the seal seat cover shall be placed and fastened with MS bolts and nuts of size M16 X 75. The cost of all materials, labour charges, transport, erection, hire charges for machinery, incidental charges like conveyance to & from site, etc., Complete and as directed by departmental officers. | 6 | Running Metre | 12,500 | ₹75,000 |
| 2 | Replacement of Musical Node rubber seal as per IS 11855:2004 at side & Top of the vertical Shutter of Size 6 X 10 feet– 3 Nos as per the following specification. The old seal cover plate shall be dismantled from the skin plate after removal of the rusted bolts &nuts by gas cutting. The skin plate surface shall be neatly cleaned by grinding. Now the existing holes in the skin plate and then holes should be punched accordingly to align with that in the skin plate. The rubber seal of size 100mm X 40mm X 16mm Dia and “L” Corner Seal shall be placed on the skin plate over which the seal seat cover shall be placed and fastened with CSK bolts. The cost of all materials, labour charges, transport, erection, hire charges for machinery, incidental charges like conveyance to & from site, etc., Complete and as directed by departmental officers. | 22.8 | Running Metre | 17,000 | ₹3,87,600 |
| 3 | Application of a high performance coating to protect the steel structure from highly abrasive, erosive and corrosive environments. This being an industrial coating enhances the life of the structure and reduces the strain of continuous maintenance. After surface preparation of the structure, a primer coat with mastic primer shall be applied. This surface to be applied should be dry & abrasive cleaned up to Sa21/2. The dry film thickness should be 40 - 60µ for primer coat. The Colour is grey and minimum plot time should be 12 hours. The mixing ratio of base to accelerator by volume should be according to the manufactures standard. All paint when applied, shall provide a satisfactory film and a smooth and even surface. Paint shall be applied when the temperature of the metal or surrounding air is below 10 degree Celsius and that of the metal is above 50 degree Celsius, or when the humidity is above 90 percent, or when it threatens to rain before the painted coat gets dry. Primer Coat Shall be protected during the initial curing period against the possibility of moisture condensation or contamination with foreign matter. All painting works shall be performed by airless spraying. When the material is applied by spraying, suitable means shall be provided to prevent segregation during the coating operation. Free oil and moisture shall be removed from the air supply lines of all spraying equipment. Primer coat shall be uniform and runs sags and other imperfections. The time between successive coats shall be not less than the minimum not more than maximum re coating time specified by the paint manufacturer. The paint shall be applied so that the thickness at any point is not less than stipulated in the approved painting specifications. Surface not required to be coated, but adjacent to surface which are to be cleaned and coated, shall be adequately protected during cleaning and coating. Repairs to damaged areas of the coating shall be carried out strictly in accordance with the approved Painting specifications. Because of the flammable and toxic nature of the coating materials, precautions should be taken to eliminate any health or safety hazard that may arise during the application of the coating. Smoking and welding shall not be allowed within 10 meters of the place when paining is in progress. The painting to the gates, hoists and other parts shall be done as per IS Specification No. 14177-1994. Guidelines for painting system for Hydraulic Gates and hoists and its Adjuncts Viz., IS: 1477 (Part I) – 1971, IS: 1477 (II) – 1971, IS: 2339 – 1963 and IS 2932 – 1994. The cost includes cost of primer, thinner, Paint, etc, labour charges for application of primer, hire charges for compressor, generator, airless spray, etc, cost of oil & diesel for generator, Scaffolding charges, transport charges, conveyance of machinery & tools to and from site of work, testing & inspection charges, risk allowance, etc, complete and directed by departmental officers | 141 | Square Metre | 700 | ₹98,700 |
| 4 | Application of Coal tar epoxy over the primer shall be through airless Spray method. The colour shall be black and the mixing ratio of base to accelerator should be manufacturer standards. The dry film thickness should be between 100 - 125µ per coat. The interval before over coating shall be 24 hours. All paint, when applied, shall provide a satisfactory film and a smooth and even surface, paint shall be thoroughly stirred, strained, and kept at the uniform consistency during application. Paint shall not be applied when the temperature of the metal or surrounding air is below 90 percent, or when it threatens to rain before the painted coat gets dry. Each coat shall be protected during the initial curing period against the possibility of moisture condensation or contamination with foreign matter. All painting works shall be performed by airless spraying, when the coating material is applied by spraying, suitable means shall be provided to prevent segregation during the coating operation. Free oil and moisture shall be removed from the air spray lines of all spraying equipment. Each coat shall be uniform and free from runs, sags and other imperfection. The time between successive coats shall be not less than the minimum not more than maximum re-coating time specified by the paint manufacturer. Surface not required to be coated, but adjacent to surfaces which are to be cleaned and coated, shall be adequately protected during cleaning and coating. Repairs to damaged areas of the coating shall be carried out strictly with the approved painting specification. Because of the flammable and toxic nature of the coating materials, precautions should be taken to eliminate any health or safety hazard that may arise during the application of the coating. The painting to the gates, hoist and other parts shall be done as per IS specification No.14177 – 1994. Guidelines for painting system for Hydraulic Gates and hoists and its Adjuncts Viz., IS: 1477(Part I) – 1971, IS: 1477 (part II) – 1971, IS: 2339 – 1963 and IS: 2932 – 1994. The cost includes cost of coal tar epoxy paint, thinner, etc, Labour charges for application, hire charges for compressor, generator, airless spray, etc, cost of oil & diesel for generator, scaffolding charges, transport charges, conveyance of machinery & tools to and from site of work, testing & inspection charges, risk allowance, etc, complete and directed by departmental officers. | 141 | Square Metre | 650 | ₹91,650 |
| 5 | Servicing of Guide Channel and Ladder:
Renewal of the three-stage guide channels by providing new ISMC 250 mm channels, consisting of 2 Nos. for each stage (3 × 2 = 6 Nos.), fabricated to suit the sluice well width and ensuring a minimum bearing length of 250 mm inside the masonry. The work shall include fabrication using MS flats and angles, welding, alignment, erection, embedding into the masonry for a minimum depth of 250 mm, and complete installation.Renewal of the suspension channels using ISMC 150 mm sections, 4.00 m long, in three stages. The channels shall be fabricated face-to-face by welding and connected to 12 mm thick gusset plates using 16 mm × 65 mm MS bolts and nuts. The assembly shall be connected to the shutter and screw rod, matching the existing arrangement, complete in all respects.Repairs to the working platforms inside the sluice well, including replacement of damaged and corroded structural members wherever necessary.Replacing the old corroded MS Fiat by gas cutting, grinding, cleaning the entire surface area thoroughly and renewed by new roller track with flat stainless steel 100 X 20 X 3.0 mtr length fixed and welded on both sides.Renewal and repairs of Guide Channel Steady/Rip Plates of size 70 mm × 12 mm × 3.00 m – 2 Nos., complete with fixing arrangements.Renewal and Repairs 2¾-inch diameter bolts and nuts – 60 Nos., including washers and all accessories.The rate shall include all Labour charges for Lathing, Drilling, Welding, Gas cutting, inclusive of all bolt and nuts, all paint and conveyance to this site, Loading and unloading charges, Grease packing, Lubricating oil, all civil works and Trial run satisfactorily, handing over of all old materials removed from this work to dam officials, etc., complete as directed by the Departmental Officers. All materials and works should be as per IS specification. | 3 | Job | 60,000 | ₹1,80,000 |
| 6 | GST 18% | 1 | Rs | 1 | ₹1 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_862942.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
tenderdoucument5_3.pdf
Tender Documents • 0.72 MB
BOQ_862942.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .