| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.5 L+₹8,535 (1.15%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹7.5 L+₹11,075 (1.50%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
27 Dec 2024, 5:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Additional illumination arrangement at Benuban river side point and adjacent area in connection with Ganga Sagar Mela 2025
2024_PHED_783927_5
WBPHE/EE/SMD/NIeT-68 of 2024-25
Open Tender
Electrical Work/ Equipment
Item Rate
30 days
Benuban
Please refer Tender documents.
7 documents required · 7 mandatory
₹15,000
Yes
4 Apr 2025
19 Dec 2024
30 Dec 2024
19 Dec 2024
27 Dec 2024
19 Dec 2024
Amount
N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1%
Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing the same at different places as per direction of EIC for the period from 08-01-2025 to 16-01-2025
Carrying charges of ACSR conductor and LED board etc from Sagar store to work site as per direction of EIC including loading unloading complete
Carrying of 1 No. departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 08.1.2025 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. accessories of the temporary Controlling station.
Redrawing the ACSR conductor and earth wire by single wire run for medium pressure line for proper SAG and jumper connection over insulator binding and fitting the safety device as per IE rules in different places at Benuban areas on the existing MS poles pole and testing complete as per direction of the EIC (Binding wire will be supplied by the agency).
Drawing of 250 watt street light fixture in different place of Road, bus stand, jetty ghat etc. on hire basis of 250 watt S.V fixture ballast,250 watt S.V. lamp from 08-01-2025 to 16-01-2025= 09 days x 40 pts.
Fitting fixing of 150 watt LED street light fixture in different place of road,on hire basis from 08.01.2025 to16.01.2025 (09 days x 20 fittings per day)
Drawing and fitting fixing of 1000 Watt halogen fixture with lamp at jetty area from 08-01-2025 to 16-01-2025= 09 days x 10 pts.
Making earthing arrangement on hire basis by supplying 5/8'' dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole.
Supply and fitting fixing of hexagonal type safety device on hire basis 10SWG GI wire for LTOH line as per direction of EIC and IE rules complete
Supply and drawing of continuous earth wire from pole to pole by supplying 10SWG GI wire with all necessary materials and inter connection to earth electrode as per direction of EIC and IE rules complete
Making stay arrangement on hire basis by necessary materials which will be required i.e. stay wire of required length, stay rod, clamp, chips, sand etc as per IE rules and ISS complete as per direction of EIC
Construction of 12 ft x 14 ft hogla shed by supplying bamboo, polythene sheet, hogla, nail etc as per direction of the EIC only for personnel [not for DG set]
Guarding arrangement of the whole installation for the entire period.
Dismantling the existing ACSR conductor and earth wire by single run from end pole to end pole after disconnection all jointing materials i.e. jumper, insulator, safety device binding wire from the PCC pole in different places at Chemaguri area all complete as per direction of EIC.
Carrying charges of ACSR conductor and LED board from Benuban area at chemahuri to Sagar store and proper staging the materials at departmental store as per direction of EIC.
Hiring of 63 Amps Main switch , changeover all complete
Drawing 3 Ph, 415v LT power line from WBSEDCL distribution loop box to temporary controlling station by 25 sq. mm. 3.5 core aluminum armour cable.
Drawing LT distribution line [3-phase 4-wire type] from local mains on hire bsis by7/16 PVC 25 sq. mm. single core aluminum wire for illumination of luminaries.
Making 4 leged strong square type shape bamboo structure 9 mtr high as bamboo tower with proper support at river bank including hiring of bamboo, addditional materials as required all complite w.e.f 08/01/2025 to 16/01/2025
Supply on hire basis SV Torch 400 Watt from 08/01/2025 to 16/01/2025= ( 9 days x 10 Nos) = 90 Nos
B T PROJECTS PRIVATE LIMITED (BID ID -5917506)
ORIENTAL ENGINEERING CO. (BID ID -5918473)
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .