Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹23.2 Laccepted-aoc | ₹23.2 L | accepted-aoc |
Tender Value
₹23.3 L
EMD Value
₹56,000
Closing Date
29 Dec 2025, 10:30 pmClosed
Karnataka State Horticulture Department
ABHAYKUMAR DESA
9900002260
Developing Graden at TMC park Mudhol
KSHD/2025-26/OW/WORK_INDENT33/CALL-2
KSHD/2025-26/OW/WORK_INDENT33/CALL-2
Open
Other Works
Two Tender Document System(Two Cover)
KSHD SeniorAssitant Director ZP Office Mudhol
4 documents required · 0 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
FILL AND UPLOAD ALL TECHNICAL BID DOCUMENT
₹590
₹56,000
29 Dec 2025
20 Dec 2025
31 Dec 2025
26 Dec 2025
Developing Graden at TMC park Mudhol
Cutting & clearing thick and thin undergrowth plants (including plants upto 0.25 M girth) & bushes including removal of roots with an initial lead of 50.M. & lift of 1.50 M.
PLANTING OF SHRUBS (a) Base work:- Digging pits of 0.45 x 0.45 x 0.45m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt)...
Cost of Plants:
including transportation and handling charges
Along the Compound Wall
1. Caesalpinia species -183 nos (Spacing 2 mt distance)
Along the Center Path, Way to Children path and Gazebo
PLANTING OF SHRUBS / FOLIAGE PLANTS IN GROUPS:-
(a) Base work:- Digging of soil upto1.0m x 1.0m x 0.45m depth & filling 50% of the pit with top exavated soil and remaining 50% of the pit with 1:2:3 p...
nCost of Plants 8 plants per Sqm
including transportation and handling charges
Foliage group near entrance under ficus tree
Spathiphyllum, Philodendron, Aglaonema, Monstera deliciosa, Alpinia etc
Cost of Plants: 8 plants per Sqm
including transportation and handling charges
1. Ficus triangularis -232 plants
2. Ficus panda -232 plants
3. Eugenia - 232 plants
4. Schfflera -232 pl...
Cost of Plants: 8 plants per Sqm
including transportation and handling charges
Shrubs in circle
1. Euphorbia milli -112 plants
Cost of Plants: 8 plants per Sqm
including transportation and handling charges
Shrubs in Oval shape - Different height plants
1. Dracena/Croton species
2. Euphorbia milli
PLANTING OF HEDGES:-
(a) Base work:- Digging trench of size 1.0m x0.30m x 0.45m and filling upto 50% of the pit with top excavated soil and filling 50% of the trench with 1:2:3 proportion of sand (0....
SUPPLY OF HEDGE PLANTS
b) Cost of plants:- 7 Plants/Rmt
(including transportation and handling charges)
1. Plant- Clerodendrum Inerme/Duranta
PLANTING OF SPECIMEN PLANT:-
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red e...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
PLANTING OF CREEPERS :-
SUPPLY OF ADDITIONAL RED EARTH FOR LEVELLING
1. Slope Area = 35 x 5.0 x 0.20 = 35 cum
2. For Raising 2nd step and 1st step in the Pony Tail Circle/Way to Children play ground c...
Base work:-Digging pits of 0.45 x 0.45 x 0.45m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) an...
Cost of Plants:
including transportation and handling charges
1. Slope Area near Children's Garden -
Antigonon leptopus - 100 nos
2. Creepers for Pergola - Thunbergia
mysorensis (Lady's Slipper V...
PLANTING OF GROUND COVER PLANTS :-
(a) Base work:- Digging the area of 1m x 1m x 0.45m and mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.0375cmt...
Cost of Plants:10 plants per Sqm
including transportation and handling charges
Under Traveller's Palm
Plant- Lantana Species -70 nos
Under Pony tail palm
1st Step - Tradescantia spathacea- Rhoeo pla...
BULBOUS BED (CANNA):-
(a) Base work: Developing bulbous beds by digging to a depth of 0.45m filling 50% of the area with excavate top soil remaining 50% with sand (0.0375cum), FYM (0.075cum), Red eart...
Cost of Plants :- Corms/Bulbs
including transportation and handling charges
(A) SCRAPPING AND REMOVING TOP SOIL :-Clearing the site by scrapping and removing top 0.15m soil to a minimum depth of 0.45M along with grass. Removing unwanted debris, grass along with excava...
1ST DIGGING:- Earth work digging for developing lawn including removing weeds, debris if any and breaking of clumps, watering etc.
2ND DIGGING:- Digging for second time removing weeds, if any and minor leveling.
SUPPLY OF RED EARTH: Supplying and stocking good Quality red earth for filling the top 6” area.
Providing of red earth, FYM and Sand in the ratio of 1:3:6 and spreading to a depth of 7.5 cm
(E1) Supply of Red Earth : 1 x 3150 x 0.0075 = 236.25
Supply of Super phosphate (50gm/sqm), Neem oil cake(250gm/sqm), Bone meal (250gm/sqm), Potash (50gm/sqm), Furadon(25gm/sqm), Ammonium sulphate (100gm/sqm) :
Supply of lawn Grass-
Buffalo grass (dibbling)
Labour Cost: For mixing Inputs as per proportion prescribed, spreading, applying fertilizers as per quantity prescribed, final leveling and dibbling with lawn grass at a spacing of 5cm x5cm & as per t...
AROUND POND/LAKE
PLANTING OF TREES:- (a)Base work: Digging pits of size 0.75 x 0.75x 0.75m and filling upto 50% of the pit with top excavated soil and remaining 50% with 1:2:3 proportion of sand (0.0...
Cost of Plants:-
5'-10' Height : including transportation and handling charges
(c) Names of Trees: Tabebuia Species/ Tecoma Species/ Michelia champaca/ Cassia Species/ Pongamia glabra/ Callistemon la...
Supply of Red Earth/Clay: 20 x 0.05 = 1.00
Supply of FYM: 20 x 0.05 = 1.00
Cost of Plants:
including transportation and handling charges (MR)
Nelumbo nucifera, Nymphaea, caerulea, Nymphaea lotus- 40 plants
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
TENDER DOCUMENT SADH MUDHOL.docx
Tender Document • 0.10 MB
PLAN.pdf
Design Document • 2.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].