Karnataka State Horticulture Department
Developing Graden at TMC park Mudhol
250718
KSHD/2025-26/OW/WORK_INDENT33/CALL-2
Open
Other Works
KSHD SeniorAssitant Director ZP Office Mudhol
₹590
₹56,000
20 Dec 2025
20 Dec 2025
31 Dec 2025
26 Dec 2025
Developing Graden at TMC park Mudhol
Cutting & clearing thick and thin undergrowth plants (including plants upto 0.25 M girth) & bushes including removal of roots with an initial lead of 50.M. & lift of 1.50 M.
PLANTING OF SHRUBS (a) Base work:- Digging pits of 0.45 x 0.45 x 0.45m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt)...
Cost of Plants:
including transportation and handling charges
Along the Compound Wall
1. Caesalpinia species -183 nos (Spacing 2 mt distance)
Along the Center Path, Way to Children path and Gazebo
PLANTING OF SHRUBS / FOLIAGE PLANTS IN GROUPS:-
(a) Base work:- Digging of soil upto1.0m x 1.0m x 0.45m depth & filling 50% of the pit with top exavated soil and remaining 50% of the pit with 1:2:3 p...
nCost of Plants 8 plants per Sqm
including transportation and handling charges
Foliage group near entrance under ficus tree
Spathiphyllum, Philodendron, Aglaonema, Monstera deliciosa, Alpinia etc
Cost of Plants: 8 plants per Sqm
including transportation and handling charges
1. Ficus triangularis -232 plants
2. Ficus panda -232 plants
3. Eugenia - 232 plants
4. Schfflera -232 pl...
Cost of Plants: 8 plants per Sqm
including transportation and handling charges
Shrubs in circle
1. Euphorbia milli -112 plants
Cost of Plants: 8 plants per Sqm
including transportation and handling charges
Shrubs in Oval shape - Different height plants
1. Dracena/Croton species
2. Euphorbia milli
PLANTING OF HEDGES:-
(a) Base work:- Digging trench of size 1.0m x0.30m x 0.45m and filling upto 50% of the pit with top excavated soil and filling 50% of the trench with 1:2:3 proportion of sand (0....
SUPPLY OF HEDGE PLANTS
b) Cost of plants:- 7 Plants/Rmt
(including transportation and handling charges)
1. Plant- Clerodendrum Inerme/Duranta
PLANTING OF SPECIMEN PLANT:-
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red e...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
Digging pits of 0.75 x 0.75 x 0.75m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) and planting ...
PLANTING OF CREEPERS :-
SUPPLY OF ADDITIONAL RED EARTH FOR LEVELLING
1. Slope Area = 35 x 5.0 x 0.20 = 35 cum
2. For Raising 2nd step and 1st step in the Pony Tail Circle/Way to Children play ground c...
Base work:-Digging pits of 0.45 x 0.45 x 0.45m size mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.007cmt), FYM (0.014cmt) red earth (0.021cmt) an...
Cost of Plants:
including transportation and handling charges
1. Slope Area near Children's Garden -
Antigonon leptopus - 100 nos
2. Creepers for Pergola - Thunbergia
mysorensis (Lady's Slipper V...
PLANTING OF GROUND COVER PLANTS :-
(a) Base work:- Digging the area of 1m x 1m x 0.45m and mixing 50% of the pits with with top excavated soil and another 50% with 1:2:3 proportion of sand (0.0375cmt...
Cost of Plants:10 plants per Sqm
including transportation and handling charges
Under Traveller's Palm
Plant- Lantana Species -70 nos
Under Pony tail palm
1st Step - Tradescantia spathacea- Rhoeo pla...
BULBOUS BED (CANNA):-
(a) Base work: Developing bulbous beds by digging to a depth of 0.45m filling 50% of the area with excavate top soil remaining 50% with sand (0.0375cum), FYM (0.075cum), Red eart...
Cost of Plants :- Corms/Bulbs
including transportation and handling charges
(A) SCRAPPING AND REMOVING TOP SOIL :-Clearing the site by scrapping and removing top 0.15m soil to a minimum depth of 0.45M along with grass. Removing unwanted debris, grass along with excava...
1ST DIGGING:- Earth work digging for developing lawn including removing weeds, debris if any and breaking of clumps, watering etc.
2ND DIGGING:- Digging for second time removing weeds, if any and minor leveling.
SUPPLY OF RED EARTH: Supplying and stocking good Quality red earth for filling the top 6” area.
Providing of red earth, FYM and Sand in the ratio of 1:3:6 and spreading to a depth of 7.5 cm
(E1) Supply of Red Earth : 1 x 3150 x 0.0075 = 236.25
Supply of Super phosphate (50gm/sqm), Neem oil cake(250gm/sqm), Bone meal (250gm/sqm), Potash (50gm/sqm), Furadon(25gm/sqm), Ammonium sulphate (100gm/sqm) :
Supply of lawn Grass-
Buffalo grass (dibbling)
Labour Cost: For mixing Inputs as per proportion prescribed, spreading, applying fertilizers as per quantity prescribed, final leveling and dibbling with lawn grass at a spacing of 5cm x5cm & as per t...
AROUND POND/LAKE
PLANTING OF TREES:- (a)Base work: Digging pits of size 0.75 x 0.75x 0.75m and filling upto 50% of the pit with top excavated soil and remaining 50% with 1:2:3 proportion of sand (0.0...
Cost of Plants:-
5'-10' Height : including transportation and handling charges
(c) Names of Trees: Tabebuia Species/ Tecoma Species/ Michelia champaca/ Cassia Species/ Pongamia glabra/ Callistemon la...
Supply of Red Earth/Clay: 20 x 0.05 = 1.00
Supply of FYM: 20 x 0.05 = 1.00
Cost of Plants:
including transportation and handling charges (MR)
Nelumbo nucifera, Nymphaea, caerulea, Nymphaea lotus- 40 plants