Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.6 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹46.3 L+₹1.4 L (3.14%)Rejected-Finance A 103 VEERA GARDEN AMBEDKAR NAGAR ALWAR 301001 RAJ | ALWAR | RAJASTHAN | 301001 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹48.4 L+₹3.6 L (7.96%)Rejected-Finance PLOT NO 14 SHIV COLONY KATI GHATI RAJGARH ROAD ALWER RAJ | ALWAR | ALWAR | RAJASTHAN | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | Hitesh Construction L2 | DEMROT ELECTRICAL WORKS L1 | M/s Yash Electrical and Maintenance L3 |
|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n exc 30 cm and averging 15cm deep and getting out in soft/loose soil complete all as specified and directed. | 35 | Sqm | 25 ₹875 Lowest | 50 ₹1,750 | 50 ₹1,750 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth and n exc 1.50 m deep and getting out soft or loose soil Complete all as specified and directed. | 140 | Cum | 200 ₹28,000 | 150 ₹21,000 Lowest | 160 ₹22,400 |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5m in depth and n exc 3m deep and getting out soft or loose soil Complete all as specified and directed. | 50 | Cum | 450 ₹22,500 | 200 ₹10,000 Lowest | 200 ₹10,000 Lowest |
| 4.00 | Excavation of trenches in any type of soil n.exc 1.5 M wide and n.exc 1.5 M in depth for pipe lines and getting out in soft/loose soil forming bottom surfaces to required gradients complete all as specified and as directed. | 128 | cum | 200 ₹25,600 | 150 ₹19,200 Lowest | 200 ₹25,600 |
| 5.00 | Returning filling in, including spreading, levelling, watering and well ramming in layers n.exc. 25cm deep as in soft/loose soil Complete all as specified and directed. | 177 | Cum | 75 ₹13,275 | 50 ₹8,850 Lowest | 100 ₹17,700 |
| 6.00 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point Complete all as specified and directed. | 146.25 | Cum | 75 ₹10,968.75 | 50 ₹7,312.5 | 20 ₹2,925 Lowest |
| 7.00 | M&L for hard core of broken stone or boulders of gauge n.exc. 63mm deposited spread and levelled in layers n.exc. 15 cm thick watered and rolled/ rammed to a true surface complete all as specified and directed. | 3.6 | Cum | 2,500 ₹9,000 | 1,500 ₹5,400 Lowest | 2,000 ₹7,200 |
| 8.00 | M&L PCC 1:4:8 type D2 using 40mm graded stone aggregate as in foundation Complete all as specified and directed. | 8 | Cum | 3,500 ₹28,000 Lowest | 4,000 ₹32,000 | 5,400 ₹43,200 |
| 9.00 | M&L for form work to sides of concrete foundation, footing, bases of columns, plinth beams and similar work, vertical or to batten rough finish flat surfaces on concrete complete all as specified and directed. | 13 | Sqm | 250 ₹3,250 | 200 ₹2,600 Lowest | 315 ₹4,095 |
| 10.00 | M&L for form work to sides and soffit of floor RCC walls or floor beam, beam hauchings, girders, bressummers, lintels, cantilevers, shelves including sup-ports, overhangs etc also splays between floors and bemss etc rough finish flat surfaces on concrete complete all as specified and directed. | 150 | Sqm | 300 ₹45,000 Lowest | 300 ₹45,000 Lowest | 540 ₹81,000 |
Tender Value
₹47.6 L
EMD Value
₹96,000
Closing Date
2 Apr 2026, 6:00 pmClosed
GE Alwar
Alwar
PROVN OF UG SUMP WITH CONNECTED WORKS NEAR ITARANA PALACE OF ARTY DIV, SPL REPAIR/REPLACEMENT OF 01 NOS BOREWELL AND CONNECTED ITEMS AT JP LINE AND PROVN OF ESE LIGHTENING AND CONDUCTOR FOR ITARANA PALACE AT ALWAR MIL STN
2026_MES_755846_1
8514/E8
Open Tender
Civil Works - Water Works
Item Rate
180 days
Alwar
As per NIT
6 documents required · 6 mandatory
₹500
GE Alwar
₹96,000
Yes
20 Jul 2026
11 Mar 2026
4 Apr 2026
11 Mar 2026
2 Apr 2026
26 Mar 2026
11 Mar 2026 - 25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation n exc 30 cm and averging 15cm deep and getting out in soft/loose soil complete all as specified and directed. | 35 | Sqm | 1.25 | ₹43.75 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth and n exc 1.50 m deep and getting out soft or loose soil Complete all as specified and directed. | 140 | Cum | 100 | ₹14,000 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5m in depth and n exc 3m deep and getting out soft or loose soil Complete all as specified and directed. | 50 | Cum | 53 | ₹2,650 |
| 4 | Excavation of trenches in any type of soil n.exc 1.5 M wide and n.exc 1.5 M in depth for pipe lines and getting out in soft/loose soil forming bottom surfaces to required gradients complete all as specified and as directed. | 128 | cum | - | - |
| 5 | Returning filling in, including spreading, levelling, watering and well ramming in layers n.exc. 25cm deep as in soft/loose soil Complete all as specified and directed. | 177 | Cum | 10 | ₹1,770 |
| 6 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point Complete all as specified and directed. | 146.25 | Cum | 11 | ₹1,608.75 |
| 7 | M&L for hard core of broken stone or boulders of gauge n.exc. 63mm deposited spread and levelled in layers n.exc. 15 cm thick watered and rolled/ rammed to a true surface complete all as specified and directed. | 3.6 | Cum | 1.25 | ₹4.5 |
| 8 | M&L PCC 1:4:8 type D2 using 40mm graded stone aggregate as in foundation Complete all as specified and directed. | 8 | Cum | - | - |
| 9 | M&L for form work to sides of concrete foundation, footing, bases of columns, plinth beams and similar work, vertical or to batten rough finish flat surfaces on concrete complete all as specified and directed. | 13 | Sqm | - | - |
| 10 | M&L for form work to sides and soffit of floor RCC walls or floor beam, beam hauchings, girders, bressummers, lintels, cantilevers, shelves including sup-ports, overhangs etc also splays between floors and bemss etc rough finish flat surfaces on concrete complete all as specified and directed. | 150 | Sqm | 100 | ₹15,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tender8514.pdf
Tender Documents • 0.95 MB
BOQ_846615.xls
BOQ • 3.85 MB
Amendment02.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .