Tender Value
₹3.7 Cr
EMD Value
₹7.3 L
Closing Date
23 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
DEN/HQ
14 conditions · 3 needing a document upload
Item no 10.2 of GCC 2022: Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause 10.2 of Indian Railways Standard General Conditions of Contract'2022 with upto date correction slip. [Authority: Executive Director/Civil Engineering(G), Railway Board's letter No.2022/CE-I/CT/GCC-2022/Policy dated 14.07.2022]
SIMILAR NATURE OF WORK FOR THIS TENDER WILL BE - ANY CIVIL ENGINEERING WORK COMPRISING OF CONSTRUCTION OF ANY TYPE OF BRIDGE/BRIDGE JACKETING WORK vide PCE/ER/KKK letter no.W(6)Similar Nature of Work/Loose dated 08.11.2023, sl. No.21 of Bridge Works.
24 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Para 5(3) ii. Part I of GCC shall be read as under: The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids [i.e. excluding the last date of submission of bids] [Advance Correction Slip No.5 to Indian Railways Standard General Conditions of Contract, April 2022 vide Executive Director, Civil Engineering(G), Railway Board No.2022/CE-I/CT/GCC-2022/Policy dated 20.10.2023].
The participating Bidder must submit self certificate [Annexure V & VA as applicable] duly downloaded from the link given in Submission of Document Verification Certificate or documents uploaded along with tender. [Advance Correction Slip No.3 vide Executive Director, Civil Engineering(G), Railway Board No.2022/CE-I/CT/GCC-2022/Policy dated 26.04.2023 and Advance Correction Slip No.4 vide Executive Director, Civil Engineering(G), Railway Board No.2022/CE-I/CT/GCC-2022/Policy dated 07.08.2023 ].
Maintenance period of contract - The Earnest Money/Bid Security deposited by the contractor will be converted into Security Deposit and will be refunded after six months of the date of completion of the work in all respect to the entire satisfaction of the Railway and on receipt of a certificate from the Assistant Engineer concerned.
All documents in support of fulfillment of eligibility criteria with respect to completion of similar nature of work for Technical Eligibility Criteria and Total contract value for Financial Eligibility Criteria should be submitted/ uploaded online in the website with scanned copy at the time of tender bidding with details showing in Annexure I, IV. No post tender communication, in any form will be made or entertained, after opening of tenders, in this regard. Railways may however call for the originals of the credentials for verification or any clarifications/confirmations on the contents of the documents submitted. Eligibility of tenderers shall be decided solely of the basis of the documents submitted along with the tender offers and any subsequent document whatsoever submitted in this connection would not be given any cognizance for finalization of the tender.
Payment through Letter of Credit is applicable for this tender as per Railway Board's letter no 2017/ACII/9/10 Pt I dated 20.02.2018 & 2018/CE-I/CT/9 dt. 04.06.2018 (Annexure B & C attached).
INSTRUCTION TO BIDDERS: A] The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of his obligations or liabilities hereunder nor will it affect any rights of the railway there under. B] In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest Money Deposit [EMD], performance Guarantee [PG] and Security Deposit [SD] of contract forfeited and agency barred for doing business on entire Indian Railways for 5[five] years.
Shramik kalyan Contractor[s] are requested to get themselves registered on Railways Shramik kalian portal at www.shramikkalyan.indianrailways.gov.in after issuance of letter of acceptance.
Contractor(s)/ Bidders are requested to refer to Clause 46A of Indian Railways Standard General Conditions of Contract'2022 with up to date correction slip for Price Variation Clause (PVC) in works contract. Item no 46A.1 of GCC 2022: Price Variation Clause (PVC) shall be applicable only in tender having advertised value above Rs. 2 Crores. [Authority: Executive Director/Civil Engineering(G), Railway Board's letter No.2022/CE- I/CT/GCC-2022/Policy dated 14.07.2022]
For further details related to 'Bid Security' Bidders are requested to please connect para no 23 of the tender documents.
Bidders are requested to refer to para no 9 of tender document [Para 41 & 42 of Part II Standard General Conditions of Contract for "Variations in extent of Contract" of GCC 2022]
In case Agency desires submission of Bid Security in the form of Bank Guarantee, then please refer to para no 23(3) of Instruction to Tenderers for e-tenders, chapter I for further guidance. [Clause 5.0 of Part I of GCC 2022]
Bidders may also upload any relevant document as deemed fit.
GST has been considered during assessment of this instant tender. Tenderer(s) should quote rate inclusive of applicable GST.
Participants tenderer(s) are requested to go through the Railway Board letter no.2022/CE-I/CT/GCC-2022/POLICY/Pt.I(E-3320424) Dtd.13.03.2026 Indian Railways Standard General Conditions of Contract, April 2022 (Advance Correction slip No.11) which is enclosed in documents.
Strengthening of substructure by RCC Jacketting at RUB no.X-12, X-15, X-24, X-25 and X-8 in Kankurgachhi section of Sealdah Division.
TN-180-26-27~ER
TN-180-26-27
Open
Works - General
15 Months
Kolkata, West Bengal
₹0
₹7.3 L
25 Sept 2026
25 Sept 2026
9 Oct 2026
67 items across 2 schedules · ₹3,96,40,687.81 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | All kinds of soil | Sqm | 10700 | 34.15 | 3,65,405 |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | Sqm | 15000 | 17.6 | 2,64,000 |
| 3 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 150 | 7,878.5 | 11,81,775 |
| 4 | Cement mortar 1:4 (1 cement : 4 coarse sand) | cum | 150 | 7,370.65 | 11,05,597.5 |
| 5 | Cement mortar 1:4 (1 cement : 4 coarse sand) | cum | 150 | 9,344.35 | 14,01,652.5 |
| 6 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Kg | 2700 | 117.35 | 3,16,845 |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Kg | 7000 | 133.7 | 9,35,900 |
| 8 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | Sqm | 750 | 792.05 | 5,94,037.5 |
| 9 | 1:6 (1 cement: 6 coarse sand) | Sqm | 500 | 343.65 | 1,71,825 |
| 10 | 1:4 (1 cement: 4 fine sand) | Sqm | 1000 | 425.55 | 4,25,550 |
| 11 | Flush / Ruled/ Struck or weathered pointing | Sqm | 200 | 257.35 | 51,470 |
| 12 | New work (Two or more coats applied @ 1.43 litre/ 10 sqm. Over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm. | Sqm | 1500 | 181.25 | 2,71,875 |
| 13 | On concrete work | Sqm | 7000 | 235.15 | 16,46,050 |
| 14 | Old work (Two or more coats applied @ 1.43 ltr/ 10 sqm) over existing cement paint surface | Sqm | 5500 | 131.3 | 7,22,150 |
| 15 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | cum | 50 | 2,434.25 | 1,21,712.5 |
| 16 | In cement mortar | cum | 70 | 2,060.2 | 1,44,214 |
| 17 | Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. | cum | 50 | 2,818.9 | 1,40,945 |
| 18 | 53 mm to 22.4 mm size stone aggregate | cum | 180 | 1,842.3 | 3,31,614 |
| 19 | Stone screening 11.2 mm nominal size (Type B) | cum | 58 | 2,247.75 | 1,30,369.5 |
| 20 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . | cum | 288 | 1,046.95 | 3,01,521.6 |
| 21 | Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity. | Sqm | 957 | 33.3 | 31,868.1 |
| 22 | On W.B.M. @ 0.75 Kg / sqm | Sqm | 957 | 60.5 | 57,898.5 |
| 23 | On bituminous surface @ 0.50 Kg / sqm | Sqm | 957 | 48.2 | 46,127.4 |
| 24 | With paving Asphalt grade VG - 30 with no solvent | Sqm | 957 | 294.95 | 2,82,267.15 |
| 25 | For 50 mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm. | Sqm | 957 | 505.65 | 4,83,907.05 |
| 26 | Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete. | Sqm | 957 | 88.55 | 84,742.35 |
| 27 | Overhead informatory road signage | Sqm | 62 | 5,879.9 | 3,64,553.8 |
| Schedule total | ₹1,19,75,873.45 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-B-LOC.pdf
ATTACHMENT
SHRAMIKKALYAN.pdf
ATTACHMENT
Cesscharge.pdf
ATTACHMENT
ComlCompliance-IVVVIVIIVIIIIXXI.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
ANNEXURE-C-LOC2.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
annexureVIBcontractualturnoverdata.pdf
ATTACHMENT
annexureVIABidsecurity.pdf
ATTACHMENT
Annexure--I_a_I_b_IIIII-TechComp.pdf
ATTACHMENT
tmtbarsdecontrolled.pdf
ATTACHMENT
Annexure-V_VA.pdf
ATTACHMENT
GCCACSUPRO_10.pdf
ATTACHMENT
TenderDocumentChapterI-II.pdf
ATTACHMENT
JPODIGGING.pdf
ATTACHMENT
LetterregardingrecommendedlistofBrands_makeofmaterialsdated03.09.2025.pdf
ATTACHMENT
IRStandardGCC2022AdvanceCorrectionSlipNo11.pdf
ATTACHMENT
IRStandardGCC2022AdvanceCorrectionSlipNo12.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .