| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | -14.99% | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.5 L+₹59,271.07 (9.98%)Admitted-Finance | -6.51% | ₹6.5 L+₹59,271.07 (9.98%) | L2 | Admitted-Finance |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
13 Aug 2026, 10:00 amClosed
DCF Sariska Tiger Reserve
DCF Sariska Tiger Reserve
Maintenance of building Division Office Room no. 2 near store shakha
2026_FORES_583841_1
8276
Open Tender
Civil Works
Percentage
180 days
DCF Sariska Tiger Reserve
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
DCF Sariska Tiger Reserve
₹14,000
19 Aug 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn cement mortar.
Room no. 1 and 2 | 6.33 | cum | 641 | ₹4,057.53 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.
1: 3: 6 or richer mix.
Room no. 1 and 2 | 7.34 | cum | 637 | ₹4,675.58 |
| 3 | Dismantling old plaster or skirting, raking out joints and
cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. | 270.9 | sqm | 15 | ₹4,063.5 |
| 4 | Dismantling stone slab roofing over wooden karries and battens (dismantling karries and battens to be paid for separately) including stacking of serviceable material and disposal of unserviceable material within 50 meter lead: | 22.02 | cum | 700 | ₹15,414 |
| 5 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead.for girder | 700 | kg | 2 | ₹1,400 |
| 6 | Brick work with F.P.S. bricks of class designation 75 in
superstructure above plinth level upto floor V level in all
shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 11.85 | cum | 4,990 | ₹59,131.5 |
| 7 | Providing and laying in position specified grade of cement concrete for RCC structural elements up to floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chhajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc. M20 grade Nominal Mix / Design Mix ( Roof ) | 11.46 | cum | 5,185 | ₹59,420.1 |
| 8 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for up to floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 79.27 | sqm | 340 | ₹26,951.8 |
| 9 | Providing and fabricating reinforcement for R.C.C. workIncluding straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five levels. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Cold twisted deformed bars (IS : 1786). | 1,200 | kg | 77 | ₹92,400 |
| 10 | Labour charges for cutting, bending for fabrication andbinding reinforcement (plain or tor/ribbed/TMT steel) as per drawing and design for R.C.C. and R.B. work including cost of binding wire with all lead and lift up to floor five level complete. | 1,200 | kg | 12 | ₹14,400 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.22 MB
BOQ_1037065.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .