Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC 1 WARD NO 01 RAVIDAS MANDIR KHARKHODA SONIPAT HARYANA 131402 | SONIPAT | HARYANA | 131402 | ₹5.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹5.3 L+₹534.31 (0.10%)Rejected-Finance | ₹5.3 L+₹534.31 (0.10%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.5 L+₹18,106.86 (3.43%)Rejected-Finance | ₹5.5 L+₹18,106.86 (3.43%) | L3 | Rejected-Finance L3 |
| 4 | L4₹5.6 L+₹30,930.08 (5.87%)Rejected-Finance | ₹5.6 L+₹30,930.08 (5.87%) | L4 | Rejected-Finance L4 |
| 5 | L5₹5.7 L+₹42,744.06 (8.11%)Rejected-Finance WARD NO 15 NEAR GANGA MARKET ROHTAK ROAD GOHANA | GOHANA | HARYANA | ₹5.7 L+₹42,744.06 (8.11%) | L5 | Rejected-Finance L5 |
Tender Value
₹5.9 L
EMD Value
₹14,020
Closing Date
26 Dec 2025, 5:00 pmClosed
ASHOK KUMAR
Municipal Committee Kalanaur
Installation of sign boards for all newly selected ward represenatives in MC Kalanaur
2025_HRY_491514_1
2025A64B72E5 958C 485E A8E4 1B196D145DDB318ULB
Open Tender
Civil Works
Works
120 days
Kalanaur
2 documents required · 2 mandatory
₹1,000
₹14,020
Yes
24 Feb 2026
18 Dec 2025
29 Dec 2025
18 Dec 2025
26 Dec 2025
18 Dec 2025
HSR Item 6.1.1-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 3975.00 Through Rate
HSR Item 2.RM174- RM174. High intensity Micro prismatic grade Retro reflective sheeting Type XI as per IRC 67 2012 including pasting on board base HSR Rate(Rs.) 2233.00 Rate
HSR Item 2.RM176- RM176. Labour work for manufacturing signs, such as cutting, plotting, pasting with transfer tape HSR Rate(Rs.) 268.00 Rate
HSR Item 2.RM177- RM177. Epoxy paint of approved quality two coats HSR Rate(Rs.) 174.00 Rate
HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works HSR Rate(Rs.) 83.00 Through Rate
HSR Item 5.23.2-Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) HSR Rate(Rs.) 1149.00 Through Rate
HSR Item 3.1.1-By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish HSR Rate(Rs.) 66.00 5km
HSR Item 10.100.2-Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. HSR Rate(Rs.) 1863.00 Through Rat
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_569838.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .