| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.5 CrAccepted-AOC | ₹11.5 Cr | 1 | Accepted-AOC Approved by Chief Engineer, Central Zone-B, PWD, A.P., Pasighat vide No.CEAP(CZ-B)/W-5/CRIF/Tender/Boleng Circle/22-23/7043-45 Dated 09/02/2023 |
| 2 | 2₹11.5 CrRejected-Finance | ₹11.5 Cr | 2 | Rejected-Finance Rejected by Chief Engineer, Central Zone-B, PWD, A.P., Pasighat vide No.CEAP(CZ-B)/W-5/CRIF/Tender/Boleng Circle/22-23/7043-45 Dated 09/02/2023 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Rejected on ground of non production of domicile certificate (PRC) of the proprietor. |
Tender Value
₹11.5 Cr
EMD Value
₹11.5 L
Closing Date
29 Dec 2022, 11:00 amClosed
Executive Engineer, Mariyang Division, PWD
O/o Executive Engineer Mariyang Division PWD
Construction of road from Mindi Yorbe to Government Model College, Geku in Upper Siang District
2022_PWDAP_945_1
NIT NO.- 02/2022-23/MRGD/GSD DATED 25/11/2022
Open Tender
Civil Works – Roads
730 days
Geku
approved and enlisted contractors of Class I under APPWD, domiciled within territorial jurisdiction of Upper Siang District
3 documents required · 3 mandatory
₹15,000
Executive Engineer, Mariyang P.W. Division
₹11.5 L
Office of the Executive Engineer PWD, AP, Mariyang
13 Feb 2023
15 Dec 2022
30 Dec 2022
15 Dec 2022
29 Dec 2022
18 Dec 2022
16 Dec 2022
Amount
JUNGLE CLEARANCE[10.50 Km]
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
a) Girth from 300 mm to 600 mm
b) Girth from 600 mm to 900 mm
Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials.....
a) In area of light jungle
b) In area of thorny jungle
WIDENING & FORMATION CUTTING [10.50 KM]
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
Excavation in Hard Rock (blasting prohibited) (Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
A) Mechanised
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)
GSB [10.45 KM]
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) 'i)For grading- I Material
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
RCC SLAB CULVERT 1.00 M SPAN -12 NOS
Excavation for Structures (Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
I-Ordinary soil
B-Mechanical Means
(i) Depth up to 3 m
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed rubble masonry (first sort )
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Height Upto 5m
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A Granular material.
Providing weep holes in Brick masonry/ Plain /Reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
RCC SLAB CULVERT 2.00 M SPAN -15 NOS
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Mechanical Means
upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M15
Height upto 5m
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications.
a) Coursed rubble masonry (first sort )
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification.
Granular material
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification.
RCC Grade M20
Using Concrete Mixer
Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications.
RCC SLAB CULVERT 4.00 M SPAN -1 NO
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Mechanical Means
upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M15
Height upto 5m
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications.
Coursed rubble masonry (first sort )
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification.
Granular material
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification.
RCC Grade M20
Using Concrete Mixer
Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications.
RCC SLAB CULVERT 6.00 M SPAN -1 NO
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Mechanical Means
upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M15
Height upto 5m
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications.
Coursed rubble masonry (first sort )
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification.
Granular material
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification.
RCC Grade M20
Using Concrete Mixer
Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications.
RETAINING WALL (3.00 M HT)- 112.00 MTR
Excavation for Structures (Earth work in excavation of foundation of structuresas per drawing and technical specification, including settingout, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Mechanical Means (Depth upto 3 m)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular Material.
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
BREAST WALL (3.00 M HT)- 100.00 MTR
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Mechanical Means
Depth upto 3 m
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for sub-structure complete as per drawing and Technical Specification
Random Rubble Masonry
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
Granular material
CC DRAIN- 10.45 KM
Excavation for Structures (Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
I-Ordinary soil
B-Mechanical Means
(i) Depth up to 3 m
PCC 1:3:6 in foundation (PCC 1:3:6 nominal mixed in foundation with crash stone aggregrate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration i/c curing for fourteen days
Centering and Shuttering including strutting,propping etc and removal of form work
a) Foundations and plinth
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
Pipeline Shifting
M/s Tani Takar Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid